|
|
Line 3: |
Line 3: |
| | issue date = 08/09/2013 | | | issue date = 08/09/2013 |
| | title = Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. | | | title = Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. |
| | author name = Wang A B | | | author name = Wang A |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000458 | | | docket = 05000458 |
| | license number = NPF-047 | | | license number = NPF-047 |
| | contact person = Wang A B | | | contact person = Wang A |
| | case reference number = TAC ME9450 | | | case reference number = TAC ME9450 |
| | document type = Letter, Environmental Assessment, Federal Register Notice, Finding of No Significant Impact | | | document type = Letter, Environmental Assessment, Federal Register Notice, Finding of No Significant Impact |
Line 21: |
Line 21: |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12241A250). | | Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12241A250). |
| Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident. | | Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident. |
| .. " The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure. | | .. " The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure. |
Line 37: |
Line 37: |
| 301-287-3422; e-mail: CaroI.Gallagher@nrc.gov. NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC Library at http://www.nrc.govlreading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 800-397-4209,301-415-4737, or bye-mail to pdr.resource@nrc.gov. | | 301-287-3422; e-mail: CaroI.Gallagher@nrc.gov. NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC Library at http://www.nrc.govlreading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 800-397-4209,301-415-4737, or bye-mail to pdr.resource@nrc.gov. |
| The ADAMS accession number for each document referenced in this notice is provided the first time that a document is referenced. | | The ADAMS accession number for each document referenced in this notice is provided the first time that a document is referenced. |
| The application for exemption dated August 23,2012, is available electronically under ADAMS Accession No. ML 12241A250. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR , Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. SUPPLEMENTARY INFORMATION: | | The application for exemption dated August 23,2012, is available electronically under ADAMS Accession No. ML12241A250. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR , Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. SUPPLEMENTARY INFORMATION: |
| I. Introduction The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption from 10 CFR Part 50, Appendix J for Facility Operating License No. NPF-47, issued to Entergy Operations, Inc. (the licensee), for operation of the River Bend Station, Unit 1 (RBS), located in West Feliciana Parish, Louisiana. | | I. Introduction The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption from 10 CFR Part 50, Appendix J for Facility Operating License No. NPF-47, issued to Entergy Operations, Inc. (the licensee), for operation of the River Bend Station, Unit 1 (RBS), located in West Feliciana Parish, Louisiana. |
| Therefore, as required by 10 CFR 51.21, the NRC performed an environmental assessment. | | Therefore, as required by 10 CFR 51.21, the NRC performed an environmental assessment. |
Line 63: |
Line 63: |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12241A250). | | Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12241A250). |
| Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident..." The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure. | | Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident..." The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure. |
| The assessment is being forwarded to the Office of the Federal Register for publication. | | The assessment is being forwarded to the Office of the Federal Register for publication. |
| Sincerely, IRA! Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. | | Sincerely, IRA! Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. |
| Environmental cc w/encl: Distribution via DISTRIBUTION: | | Environmental cc w/encl: Distribution via DISTRIBUTION: |
| PUBLIC RidsNrrDorlLpl4 Resource Branch Reading File RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMRiverBend Resource RidsNrrDlrRerb Resource RidsRgn4MailCenter Resource ADAMS Accession Nos. Letter ML 13203A123; EA ML 13203A126 NRR/DLR/RERB/BC OFFICE NRRlDORULPL4/PM NRRlDORLlLPL4/LA JBurkhardt SKlementowicz for MWong 7/29/13 7/23/13 NRRlDORLlLPL4/PM NRRlDORLlLPL4/BC Flyon for AWang MMarkley 8/9/13 8/9/13 AWang OFFICIAL RECORD COPY}} | | PUBLIC RidsNrrDorlLpl4 Resource Branch Reading File RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMRiverBend Resource RidsNrrDlrRerb Resource RidsRgn4MailCenter Resource ADAMS Accession Nos. Letter ML13203A123; EA ML13203A126 NRR/DLR/RERB/BC OFFICE NRRlDORULPL4/PM NRRlDORLlLPL4/LA JBurkhardt SKlementowicz for MWong 7/29/13 7/23/13 NRRlDORLlLPL4/PM NRRlDORLlLPL4/BC Flyon for AWang MMarkley 8/9/13 8/9/13 AWang OFFICIAL RECORD COPY}} |
