ML102720677: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 25: Line 25:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.
Note that any examination waivers and application denials have been addressed in separate correspondence.
Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject operating examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement  
The NRC has approved the subject operating examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement
: 1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
: 1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.
Line 40: Line 40:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.
Note that any examination waivers and application denials have been addressed in separate correspondence.
Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject operating examinations in accordance with NUREG-1 021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement  
The NRC has approved the subject operating examinations in accordance with NUREG-1 021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement
: 1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
: 1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1 021 for content, operational, and discrimination validity.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1 021 for content, operational, and discrimination validity.

Revision as of 22:18, 30 April 2019

Initial Operator Licensing Examination Operating Test Approval (Limerick Generating Station, Units 1 and 2)
ML102720677
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/29/2010
From: Hansell S L
Operations Branch I
To: Pacilio J M
Exelon Generation Co, Exelon Nuclear
Shared Package
ML100560247 List:
References
U01767
Download: ML102720677 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I Mr. Michael J. Pacilio 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 29, 2010 Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville,IL 60555

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION OPERATING TEST APPROVAL (LIMERICK GENERATING STATION, UNITS 1 AND 2)

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.

Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject operating examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement

1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.

Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.

If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. John Caruso, at (610) 337-5389, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete operating test) specified for each applicant.

Note: The written examinations will be approved for administration by separate correspondence.

Docket Nos. 50-352,50-353 License Nos. NPF-39, NPF-85 cc: Distribution via ListServ Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety September 29, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville,IL 60555

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION OPERATING TEST APPROVAL (LIMERICK GENERATING STATION, UNITS 1 AND 2)

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Limerick Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Robert Dickinson, Director of Training.

Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject operating examinations in accordance with NUREG-1 021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement

1. The NRC staff will administer the operating tests during the weeks of October 4 and 11, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.

Based on this review, I have concluded that the examination meets the guidelines of NUREG-1 021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.

If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. John Caruso, at (610) 337-5389, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete operating test) specified for each applicant.

Note: The written examinations will. be approved for administration by separate correspondence.

Docket Nos. 50-352,50-353 License Nos. NPF-39, NPF-85 cc: Distribution via ListServ Sincerely, IRA! Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety SUNSI Review Complete:

SLH (Reviewer's Initials)

ADAMS PKG: ML 100560247 ADAMS ACCESSION NO. ML 102720677 DOCUMENT NAME:G:\DRS\Operations Branch\CARUSO\Exam 10-LGS Oct 10 (U01767)\Operating ExamOnlyApprovalLtr.doc After declaring this document "An Official Agency Record" it willI be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" -Copy with attachment/enclosure "N"-No COpy OFFICE I RIIDRSIOB I RIIDRSIOB I I NAME JGCarusol SLHanseli1 DATE 09/29/10 09/29/10 OFFICIAL RECORD COpy I J. Pollock 2 Distribution: (via E-mail) M. Dapas, Acting RA (R10RAMAIL RESOURCE)

D. Lew, Acting DRA (R10RAMAIL RESOURCE)

J. Clifford, DRP (R1DRPMAIL RESOURCE)

D. Collins, DRP (R1 DRPMAIL RESOURCE)

D. Roberts, DRS (R1DRSMaii Resource)

P. Wilson, DRS (R1DRSMail Resource)

L. Trocine, RI OEDO S. Hansell, DRS D. Silk, Chief Examiner, DRS M. Gray, DRP B. Bickett, DRP S. McCarver, DRP P. Cataldo, SRI M. Halter, RI D. Hochmuth, DRP D. Bearde, DRS RidsNrrPMlndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReportsResources@nrc.gov DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File