ML14316A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/01/2014
| issue date = 08/01/2014
| title = 2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
| title = 2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  

Revision as of 06:41, 21 June 2019

2014 DC Cook Nuclear Power Plant Initial License Examination Form ES-301-3
ML14316A306
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
References
Download: ML14316A306 (1)


Text

__ 0'"""'*

Test Quality Checklist Form ES-301*3 Operating Test Number

1. General Criteria *----------*----

The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., *10 CFR 55.45, operational importance.

safety function distribution).

b. There is no day-to-day repetition between this and other operating tests to be administered dunng this examination.

Initials The operating test shall not duplicate 1tems from the applicants' audit test(s). l.see / SectlonD.1.a.)

.\ c. 11--------------------------------*---------------t=.L.L+-lr-+_;__-ll

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated lic<mse level.

Criteria a. Each JPM includes U1e foilowmg, as applicable:

  • initial conditions
  • initiating cues
  • references and tools. including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be lime-critical by the facility licensee
  • operationally important specific performance criteria that include. o detailed expected actions with exact criteria and nomenclature o system response and other examiner cues ') statements describing important observations to be made by the applic:ant o criteria for successful completion of the task o identification of critical steps and their associated performance standards lf---------'-o-restrictions on the sequence of steps. if applicable
b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use. repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

The associated simulator Form ES-301-4 and Author Facility R(';vle'Ner(')

d. NRC Supervisor NOTE* 3. Simulator Criteria tests (scenario sets) have be*.m revieweci in accordance with is net applicable f*x NRC .. dev*;loped tests. revievver In Co!urnn chief conc:urrf;:;nce required Date dw..