Letter Sequence Other |
---|
|
|
MONTHYEARRBG-47278, Request for Exemption to 10 CFR 50 Appendix J2012-08-23023 August 2012 Request for Exemption to 10 CFR 50 Appendix J Project stage: Request ML12271A2592012-09-27027 September 2012 Acceptance Review E-mail, Request for Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa Project stage: Acceptance Review ML13203A1262013-08-0909 August 2013 FRN, Environmental Assessment and Finding of No Significant Impact - Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. Project stage: Other ML13203A1232013-08-0909 August 2013 Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. Project stage: Other ML13203A1302013-08-20020 August 2013 FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa Project stage: Other NRC-2013-0190, FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa2013-08-20020 August 2013 FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa Project stage: Other ML13203A1282013-08-21021 August 2013 Letter, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa Project stage: Other 2013-08-20
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation 2024-09-24
[Table view] Category:Environmental Assessment
MONTHYEARML20155K8052020-11-23023 November 2020 Encl. Environmental Assessment Memo to File to File: Environmental Assessment and Finding of No Significant Impact for Entergy Operations, Inc., Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for River Ben ML20150A3002020-11-23023 November 2020 Enclosure - Environmental Assessment Memo to File: Environmental Assessment and Finding of No Significant Impact for Entergy Operations, Inc. Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Grand Gulf I ML13203A1262013-08-0909 August 2013 FRN, Environmental Assessment and Finding of No Significant Impact - Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. ML13203A1232013-08-0909 August 2013 Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. ML1026404002010-09-28028 September 2010 Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML1026403952010-09-28028 September 2010 Letter, Environmental Assessment and Finding of No Significant Impact Re License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel NRC-2010-0315, Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel2010-09-28028 September 2010 Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML0224102312002-08-28028 August 2002 Environmental Assessment, Definition of Total Effective Dose Equivalent 2020-11-23
[Table view] Category:Federal Register Notice
MONTHYEARML24067A0372024-03-20020 March 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - February 2024 ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20129K0532020-05-21021 May 2020 FRN: Withdrawal of an Amendment Request to Extend Implementation Date for Amendment No. 197 Associated with the Revision to the Emergency Action Level Scheme ML20161A1092020-05-21021 May 2020 FRN: Withdrawal of an Amendment Request to Extend Implementation Date for Amendment No. 197 Associated with the Revision to the Emergency Action Level Scheme ML20084H3222020-03-30030 March 2020 FRN Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML20084H5822020-03-30030 March 2020 Cover Letter - Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18277A2062018-12-20020 December 2018 Federal Register Notice (FRN) for Issuance of Renewal Facility Operating License for River Bend Station, Unit 1 ML18302A3382018-11-0808 November 2018 Federal Register Notice - Notice of Availability of the Final Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 ML18124A0632018-05-17017 May 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication NRC-2018-0102, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication2018-05-17017 May 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order for 6/5/18 Publication ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 NRC-2017-0239, Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010)2017-12-26026 December 2017 Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010) ML17340B1802017-12-26026 December 2017 Arkansas Units 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - FRN - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CAC Nos. MG0258-MG0262; EPID L-2017-LLM-0010) ML17340B2582017-12-21021 December 2017 Arkansas 1 & 2, Grand Gulf Unit 1, River Bend Unit 1, and Waterford Unit 3 - Letter - Consideration of Approval of Direct and Indirect Transfer of Licenses and