Line 2: |
Line 2: |
| | number = ML13128A005 | | | number = ML13128A005 |
| | issue date = 04/30/2013 | | | issue date = 04/30/2013 |
| | title = Palo Verde Nuclear Generating Station (PVNGS) - 2012 Annual Environmental Operating Report | | | title = (PVNGS) - 2012 Annual Environmental Operating Report |
| | author name = Weber T N | | | author name = Weber T N |
| | author affiliation = Arizona Public Service Co | | | author affiliation = Arizona Public Service Co |
|
---|
Category:Environmental Report
MONTHYEARML17115A4962017-04-21021 April 2017 Annual Radiological Environmental Operating Report 2016 ML14350A4662014-12-12012 December 2014 Flood Hazard Reevaluation Report ML13128A0052013-04-30030 April 2013 2012 Annual Environmental Operating Report ML0912402872009-04-24024 April 2009 Annual Radiological Environmental Operating Report 2008 ML0809404712008-03-25025 March 2008 Annual Environmental Operating Report ML0712702472007-04-26026 April 2007 Annual Environmental Operating Report 2006 ML0612300862005-12-31031 December 2005 Annual Radioactive Effluent Release Report ML0511002832005-04-0808 April 2005 Annual Radiological Environmental Operating Report 2004 ML0411900952004-04-21021 April 2004 Annual Radioactive Effluent Release Report 2003 ML0312504982003-04-25025 April 2003 2002 Annual Radioactive Effluent Release Report ML0212105322002-04-18018 April 2002 Annual Radiological Environmental Operating Report for 2001 ML18192A3301976-02-18018 February 1976 an Archaeological Survey of a Proposed 345 Kv Power Transmission Line Corridor from Deming, Nm to Greenlee County, Az ML18192A2151976-01-16016 January 1976 Pursuant to the Notice of Availability of the Draft Supplement to Final Environmental Statement Dated Nov. 25, 1975, 40 Copies of Applicant'S Comments to Such Draft Supplement Are Enclosed ML18192A1921975-10-10010 October 1975 Forwards Additional Information to Environmental Report, Supplement No. 6 Containing Revised Sections Which Have Been Revised to Include Southern California Edison Co. as a Participant in This Project ML18192B8301975-02-0303 February 1975 Environmental Report Construction Permit Stage, Volume IV for Palo Verde Nuclear Generating Station, Units 1, 2, & 3. ML18192A2891975-02-0303 February 1975 Environmental Report, Construction Permit Stage, Supplement No. 3 2017-04-21
[Table view] Category:Letter
MONTHYEARML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 IR 05000528/20230042024-02-12012 February 2024 Integrated Inspection Report Report 05000528/2023004 and 05000529/2023004 and 05000530/2023004 ML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 1R24 2024-09-23
[Table view] |
Text
I W, h,~,aps Palo Verde Nuclear Generating Station PO Box 52034 102-06692-TNW/RKR/KAR Phoenix, Arizona 85072-2034 April 30, 2013 Mail Station 7636 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2012 Annual Environmental Operating Report Enclosed please find the 2012 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.
No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Robert Roehler, Licensing Section Leader, at (623) 393-5241.Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/RKR/KAR/hsc Enclosure cc: A.T. Howell III NRC Region IV Regional Administrator J. K. Rankin NRC NRR Project Manager for PVNGS M. A. Brown NRC Senior Resident Inspector for PVNGS A. V. Godwin Arizona Radiation Regulatory Agency (ARRA)T. Morales Arizona Radiation Regulatory Agency (ARRA)A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callawav
.k ENCLOSURE Units 1, 2, and 3 2012 Annual Environmental Operating Report I. INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1030 feet above mean sea level at the northern boundary.
The station consists of three pressurized water reactor electrical generating units. Units 1, 2 and 3 have a rated thermal power of 3990 MW.PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2 and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively.
The Unit 1 full power operating license NPF-41 was issued June 1, 1985. The Unit 2 full power operating license NPF-51 was issued April 24, 1986. The Unit 3 full power operating license NPF-74 was issued November 25, 1987.These licenses were renewed on April 21, 2011.Appendix B to these operating licenses is entitled the "Environmental Protection Plan (Non Radiological)".
The Environmental Protection Plans (EPP) for each of the current operating licenses are identical.
The EPP purpose is to provide for protection of environmental values during construction and operation of the nuclear facility.
The principal objectives of the EPP are as follows: (1) Verify that the station is operated in an environmentally acceptable manner, as established by the FES (Final Environmental Statement) and other NRC environmental impact assessments.
(2) Coordinate NRC requirements and maintain consistency with other Federal, State and Local requirements for environmental protection.
(3) Keep NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities during calendar year 2010 related to the PVNGS EPP. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.1 II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed.
As of the date of this report, plans for this transmission line have been indefinitely suspended.
Therefore, there has been no activity with regard to this requirement of the EPP.B. Terrestrial Ecology Monitoring As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991, the salt deposition monitoring program was discontinued at the end of 1991.Ill. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design or operation or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP.Changes, tests, or experiments in which all measurable non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required to comply with other Federal, State, or local environmental regulations.
No design and operational changes were initiated in 2012 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2012.V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2012.2