Line 1: |
Line 1: |
| #REDIRECT [[DCL-13-021, Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz]] | | {{Adams |
| | | number = ML13078A292 |
| | | issue date = 03/05/2013 |
| | | title = Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz |
| | | author name = Elliott G F |
| | | author affiliation = AREVA NP, Inc |
| | | addressee name = |
| | | addressee affiliation = NRC/NRR |
| | | docket = 05000323 |
| | | license number = |
| | | contact person = |
| | | case reference number = DCL-13-021 |
| | | package number = ML130780374 |
| | | document type = Legal-Affidavit |
| | | page count = 4 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Enclosures 3 and 4 contain Proprietary Information |
| | -Withhold Under 10 CFR 2.390 Enclosure 5 PG&E Letter DCL-13-021 AREVA Affidavit for AREVA Calculation |
| | #32-9199805-000, "Diablo Canyon Power Plant Unit 2 PZR Safety and Spray Nozzles Planar Flaw Analysis" (Proprietary) |
| | And AREVA Calculation |
| | #32-9199937-000, "DCPP Unit 2 -Evaluation of Laminar Indications in Pressurizer Nozzles" (Proprietary) |
| | Enclosures 3 and 4 contain Proprietary Information When separated from Enclosures 3 and 4 , this document is decontrolled. |
| | AFFIDAVIT COMMONWEALTH OF VIRGINIA ) ) ss. CITY OF LYNCHBURG ) 1. My name is Gayle F. Elliott. I am Manager, Product Licensing, for AREVA NP Inc. (AREVA NP) and as such I am authorized to execute this Affidavit. |
| | : 2. I am familiar. |
| | with the criteria applied by AREVA NP to determine whether certain AREVA NP information is proprietary. |
| | I am familiar with the. policies established by AREVA NP to ensure the proper application of these criteria. |
| | : 3. I am familiar with the AREVA NP information contained in the Calculation Summary Sheets (CSS) 32-9199805-000, entitled "Diablo Canyon Power Plant Unit 2 PZR Safety and Spray Nozzles Planar Flaw Analysis" dated March 2013, and 32-9199937-000, entitled "DCPP-2 Unit 2 -Evaluation of Laminar Indications on Pressurizer Nozzles," dated March 2013 and referred to herein as "Documents." Information contained in these Documents has been classified by AREVA NP as proprietary in accordance with the policies established by AREVA NP for the control and protection of proprietary and confidential information. |
| | : 4. These Documents contain information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA NP and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in these Documents as proprietary and confidential. |
| | : 5. These Documents have been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in these Documents be withheld from public disclosure. |
| | The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial I information." 6. The following criteria are customarily applied by AREVA NP to determine whether information should be classified as proprietary: (a) The information reveals details of AREVA NP's research and development plans and programs or their results. (b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service. (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability. (e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause SUbstantial harm to the competitive position of AREVA NP. The information in these Documents is considered proprietary for the reasons set forth in paragraphs 6(c) and 6(d) above. 7. In accordance with AREVA NP's policies governing the protection and control of information, proprietary information contained in these Documents have been made available, on a limited basis, to others outside AREVA NP only as required and under suitable agreement providing for nondisclosure and limited use of the information. |
| | : 8. AREVA NP policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis. 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief. SUBSCRIBED before me this |
| | __ day of mJU1;\v ,2013. Sherry L. McFaden NOTARY PUBLIC, COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES: 10/31/14 . Reg. # 7079129 |
| | : l. MCFADEN Public commonwea,*th of Vlrgtnia 7079129 My Commission Expires Oct 31. 2Q14}} |
|
---|
Category:Legal-Affidavit
MONTHYEARML24162A0792024-06-0707 June 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Supplemental Declaration 6-7-2024 - DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-19-082, Submittal of Site-Specific Decommissioning Cost Estimate2019-12-0404 December 2019 Submittal of Site-Specific Decommissioning Cost Estimate DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology ML16061A4522016-02-11011 February 2016 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-020, Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement2016-02-11011 February 2016 Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement ML16026A3882016-01-0505 January 2016 Westinghouse Electric Company, LLC, Submittal of Proprietary Version of LTR-DCPPS-15-008 Response to NRC RAI 73 (Open Item 129). ML15090A2752015-03-26026 