|
|
Line 1: |
Line 1: |
| #REDIRECT [[IR 05000397/2019301]]
| | {{Adams |
| | | number = ML19050A485 |
| | | issue date = 02/19/2019 |
| | | title = NRC Initial Operator Licensing Examination Approval 05000397/2019301 |
| | | author name = Werner G E |
| | | author affiliation = NRC/RGN-IV/DRS/OB |
| | | addressee name = Sawatzke B J |
| | | addressee affiliation = Energy Northwest |
| | | docket = 05000397 |
| | | license number = NPF-021 |
| | | contact person = |
| | | case reference number = 50-397/19-01 |
| | | document report number = 50-397/OL-19 |
| | | document type = Letter, License-Operator License Exam, Draft |
| | | page count = 3 |
| | }} |
| | See also: [[followed by::IR 05000397/2019301]] |
| | |
| | =Text= |
| | {{#Wiki_filter:February 19, 2019 |
| | Mr. Brad Sawatzke , Chief Executive Officer |
| | Energy Northwest |
| | MD 1023 P.O. Box 968 |
| | Richland, WA |
| | 99352 SUBJECT: COLUMBIA GENERATING STATION |
| | - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL |
| | 05000 397/2019 301 Dear Mr. Sawatzke: The purpose of this letter is to confirm the final arrangements for the upcoming operator |
| | licensing examinations at |
| | Columbia Generating Station. The NRC has completed its review of the operator license applications submitted in connection |
| | with this examination and separately provided a list of approved applicants to |
| | Dave Crawford, Exam Writer. Note that any examination waivers and applicatio |
| | n denials have been addressed |
| | in separate correspondence. |
| | The NRC has approved the subject examinations and hereby authorizes you to administer the |
| | written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision |
| | 11 , on March 7 , 2019. The NRC staff will |
| | administer the operating tests during the week of February 25, 2 |
| | 0 19. This examination has undergone extensive review by NRC staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG |
| | -1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at |
| | 817-200-1159. |
| | B. Sawatzke 2 Please contact your chief examiner , Mahdi Hayes |
| | , at 817-200-1508, if you have any questions |
| | or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or |
| | complete written examination and/or operating test) specified for each applicant |
| | approved to take the examination |
| | . Sincerely, /RA/ Gregory E. Werner, Chief Operations Branch |
| | Division of Reactor Safety |
| | Docket No. 55-397 License No. NPF-21 cc: Electronic Distribution for |
| | Columbia Generating |
| | Station |
| | |
| | ML19050A485 |
| | x SUNSI Review: |
| | ADAMS: Non-Publicly Available |
| | x Non-Sensitive Keyword: By: MOH x Yes No x Publicly Available |
| | Sensitive |
| | OFFICE OB:OE OB:BC NAME MHayes GWerner SIGNATURE /RA/ /RA/ DATE 02/16/2019 |
| | 02/19/2019 |
| | }} |
|
---|
Category:Letter
MONTHYEARIR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information 2024-09-24
[Table view] Category:License-Operator License Exam
MONTHYEARML19050A4852019-02-19019 February 2019 NRC Initial Operator Licensing Examination Approval 05000397/2019301 2019-02-19
[Table view] Category:Draft
MONTHYEARML19050A4852019-02-19019 February 2019 NRC Initial Operator Licensing Examination Approval 05000397/2019301 2019-02-19
[Table view] |
See also: IR 05000397/2019301
Text
February 19, 2019
Mr. Brad Sawatzke , Chief Executive Officer
Energy Northwest
MD 1023 P.O. Box 968
Richland, WA
99352 SUBJECT: COLUMBIA GENERATING STATION
- NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL
05000 397/2019 301 Dear Mr. Sawatzke: The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at
Columbia Generating Station. The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to
Dave Crawford, Exam Writer. Note that any examination waivers and applicatio
n denials have been addressed
in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision
11 , on March 7 , 2019. The NRC staff will
administer the operating tests during the week of February 25, 2
0 19. This examination has undergone extensive review by NRC staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at
817-200-1159.
B. Sawatzke 2 Please contact your chief examiner , Mahdi Hayes
, at 817-200-1508, if you have any questions
or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or
complete written examination and/or operating test) specified for each applicant
approved to take the examination
. Sincerely, /RA/ Gregory E. Werner, Chief Operations Branch
Division of Reactor Safety
Docket No. 55-397 License No. NPF-21 cc: Electronic Distribution for
Columbia Generating
Station
ML19050A485
x SUNSI Review:
ADAMS: Non-Publicly Available
x Non-Sensitive Keyword: By: MOH x Yes No x Publicly Available
Sensitive
OFFICE OB:OE OB:BC NAME MHayes GWerner SIGNATURE /RA/ /RA/ DATE 02/16/2019
02/19/2019