|
|
Line 2: |
Line 2: |
| | number = ML12313A343 | | | number = ML12313A343 |
| | issue date = 11/07/2012 | | | issue date = 11/07/2012 |
| | title = Palisades Nuclear Plant, Response to Follow-up Request for Additional Information- License Amendment Request - Replacement of Spent Fuel Pool Region I Storage Racks | | | title = Response to Follow-up Request for Additional Information- License Amendment Request - Replacement of Spent Fuel Pool Region I Storage Racks |
| | author name = Vitale A J | | | author name = Vitale A J |
| | author affiliation = Entergy Nuclear Operations, Inc | | | author affiliation = Entergy Nuclear Operations, Inc |
Revision as of 11:11, 4 April 2019
|
---|
Category:Letter
MONTHYEARML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24152A1992024-07-0101 July 2024 Richie Garcia, Water Filtration Supervisor-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No. 50-0255 ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma ML24152A1972024-07-0101 July 2024 Mayor Annie Brown, South Haven-Palisades-NOI to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization of Power Operation 2024-09-06
[Table view] |
Text
PNP 2012-096 November 7, 2012 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Anthony J Vitale Site Vice President
SUBJECT:
Response to Follow-up Request for Additional Information-license Amendment Request -Replacement of Spent Fuel Pool Region I Storage Racks Palisades Nuclear Plant Docket 50-255 license No. DPR-20
References:
- 1. ENO letter, PNP 2012-005, "license Amendment Replacement of Spent Fuel Pool Region I Storage Racks," dated February 28,2012 (ADAMS Accession Numbers ML 12061A288, ML 12061A289, and ML 12061A290)
- 2. ENO letter, PNP 2012-071, "Response to Request for Additional Information -license Amendment Request -Replacement of Spent Fuel Pool Region I Storage Racks," dated September 6,2012 (ADAMS Accession Number ML 122541048)
- 3. NRC electronic mail of October 18, 2012, "Palisades
-Draft RAI Concerning SFP Region I Storage Racks (TAC No. ME8074)" 4. NRC electronic mail of October 25, 2012, "Palisades Question RE: Spent Fuel Pool LAR"
Dear Sir or Madam:
In Reference 1, Entergy Nuclear Operations, Inc. (ENO) submitted a license amendment request to modify the Renewed Facility Operating license, Appendix A, Technical Specifications (TS), as they apply to the replacement of the spent fuel pool region I storage racks. In Reference 2, ENO responded to a previous request for PNP 2011-096 Page 2 additional information (RAI). In References 3 and 4, ENO received two follow-up electronic RAI. Attachment 1 provides the ENO responses to the two follow-up RAI (References 3 and 4). A copy of this response, without the proprietary information, has been provided to the designated representative of the State of Michigan.
This letter contains no new or revised commitments.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November 7,2012. Sincerely, Attachments:
- 1. Response to Follow-up Request for Additional Information Regarding License Amendment Request for Replacement of Spent Fuel Pool Region I Storage Racks cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC State of Michigan ATTACHMENT 1 RESPONSE TO FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR REPLACEMENT OF SPENT FUEL POOL REGION 1 STORAGE RACKS Two electronic follow-up requests for information (RAI) were received, from the Nuclear Regulatory Commission (NRC), by electronic mail on October 18, 2012, and October 25,2012. The Entergy Nuclear Operations, Inc. (ENO) responses to the two follow-up RAI are provided below. NRC Request (October 18, 2012) Mechanical
& Civil (EMCB) 1. Provide justification for not evaluating the inclined fuel assembly event in the spent fuel pool replacement rack analysis.
ENO Response 1. An inclined fuel assembly drop on the top of a replacement rack is not explicitly analyzed because, in terms of damage to the rack, it is bounded by a straight (vertical) fuel assembly drop on the top of a rack. As discussed in Section 7.2 of Holtec report HI-2115004, "Licensing Report for replacement of the Palisades Region I Spent Fuel Storage Racks," the depth of damage to the rack due to a shallow fuel assembly drop must not exceed the so-called "crush zone," which is defined as the region from the top of the rack to a depth that is 1.5 inches below the top of the neutron absorber (Metamic).
Based on the rack's geometry and physical construction, the maximum depth of damage occurs when a fuel assembly falls in a vertical orientation and impacts the top edge of a rack cell wall (see Figures 7.2.1 and 7.4.1 in report HI-2115004).
This is because all of the dropped fuel assembly's kinetic energy is focused on a single storage cell location.
In the event of an inclined fuel assembly drop, only a portion of the fuel assembly's kinetic energy is delivered to the initial impact point. Once the inclined fuel assembly comes in contact with the top of the rack, the fuel assembly will rotate downward to a horizontal position, at which point a secondary impact will occur across many storage cell locations.
The larger impact area results in less depth of damage to the rack. Thus, a straight (vertical) drop of a fuel assembly bounds an inclined fuel assembly drop from a damage standpoint.
Beyond the physical damage assessment, the effect of a dropped fuel assembly lying horizontally on top of a replacement rack has also been considered in terms of both the thermal-hydraulic and criticality performance of the rack. As discussed in Section 5.4.1.2 of report HI-2115004, the hydraulic resistance of every rack cell in each spent fuel storage rack includes the inertial resistance that Page 1 of 2 would result from a dropped fuel assembly lying across the top of the rack. In addition, Section 4.6.6.2 of report HI-2115004 addresses the effect of a dropped fuel assembly lying horizontally on top of a Region 1 rack from a reactivity standpoint.
In summary, an inclined fuel assembly drop is not quantitatively addressed in report HI-2115004 because it is bounded by the straight (vertical) fuel assembly drop in terms of depth of damage to the rack. The thermal-hydraulic and criticality analyses of the replacement racks also give proper consideration to the effect of a dropped fuel assembly lying horizontally on top of a rack. NRC Request (October 25, 2012) 2. What is the capacity of the spent fuel handling machine? ENO Response 2. Plant records indicate that the spent fuel pool handling machine hoist and grapple have a load capacity of 3200 pounds. The hoist and grapple raise and lower loads within the stationary mast on the spent fuel pool handling machine. Additionally, an auxiliary hoist, with a load capacity of 2000 pounds, is used for fuel handling in some spent fuel pool north tilt pit storage locations that are inaccessible to the mast. Page 2 of 2