March 2015 Independent Spent Fuel Storage Installation - Consent and Hearing Waiver Form ML14171A2372014-06-11011 June 2014 Submittal of Supplemental Analysis for Inservice Inspection Program Relief Request SWOL-REP-1 U2 DCL-14-034, Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal2014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal ML14205A0352014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 22013-04-25025 April 2013 CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 ML13078A2922013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N2013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T2012-08-0202 August 2012 Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T ML12137A0242012-05-15015 May 2012 Diablo Canyon - May Hearing File Update ML11297A0562011-10-18018 October 2011 Diablo Canyon - October Hearing File Update ML0715501312007-05-23023 May 2007 SER Compliance with WCAP-16260-P-A the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement DCL-05-121, Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.'2005-12-23023 December 2005 Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.' DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria.2005-03-11011 March 2005 License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. DCL-04-149, License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack2004-11-0303 November 2004 License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack DCL-04-123, License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports2004-11-0101 November 2004 License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports DCL-04-104, Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant.2004-08-18018 August 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant. DCL-04-089, Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10.2004-07-30030 July 2004 Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. DCL-04-095, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors2004-07-27027 July 2004 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors DCL-04-066, Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.'2004-06-0404 June 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.' ML0412804352004-04-30030 April 2004 Notice of Change of Address ML0409704212004-03-31031 March 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February 1 Through February 29, 2004 ML0409805912004-03-18018 March 2004 Public Policy Advocates Llc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expense for February 1, 2004 Through February 29, 2004 ML0406204532004-02-23023 February 2004 Declaration of Sandip Sen in Support of Debtor'S Motion for Authority to Establish Cash-collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto (the Motion)' ML0403706042004-01-29029 January 2004 Declaration of Michael J. Donnelly in Support for Authority to Establish Cash-Collaterized Letter of Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0403706012004-01-29029 January 2004 Declaration of Raymond X. Welch in Support of Motion for Authority to Establish Cash-Collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0400700982003-12-30030 December 2003 Howard, Rice Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for November, 2003 ML0400200602003-12-22022 December 2003 Declaration of Grant Guerra in Support of Motion for Order Authorizing the Debtor to Settle Claim No. 13377 Filed by the Presidio Trust ML0333810452003-11-26026 November 2003 Cooley Godward Llp'S Twenty-Ninth Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period October 1, 2003 - October 31, 2003 ML0331800932003-11-0606 November 2003 Proof of Service ML0331701792003-10-31031 October 2003 Declaration of Michael J. Donnelly in Support of Pg&E'S Application for Authority to Incur Plan Implementation Expenses in Connection with Certain Financings DCL-03-133, Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038)2003-10-28028 October 2003 Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038) ML0331800902003-10-23023 October 2003 Declaration of Jennifer A. Becker in Support of City of Oakland and Port of Oakland'S Motion for Relief from Automatic Stay ML0331800862003-10-23023 October 2003 Relief from Stay Cover Sheet ML0328703662003-09-29029 September 2003 Skadden, Arps, Slate, Meagher & Flom Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period August 1, 2003 Through August 31, 2003 ML0327312982003-09-24024 September 2003 (Reorganized) California Power Exchange Corporation'S Limited Objection to Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alia and to Enter Into Agreements Resolving ML0327314402003-09-23023 September 2003 Fact Witness Disclosure of Satellite Senior Income Fund, Satellite Senior Income Fund II and Deutsche Bank Trust Company Americas to Objection to Confirmation of Plan of Reorganization Under Chapter 11 of the Bankruptcy Code for Pacific Gas ML0327313322003-09-22022 September 2003 