ML12311A020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/25/2012
| issue date = 10/25/2012
| title = Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents
| title = Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents
| author name = Swank D A
| author name = Swank D
| author affiliation = Energy Northwest
| author affiliation = Energy Northwest
| addressee name =  
| addressee name =  

Revision as of 13:58, 22 June 2019

Initial Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents
ML12311A020
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/25/2012
From: Swank D
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02-12-150
Download: ML12311A020 (4)


Text

SDavid A. Swank Columbia Generating Station P.O. Box 968, PE23 (K ': NERGYPh i WA 99352-0968 NORTHW ESTdaswank@energy-northwest.com October 25, 2012 10 CFR 2.202 G02-12-150 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE HARDENED CONTAINMENT VENTS

Reference:

1. NRC Order Number EA-1 2-050, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents 2. NRC Interim Staff Guidance JLD-ISG-2012-02, Compliance with Order EA-1 2-050, Reliable Hardened Containment Vents, Rev 0, August 29, 2012

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the referenced Order (Reference

1) to Columbia Generating Station (Columbia).

Reference 1 directs Columbia to have a reliable hardened vent (RHV) to remove decay heat and maintain control of containment pressure within acceptable limits following events that result in the loss of active containment heat removal capability or prolonged station blackout (SBO). Specific requirements are outlined in Attachment 2 of Reference

1. Full implementation is required no later than either two refueling cycles after submittal of the overall integrated plan or by December 31, 2016, whichever comes first.Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance.

The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference

2. This report confirms Energy Northwest, the licensee for Columbia, has received Reference 2 and is in the process of evaluating the guidance for the purpose of having a RHV to remove decay heat and maintain control of containment pressure within acceptable limits following events that result in the loss of active containment heat removal capability or prolonged SBO as described in Attachment 2 of Reference
1.

ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE HARDENED CONTAINMENT VENTS Page 2 of 2 Reference 2, Section 4.0 contains the specific reporting requirements for the initial status report. The following information provides the status pursuant to Section 4.0 of Reference 2.Major activities completed during this reporting period:* Identification of resources and initiation of project plans, including development of milestones, to assure compliance with Reference 1." Continued participation in industry activities on issue.Planned activities for the next six months:* Development and submittal of the overall integrated plan." Completion of a conceptual design and commencement of a final design.No technical difficulties have been identified at this time that could affect the ability to provide the February 28, 2013, submittal.

Project milestones scheduled through completion of installation and testing: " A project milestones schedule will be provided with the overall integrated plan." Implementation of the order will be completed for Columbia prior to startup from Refueling Outage R22. This outage is scheduled to begin on May 1, 2015.There are no new commitments contained in this letter. If you have any questions regarding the above, please contact Mr. Z. K. Dunham at (509) 377-4735.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.Respectfully, D. A. Swank Assistant Vice President, Engineering cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C AJ Rapacz -BPA/1 399 David A. Swank EN RG Columbia Generating Station P.O. Box 968, PE23 NTERichland, WA 99352-0968 Ph. 509-377-2309 I F. 509-377-2354 daswank @ energy-northwest.com October 25, 2012 10 CFR 2.202 G02-12-151 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE SPENT FUEL POOL INSTRUMENTATION

Reference:

1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, Rev 0, August 29, 2012

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the referenced Order (Reference

1) to Columbia Generating Station (Columbia).

Reference 1 directs Columbia to have reliable spent fuel pool level instrumentation.

Specific requirements are outlined in Attachment 2 of Reference

1. Full implementation is required no later than either two refueling cycles after submittal of the overall integrated plan or by December 31, 2016, whichever comes first.Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance.

The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference

2. This report confirms Energy Northwest, the licensee for Columbia, has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in the spent fuel storage pool as described in Attachment 2 of Reference
1.

ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION Page 2 of 2 Major activities completed during this reporting period: " Identification of resources and initiation of project plans, including development of milestones, to assure compliance with Reference 1.* Continued participation with industry in selecting a technology to be used and parameters to be considered.

Planned activities for the next six months: " Development and submittal of the overall integrated plan.* Development of a conceptual design.No technical difficulties have been identified at this time that could affect the ability to provide the February 28, 2013, submittal.

Project milestones scheduled through completion of installation and testing: " A project milestones schedule will be provided with the overall integrated plan." Implementation of the order will be completed for Columbia prior to startup from Refueling Outage R22. This outage is scheduled to begin on May 1, 2015.There are no new commitments contained in this letter. If you have any questions regarding the above, please contact Mr. Z. K. Dunham at (509) 377-4735.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.Respectfully, D. A. Swank Assistant Vice President, Engineering cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C AJ Rapacz -BPA/1 399