Line 3: |
Line 3: |
| | issue date = 07/21/1978 | | | issue date = 07/21/1978 |
| | title = Referring to Inspection Conducted on 4/10-14/1978, Which Identified One Infraction as a Notice of Violation. Response to This Notice Is Recorded on Attachment a | | | title = Referring to Inspection Conducted on 4/10-14/1978, Which Identified One Infraction as a Notice of Violation. Response to This Notice Is Recorded on Attachment a |
| | author name = Van Brunt E E | | | author name = Van Brunt E |
| | author affiliation = Arizona Public Service Co | | | author affiliation = Arizona Public Service Co |
| | addressee name = Spencer G S | | | addressee name = Spencer G |
| | addressee affiliation = NRC/RGN-V | | | addressee affiliation = NRC/RGN-V |
| | docket = 05000528, 05000529, 05000530 | | | docket = 05000528, 05000529, 05000530 |
Revision as of 00:24, 17 June 2019
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML13169A2542013-06-13013 June 2013 Reply to Notice of Violation ML1106701692011-02-28028 February 2011 NRC Problem Identification and Resolution Inspection Report 05000528-10-008, 05000529-10-008, 05000530-10-008, and Notice of Violation, Dated January 28, 2011 ML1007701002010-03-11011 March 2010 NRC Integrated Inspection Report 05000528-09-005, 05000529-09-005, and 05000530-09-005, and Notice of Violation, Dated February 9, 2010 IR 05000528/20090062009-04-20020 April 2009 NRC Problem Identification and Resolution, and Confirmatory Action Letter (CAL-4-07-004) Follow-Up Inspection Reports 05000528/2009006, 05000529/2009006, 05000530/2009006 & Notice of Violation, Dated March 20, 2009 ML0912101112009-04-20020 April 2009 NRC Problem Identification and Resolution, and Confirmatory Action Letter (CAL-4-07-004) Follow-Up Inspection Reports 05000528/2009006, 05000529/2009006, 05000530/2009006 & Notice of Violation, Dated March 20, 2009 ML0703900402007-01-24024 January 2007 APS Response to NRC Inspection Report 05000528/2006012; 05000529/2006012; 05000530/2006012 ML0633205382006-11-16016 November 2006 Response to NRC Followup Supplemental Inspection Report; 05000528/2006010, 05000529/2006010; 05000530/2006010 ML0632503432006-11-14014 November 2006 APS Response to NRC Inspection Report 05000528-06-011, 05000529-06-011, & 05000530-06-011 ML0612804242006-04-28028 April 2006 EA-05-051 - Palo Verde, Revision to the Reply to Notice of Violation, and Statement as to Payment of Civil Penalty ML0613001822006-04-27027 April 2006 Revision to Reply to Notice of Violation; EA-04-221 ML0701703862006-01-0909 January 2006 APS Response to NRC Inspection Report 05000528-06-012; 05000529-06-012; 05000530-06-012 ML0517301092005-06-0707 June 2005 Reply to a Notice of Violation, EA-05-051, and Statement as to Payment of Civil Penalty ML0516602782005-06-0707 June 2005 Reply to Notice of Violation; EA-04-221 ML0506305532005-02-24024 February 2005 Response to 10CFR50.59 Findings in NRC Special IR 05000528-04-014; 05000529-04-014; 05000530-04-014 ML18192B5031978-07-21021 July 1978 Referring to Inspection Conducted on 4/10-14/1978, Which Identified One Infraction as a Notice of Violation. Response to This Notice Is Recorded on Attachment a 2013-06-13
[Table view] |
Text
4 Q-, r7 MZMRla lip IPXIM Ital lX C'OQEQ~M&P.O.BOX 2I666 PHOENIX'RIZONA 85036 July 21, 1978 ANPP-11407-JAR U.S.Nuclear Regulatory Commission Region V I.Walnut Creek Plaza-Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr.G.S.Spencer, Chief Reactor Construction and Engineering Support Branch
Subject:
NRC I&E Inspection of April 10-14, 1978Pile: 78-044-026 C I~
Dear Sir:
This letter refers to the inspection conducted by Messrs.Bob Pate and Jack Garvin on April 10-14, 1978 as documented in your letter of June 14, 1978 of activities authorized by the Nuclear Regulatory Commission (NRC)Construction Permit Nos.CPPR-141, 142 and 143.As a result of this inspection, a Notice of Violation was written'identifying one infraction.
Our response to this Notice is re-corded on Attachment A.Very trul yours E.E.Van Brunt, Jr.APS Vice President Construction Projects ANPP Project Director EEVBJr/JAR:skc Attachment cc: R.L.Robb W.M.Petro R.L.Hand B.S.Kaplan J.M.Allen A.C.Gehr W.H.Wilson J.E.Bashore C.Betzhold
ANPP-11407-JAR July 21, 1978 ATTACHMENT A Docket Nos.50-528, 50-529, 50-530 Construction Permit Nos.CPPR-141, 142 and 143 Notice of Violation Based on the results of an NRC Inspection on April 10-14, 1978, it appears that one of your activities was not in full compliance with the requirement of 10CFR50, Appendix B, Criterion VI, as im-plemented by the PSAR (Chapter 17).Contrary to these requirements, on April 10, 1978, the NRC inspector observed that the change to the Marathon drawing on Change Notice VRC No.666, dated March 15, 1978, was not distributed or used at the location where the work was being performed.
This is an infraction.'~Res oese The referenced Vendor Revision Change Notice (VRCN)was written against Marathon Steel's fabrication list (cut sheet).This re-vision had no effect on*the installation drawing 13-10407-Cll-F45-5 and, therefore, was not required at the location where the work was being performed.
Consequently, in this instance this may not be a violation of the quality assurance program require-ments.However, the drawing control.system used strict administrative controls and close Superintendents and Field Engineers.
In'these controls, the following steps have last NRC Inspection:
at Palo Verde depends on attention by the Craft order to strengthen been taken since the 1.Procedure Change Notice (PCN)//7 to Work Plans Procedures (30P/P)'.0, Field Control of Design Documents';
was issued'n'June 28, 1978 which states: "The crafts shall be provided with DCN's, FCN's, VRCN's and FCR's as required to perform their work as determined by the Area Engineer (AE)or his designee."
~l~ANPP-11407-JAR tuljr'1', 1978 Attachment A Page 2 2.Foremen and General Foremen have been verbally advised by the Area Field Engineers (AFE's)that it is their responsibility to request replace-ment of drawings and changes that are damaged or destroyed and to inform the AFE's of any known out-of-date revisions.
3.The Matrix which identifies the drawings that go to the respective crafts level is reviewed and revised on a monthly basis by the AE.New and revised drawings are distributed to the crafts as they are received or as determined by the AE.The craft stick files are audited against the Matrix on a monthly basis by the Area Clerk to insure that the drawings are in accordance with the Matrix requirements.
4.During the Area Engineers/Lead Discipline Field.Engineers meetings drawing'ontrol is discussed at a minimum of once a month, with emphasis placed on keeping drawing stick files current and to the latest Field Revision Log (FRL)..and Daily Noti'fi-cation List (DNL), in accordance with the Matrix requirements as established by the AE's.5.Design Document Control Center (DDCC)personnel perform audits at least monthly at Maintained'rawing Stations to the latest FRL and DNL in accordance with the particular area Matrix.Dis-crepancies which are found are corrected within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
r 4'.~0