Conforming Amendments (CACs MG0258, MG0259, MG0260, MG0261, MG0262; EPID L-2017- ML17223A1142017-09-14014 September 2017 FRN Scoping Period River Bend ML17228A7372017-08-30030 August 2017 FRN River Bend Station, Unit 1 - License Renewal Application Opportunity to Request a Hearing and to Petition for Leave to Intervene Docket Id NRC-2017-0141 - Correction ML17173A1332017-08-0909 August 2017 FRN River Bend Acceptability for Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene ML17156A0982017-06-19019 June 2017 Receipt and Availability FRN - License Renewal Application for River Bend, Unit 1 ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML15139A1012015-08-14014 August 2015 FRN Order Approving Direct and Indirect Transfers of License and Conforming Amendment ML14295A2522014-11-13013 November 2014 and Waterford, Unit 3, Letter, Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments ML14295A1932014-11-13013 November 2014 and Waterford, Unit 3 - FRN, Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments ML14303A3812014-10-31031 October 2014 Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20142014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML14051A6712014-03-0404 March 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 ML13203A1302013-08-20020 August 2013 FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa NRC-2013-0190, FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa2013-08-20020 August 2013 FRN, Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13203A1262013-08-0909 August 2013 FRN, Environmental Assessment and Finding of No Significant Impact - Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. ML13203A1232013-08-0909 August 2013 Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. ML13078A2682013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-47 NRC-2012-0318, Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-472013-05-0303 May 2013 Order Approving Direct and Indirect Transfer of Facility Operating No. NPF-47 ML13025A3212013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction FRN, Biweekly Notice of Issuance of Amendments Published on 1/22/13, Revise QA Program Manual and Staff Quali ML12325A3872012-12-21021 December 2012 Letter, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Opportunity for a Hearing ML12325A3942012-12-21021 December 2012 FRN, Notice of Consideration of Approval of Indirect and Direct Transfer for Facility Operating License and Opportunity for a Hearing ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2011-0290, Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 20112011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 ML11349A0052011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 NRC-2009-0572, G20090487/EDATS: OEDO-2009-0517 - Notice of Issuance of Directors Decision Under 10 CFR 2.2062011-11-0808 November 2011 G20090487/EDATS: OEDO-2009-0517 - Notice of Issuance of Directors Decision Under 10 CFR 2.206 ML1128705662011-11-0808 November 2011 G20090487/EDATS: OEDO-2009-0517 - Notice of Issuance of Directors Decision Under 10 CFR 2.206 ML1128705332011-11-0808 November 2011 G20090487/EDATS: OEDO-2009-0517 - Letter to Sherwood Martinelli Entergy Decommissioning Funding ML1128705422011-11-0808 November 2011 G20090487/EDATS: OEDO-2009-0517 - FRN: General Notice, Final Director'S Decision Under 10 CFR 2.206 to Sherwood Martinelli NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 2024-03-20
[Table view] Category:Finding of No Significant Impact
MONTHYEARML13203A1232013-08-0909 August 2013 Letter, Environmental Assessment and Finding of No Significant Impact Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa. ML1026403952010-09-28028 September 2010 Letter, Environmental Assessment and Finding of No Significant Impact Re License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML0224102312002-08-28028 August 2002 Environmental Assessment, Definition of Total Effective Dose Equivalent 2013-08-09
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 August 9, 2013 Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 RIVER BEND STATION, UNIT 1 -ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J (TAC NO. ME9450)
Dear Sir or Madam:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12241A250).
Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident.
.. " The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely, Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
Environmental cc w/encl: Distribution via Listserv ENCLOSURE ENVIRONMENTAL ASSESSMENT FINDING OF NO SIGNIFICANT RIVER BEND STATION, UNIT DOCKET NO.
NUCLEAR REGULATORY
[Docket Nos. 50-458; Entergy Operations, River Bend Station, Unit Environmental Assessment and Finding of No Significant AGENCY: Nuclear Regulatory Commission.
