Line 2: |
Line 2: |
| | number = ML14118A364 | | | number = ML14118A364 |
| | issue date = 04/24/2014 | | | issue date = 04/24/2014 |
| | title = Palo Verde Nuclear Generating Station (Pvngs), Units 1, 2, and 3 - Response to Request for Additional Information Regarding Recommendation 2.1 Flood Hazard Reevaluation Extension Request | | | title = (Pvngs), Units 1, 2, and 3 - Response to Request for Additional Information Regarding Recommendation 2.1 Flood Hazard Reevaluation Extension Request |
| | author name = Mims D C | | | author name = Mims D C |
| | author affiliation = APS | | | author affiliation = APS |
Revision as of 08:38, 11 April 2019
Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML14076A0742014-03-10010 March 2014 APS Extension Request for Flooding Hazard Reevaluation Submittal Project stage: Request ML14118A3642014-04-24024 April 2014 Response to Request for Additional Information Regarding Recommendation 2.1 Flood Hazard Reevaluation Extension Request Project stage: Response to RAI ML14156A4062014-05-30030 May 2014 Flooding Hazard Re-Evaluation Extension - Public Meeting Clarification Items Project stage: Request ML14136A0582014-06-0202 June 2014 5/14/2014 Summary of Meeting with Arizona Public Service Company to Discuss Flooding Hazard Reevaluation Extension Request for Palo Verde, Units 1, 2, and 3; Near-Term Task Force Recommendation 2.1 Project stage: Meeting ML14162A4652014-07-29029 July 2014 Relaxation of Response Due Dates Regarding Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation Report Project stage: Other 2014-05-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
10 CFR 50.54(f)DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory
& Oversight Palo Verde Nuclear Generating Station j ap s P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 102-06867-DCM/TNW/PJH April 24, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
References:
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 2. NRC Letter, Prioritization of Response Due Dates for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated May 11, 2012 3. NRC Letter, Supplemental Information Related to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 1, 2013 4. APS Letter, 102-06850, APS Extension Request for Flooding Hazard Reevaluation Submittal, dated March 10, 2014 5. NRC Email, Request for Additional Information (RAI) Regarding Recommendation
2.1 Flood
Hazard Reevaluation Extension Request, dated March 25, 2014
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 APS Response to Request for Additional Information Regarding Recommendation
2.1 Flood
Hazard Reevaluation Extension Request On March 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) issued Reference 1 to request information associated with Near-Term Task Force (NTTF)Recommendation 2.1 for flooding, including a reevaluation of licensees' flooding A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peak
- Diablo Canyon ° Palo Verde -Wolf Creek P ý:
102-06867-DCM/TNW/PJH ATTN: Document Control Desk U.S. Nuclear Regulatory Commission APS Response to Request for Additional Information Regarding Recommendation
2.1 Flood
Hazard Reevaluation Extension Request Page 2 hazards. The NRC subsequently identified in Reference 2 the submittal date to report the results of the Flooding Hazard Reevaluation (FHR) for the Palo Verde Nuclear Generating Station (PVNGS), a Category 2 plant, as March 12, 2014. Reference 3 provides guidance regarding requests for extensions of the hazard reevaluation submittal dates. Reference 4 provided the APS justification for the extension of the scheduled submittal date for the flooding hazard reevaluation report to December 12, 2014. Reference 5 is the NRC Request for Additional Information (RAI) regarding the APS extension request.Reason for the Delay The reasons for the delay are as follows:* APS requires additional time to complete review and validation of the flooding hazard reevaluation calculation results involving watershed effects by independent consultants.
- APS requires additional time to perform new Local Intense Precipitation (LIP)analysis and evaluations for the areas in close proximity to PVNGS power block buildings.
- APS requires additional time to perform evaluations of safe shutdown equipment functionality verification and margin analysis, if needed, as a result of potential LIP water intrusion.
These reviews are necessary to provide the complete flooding hazard reevaluation report.Proposed Schedule for the Submittal of a Complete Hazard Reevaluation Report The enclosed extension schedule provides a breakdown of the time required to complete the following additional activities:
- Complete calculation third party independent review* Validation, verification and final selection of technical approach for LIP analysis* Input validation and refinement for LIP / discussion with state and county agencies* Perform new LIP analysis* Safe shutdown equipment functionality verification and margin analysis, if needed* Preparation of final submittal Basis for the Acceptability of the Revised Schedule This extension request was justified in Reference
- 4. The enclosure to this letter contains the revised schedule of analyses and activities remaining for submittal of the FHR for PVNGS.
102-06867-DCM/TNW/PJH AT-N: Document Control Desk U.S. Nuclear Regulatory Commission APS Response to Request for Additional Information Regarding Recommendation
2.1 Flood
Hazard Reevaluation Extension Request Page 3 No commitments are being made to the NRC by this letter.Should you have any questions concerning the content of this letter, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.I declare under penalty of perjury that the foregoing is true and correct.Executed on (Date)Sincerely, ., DCM/TNW/PJH
Enclosure:
RAI for Flood Hazard Reevaluation Extension Request Schedule cc: E. J. Leeds M. L. Dapas J. K. Rankin A. E. George M. A. Brown R. Kuntz NRC Director, Office of Nuclear Reactor Regulation NRC Region IV Regional Administrator NRC NRR Project Manager NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS NRC NRR/JLD Project Manager ENCLOSURE RAI for Flood Hazard Reevaluation Extension Request Schedule Apr-i 7-2014 Q aps RAI for Flood Hazard Reevaluation Extension Request Schedule M1: 2014 Apil 2014 2014 -,,204 1 141 4 S 22014 2014 1 Au-y 201 03 10 1 17 1 24 31 1 07 1 14 1 21 28 0 1 12 19 21 02 0 16 23 30 07 14 21 21 04 11 I8 25 01 04 16 2 0 20 04 13 20 7 03 10 17 24 01 as 15 22 1 29 105 RAI for Flood Hazard Reevaluation Extension Request Schedule RAI for Flood Hazard Reevaluation Exdension Request Schedule -Start Milestone Validation, Verification and Final Selection Technical Approach for LIP Analysis Complete Calculation 3rd Party Independent Review Input Validation ard Retirement for LIP I Discussion with State and CountyAgencies LIP Analysis Safe Shut Down Equipment Functionality Veification and Margin Analysis Preparation for Final Submittal* Dec-12-2014" APS Commitment Date Remaining Level ofEffort RemarrnigWork Actual Level of Effort Actual Work Requastor Hamid Mortazavi M i Misione Critical Remairrig Work Page 1 of 1 Project Scheduler.
Ted Lykins