Notice of Hearing on Interim Compensation Applications of Professionals and Final Expense Application of Creditors' Committee Members ML0326810702003-09-16016 September 2003 Declaration of Michael J. Donnelly in Support of Debtor'S Notice of Motion and Motion for Order Approving Debtor'S Execution and Performance Under the Amendment to First Amended and Restated Summary of Terms with Respect to Forbearance and ML0325412082003-09-11011 September 2003 Order Re Ex Parte Application of Pacific Gas and Electric Company Authorizing Settlement and Withdrawal of Claim of Laguna Irrigation District ML0325911092003-09-0505 September 2003 Declaration of Joshua Bar-Lev in Support of Debtor'S Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alla and to Enter Into Agreements Resolving the Claims ML0325411442003-09-0404 September 2003 Relief from Stay Cover Sheet - Motion & Notice of Motion of Smud for Relief from Automatic Stay in Litigation ML0325213432003-08-29029 August 2003 Declaration of Joseph Sauvage in Support of Motion for Authority to Enter Into Certain Hedging Transactions in Connection with Financing Under Proposed Plan of Reorganization, and to Incur Secured Debt Related Thereto 2024-06-07
[Table view] |
Text
Enclosures 3 and 4 contain Proprietary Information
-Withhold Under 10 CFR 2.390 Enclosure 5 PG&E Letter DCL-13-021 AREVA Affidavit for AREVA Calculation
- 32-9199805-000, "Diablo Canyon Power Plant Unit 2 PZR Safety and Spray Nozzles Planar Flaw Analysis" (Proprietary)
And AREVA Calculation
- 32-9199937-000, "DCPP Unit 2 -Evaluation of Laminar Indications in Pressurizer Nozzles" (Proprietary)
Enclosures 3 and 4 contain Proprietary Information When separated from Enclosures 3 and 4 , this document is decontrolled.
AFFIDAVIT COMMONWEALTH OF VIRGINIA ) ) ss. CITY OF LYNCHBURG ) 1. My name is Gayle F. Elliott. I am Manager, Product Licensing, for AREVA NP Inc. (AREVA NP) and as such I am authorized to execute this Affidavit.
- 2. I am familiar.
with the criteria applied by AREVA NP to determine whether certain AREVA NP information is proprietary.
I am familiar with the. policies established by AREVA NP to ensure the proper application of these criteria.
- 3. I am familiar with the AREVA NP information contained in the Calculation Summary Sheets (CSS) 32-9199805-000, entitled "Diablo Canyon Power Plant Unit 2 PZR Safety and Spray Nozzles Planar Flaw Analysis" dated March 2013, and 32-9199937-000, entitled "DCPP-2 Unit 2 -Evaluation of Laminar Indications on Pressurizer Nozzles," dated March 2013 and referred to herein as "Documents." Information contained in these Documents has been classified by AREVA NP as proprietary in accordance with the policies established by AREVA NP for the control and protection of proprietary and confidential information.
- 4. These Documents contain information of a proprietary and confidential nature and is of the type customarily held in confidence by AREVA NP and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in these Documents as proprietary and confidential.
- 5. These Documents have been made available to the U.S. Nuclear Regulatory Commission in confidence with the request that the information contained in these Documents be withheld from public disclosure.
The request for withholding of proprietary information is made in accordance with 10 CFR 2.390. The information for which withholding from disclosure is requested qualifies under 10 CFR 2.390(a)(4) "Trade secrets and commercial or financial I information." 6. The following criteria are customarily applied by AREVA NP to determine whether information should be classified as proprietary: (a) The information reveals details of AREVA NP's research and development plans and programs or their results. (b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service. (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA NP in product optimization or marketability. (e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause SUbstantial harm to the competitive position of AREVA NP. The information in these Documents is considered proprietary for the reasons set forth in paragraphs 6(c) and 6(d) above. 7. In accordance with AREVA NP's policies governing the protection and control of information, proprietary information contained in these Documents have been made available, on a limited basis, to others outside AREVA NP only as required and under suitable agreement providing for nondisclosure and limited use of the information.
- 8. AREVA NP policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis. 9. The foregoing statements are true and correct to the best of my knowledge, information, and belief. SUBSCRIBED before me this
__ day of mJU1;\v ,2013. Sherry L. McFaden NOTARY PUBLIC, COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES: 10/31/14 . Reg. # 7079129
- l. MCFADEN Public commonwea,*th of Vlrgtnia 7079129 My Commission Expires Oct 31. 2Q14