ACTION: Environmental assessment and finding of no significant impact; issuance.
ADDRESSES:
Please refer to Docket ID NRC-20YY-XXXX when contacting the NRC about the availability of information regarding this document.
You may access information related to this document, which the NRC possesses and are publicly available, using any of the following methods: Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-20YY-XXXX.
Address questions about NRC dockets to Carol Gallagher; telephone:
301-287-3422; e-mail: CaroI.Gallagher@nrc.gov. NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC Library at http://www.nrc.govlreading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 800-397-4209,301-415-4737, or bye-mail to pdr.resource@nrc.gov.
The ADAMS accession number for each document referenced in this notice is provided the first time that a document is referenced.
The application for exemption dated August 23,2012, is available electronically under ADAMS Accession No. ML12241A250. NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR , Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. SUPPLEMENTARY INFORMATION:
I. Introduction The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an exemption from 10 CFR Part 50, Appendix J for Facility Operating License No. NPF-47, issued to Entergy Operations, Inc. (the licensee), for operation of the River Bend Station, Unit 1 (RBS), located in West Feliciana Parish, Louisiana.
Therefore, as required by 10 CFR 51.21, the NRC performed an environmental assessment.
Based on the results of the environmental assessment, the NRC is issuing a finding of no significant impact. II. Environmental Assessment Identification of the Proposed Action: The proposed action would exempt the licensee from certain provisions of 10 CFR 50, Appendix J, "Primary Reactor Containment Testing for Water-Cooled Power Reactors." This appendix requires that components which penetrate containment be periodically leak tested at the defined as the "calculated peak containment internal pressure related to the design basis accident specified either in the technical specification or associated bases." The NRC noted a conflict between Entergy's interpretation of Paand the literal reading of the definition of Pain the regulations.
-For the extended power uprate, Entergy had re-performed the containment pressure analysis and determined that the calculated peak pressure in containment occurs in a localized area of the wetwell within a few seconds after a postulated main steamline break. The NRC believes that as defined in the regulations the value of P a should have been revised. The new calculation demonstrates that the localized pressure in the wetwell quickly drops and equalizes throughout the containment to a value of 3.6 pounds per square inch gauge (psig). Entergy has stated it believes the new calculated long-term peak containment pressure of 3.6 psig is the correct value to be used for P a' However, to avoid a large number of procedural changes to reflect this new peak value, Entergy did not propose to change the current Technical Specification (TS) value of P a (7.6 psig). The exemption would allow RBS to continue to use the pre-extended power uprate value of 7.6 psig rather than use the newly calculated localized pressure spike value of 9.3 psig in the wetwell for P a. The NRC staff examined the licensee's rationale to support the exemption request and concluded that the use the value of 7.6 psig for P a would meet the underlying purpose of 10 CFR Part 50, Appendix J. Supporting the use of this alternate value is: 1) the time for the pressure spike to occur and fall to equilibrium is 6 seconds, which is not sufficient time to release source terms from the core, 2) the pressure spike is also localized to the wetwell area which makes up roughly 10 percent of containment, the number of containment penetrations in this area is limited. Therefore, the current P a value of 7.6 psig meets the intent of 10 CFR 50, Appendix J by bounding the peak bulk containment pressure (3.6 psig) and assuring that leakage through the primary containment does not exceed allowable leakage rate values,
- 4) the calculated peak bulk containment pressure is 3.6 psig so the TS value of 7.6 is conservative for the use of determining containment leakage, and 5) this request is consistent with the determination that the NRC staff has reached for other licensees under similar conditions based on the same considerations.
