Line 2: |
Line 2: |
| | number = ML063390079 | | | number = ML063390079 |
| | issue date = 12/20/2006 | | | issue date = 12/20/2006 |
| | title = Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, Response to Bulletin 2005-02 | | | title = and Salem Nuclear Generating Station, Units 1 and 2, Response to Bulletin 2005-02 |
| | author name = Bailey S N | | | author name = Bailey S |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 |
| | addressee name = Levis W | | | addressee name = Levis W |
Line 9: |
Line 9: |
| | docket = 05000272, 05000311, 05000354 | | | docket = 05000272, 05000311, 05000354 |
| | license number = DPR-070 | | | license number = DPR-070 |
| | contact person = Bailey S N | | | contact person = Bailey S |
| | case reference number = BL-05-002, TAC MC7831, TAC MC7870, TAC MC7871 | | | case reference number = BL-05-002, TAC MC7831, TAC MC7870, TAC MC7871 |
| | document type = Letter | | | document type = Letter |
Revision as of 09:15, 13 July 2019
|
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek 2024-02-05
[Table view] |
Text
December 20, 2006Mr. William LevisSenior Vice President & Chief Nuclear Officer PSEG Nuclear LLC - N09 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION, AND SALEM NUCLEARGENERATING STATION, UNITS 1 AND 2, RESPONSE TO BULLETIN 2005-02 (TAC NOS. MC7831, MC7870 AND MC7871)
Dear Mr. Levis:
On July 18, 2005, the Nuclear Regulatory Commission (NRC) issued Bulletin (BL) 2005-02,"Emergency Preparedness and Response Actions for Security-Based Events," (Agencywide Documents Access and Management System (ADAMS) Accession No. ML051740058) to all holders of operating licenses for nuclear power reactors, except those who have permanently ceased operation and have certified that fuel has been removed from the reactor vessel.BL 2005-02 notified licensees of the NRC staff's need for information associated withemergency preparedness for security-based events at nuclear power plants. The purpose of BL 2005-02 was for the NRC to obtain information regarding changes licensees have made or plan to make concerning security-based emergency preparedness program capabilities, and to evaluate how consistently such changes have been implemented. Licensees were requested to respond to questions and provide information in the following areas: a) security-based emergency classification levels and emergency action levels; b) NRC notifications; c) onsite protective measures; d) emergency response organization augmentation; and e) drill and exercise programs.The Nuclear Energy Institute (NEI) developed a White paper, entitled "Enhancements toEmergency Preparedness Programs for Hostile Action," dated May 2005 (revised November 18, 2005) (ADAMS Accession No. ML053290326) to clarify various options available to licensees to implement the enhancements discussed in BL 2005-02. By letter dated November 22, 2005, NEI requested endorsement of these options. The NRC staff issued Regulatory Issue Summary 2006-12 on July 19, 2006, endorsing this White paper with clarifications.By letter dated August 17, 2005 (ADAMS Accession No. ML052360319), PSEG Nuclear LLC(PSEG), the licensee for the Hope Creek Generating Station and the Salem Nuclear Generating Station, Unit Nos. 1 and 2, responded to BL 2005-02. In the response, PSEG indicated that it either had already, or would in the future, incorporate enhancements consistent with the information provided in either BL 2005-02 or the NEI White paper. With the exception of the drill and exercise program enhancements area addressed by BL 2005-02, all licensees indicated that all enhancements were scheduled to be adopted no later than February 16, 2006.
The majority of licensees indicated that they would adopt the drill and exercise program W. Levis-2-enhancements contingent on NRC and Department of Homeland Security endorsement of anew evaluated exercise program. Based on the above, PSEG's response to BL 2005-02 is considered acceptable and no further action is requested at this time.If you have any questions, please contact me at (301) 415-1321 or at snb@nrc.gov.Sincerely,/RA/Stewart N. Bailey, Senior Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-354, 50-272 and 50-311 cc: See next page Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:Mr. Dennis Winchester Vice President - Nuclear Assessment PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Thomas P. JoyceSite Vice President - Salem PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. George P. BarnesSite Vice President - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. George H. GellrichPlant Support Manager PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Carl J. FrickerPlant Manager - Salem PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Michael J. MassaroPlant Manager - Hope Creek PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038Mr. James MallonManager - Licensing 200 Exelon Way, KSA 3-E Kennett Square, PA 19348Jeffrie J. Keenan, EsquirePSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Michael JesseManager, Regulatory Assurance, Hope Creek P.O. Box 236 Hancocks Bridge, NJ 08038Mr. Steven MannonManager, Regulatory Assurance, Salem P.O. Box 236 Hancocks Bridge, NJ 08038Township ClerkLower Alloways Creek Township Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038Mr. Paul Bauldauf, P.E., Asst. DirectorRadiation Protection Programs NJ Department of Environmental Protection and Energy
CN 415 Trenton, NJ 08625-0415Mr. Brian BeamBoard of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102Regional Administrator, Region IU.S. Nuclear Regulatory Commission
475 Allendale Road King of Prussia, PA 19406Senior Resident InspectorSalem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038Senior Resident InspectorHope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038
ML063390079OFFICELPL1-2/PMLPL1-2/LAPGCB/BCLPL1-2/BCNAMESBaileyCRaynorCJacksonHChernoffDATE12/13/0612/13/0610/31/06*12/20/06*by memo