Therefore, the P a TS value of 7.6 psig meets the intent of 10 CFR 50, Appendix J by bounding the peak bulk containment pressure and assuring that leakage through the primary containment does not exceed allowable leakage rate values. The proposed exemption would allow RBS to continue to use an alternate definition of P a of 7.6 pSig. This use of the alternate definition for P a meets the intent of 10 CFR 50, Appendix J because it provides testing of the primary containment parameters at a bounding pressure that is calculated to be possible throughout containment over a sustained period following a design basis accident.
The Need for the Proposed Action: The proposed exemption is needed to allow RBS to continue to use an alternate definition for P a which results in the use of a lower pressure for Appendix J containment testing. Use of the lower pressure reduces the burden of modifying the test procedures, seeking NRC authorization to change the current TS value, and conducting the testing at the higher pressure.
In addition, applying the literal definition for P a would not serve the underlying purpose of the rule which is to test the primary containment parameters at a peak pressure calculated to exist over the long term following a design basis accident.
Environmental Impacts of the Proposed Action: The NRC has completed its evaluation of the proposed action and concludes that the exemption described above meets the intended purpose of the requirements in 10 CFR 50, Appendix J. The lower calculated P a value provides a representative bounding pressure for evaluating the leak-tight integrity of the primary reactor containment and related penetrations.
The proposed action will not significantly increase the probability or consequences of accidents.
No changes are being made in the types of effluents that may be released offsite. There is no significant increase in the amount of any effluent released offsite. There is no significant increase in occupational or public radiation exposure.
Therefore, there are no significant radiological environmental impacts associated with the proposed action. With regard to potential non-radiological impacts, the proposed action does not have any foreseeable impacts to land, air, or water resources, including impacts to biota. In addition, there are also no known socioeconomic or environmental justice impacts associated with such proposed action. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action. Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action. Environmental Impacts of the Alternatives to the Proposed Action: As an alternative to the proposed action, the staff denial of the proposed action (i.e., the "no-action" alternative).
Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
-6 Alternative Use of Resources:
The action does not involve the use of any different resources than those previously considered in the "Final Environmental Statement," NUREG-1073, January 1985, for the RBS. Agencies and Persons Notified:
In accordance with its stated policy, on August 6, 2013, the staff notified the Louisiana State official.
Ji Wiley. of the Louisiana Department of Environmental Quality, Radiation Protection Division.
regarding the environmental impact of the proposed action. The State official had no comments.
III. Finding of No Significant Impact On the basis of the environmental assessment.
the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment.
Accordingly.
the NRC has determined not to prepare an environmental impact statement for the proposed action. For further details with respect to the proposed action, see the licensee's letter dated August 23, 2012. Dated at Rockville, Maryland, this of August 2013. For the Nuclear Regulatory Commission.
Michael T. Markley. Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor August 9, 2013 Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 SUB..RIVER BEND STATION, UNIT 1 -ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J (TAC NO. ME9450)
Dear Sir or Madam:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to a request for exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, "Primary Reactor Containment leakage Testing for Water-Cooled Reactors," for the River Bend Station, Unit 1. This action is in response to related to Entergy Operations, Inc.'s application dated August 23, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12241A250).
Specifically, the application requested a change to the definition of "P a" defined as "the calculated peak containment internal pressure related to the design basis accident..." The exemption modifies P a to exclude a brief, localized pressure spike in the wetwell which would shift the calculated peak containment internal pressure above the long-term calculated peak pressure.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely, IRA! Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
Environmental cc w/encl: Distribution via DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 Resource Branch Reading File RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMRiverBend Resource RidsNrrDlrRerb Resource RidsRgn4MailCenter Resource ADAMS Accession Nos. Letter ML13203A123; EA ML13203A126 NRR/DLR/RERB/BC OFFICE NRRlDORULPL4/PM NRRlDORLlLPL4/LA JBurkhardt SKlementowicz for MWong 7/29/13 7/23/13 NRRlDORLlLPL4/PM NRRlDORLlLPL4/BC Flyon for AWang MMarkley 8/9/13 8/9/13 AWang OFFICIAL RECORD COPY