ML120230018: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:U01865 | |||
| stage = Other | |||
}} | }} | ||
Revision as of 12:37, 26 January 2019
Letter Sequence Other | |
---|---|
TAC:U01865, (Open) | |
Initiation
Administration Questions
| |
MONTHYEARML1202300212011-10-27027 October 2011
[Table View]Draft - Outlines (Folder 2) Project stage: Draft Other ML1202300222011-11-10010 November 2011 Draft Written (SRO Only)Exam (Folder 2) Project stage: Draft Other ML1202300202011-11-27027 November 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) Project stage: Draft Other ML1202300182011-12-20020 December 2011 Handouts to Applicants-Summary of References (Folder 3) Project stage: Other ML1202300142011-12-20020 December 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) Project stage: Other ML1202300092012-01-0606 January 2012 Final Qa/Related Forms (Folder 1) Project stage: Other 2011-11-27 |
ML120230018 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 12/20/2011 |
From: | Fish T H Operations Branch I |
To: | Entergy Nuclear Operations |
Jackson D E | |
Shared Package | |
ML112730061 | List: |
References | |
TAC U01865, 50-293/11-302 50-293/11-302 | |
Download: ML120230018 (1) | |
Similar Documents at Pilgrim | |
---|---|
Category:License-Operator
MONTHYEARML19135A6642019-05-15015 May 2019
[Table view]Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17234A6362017-08-22022 August 2017 Requalification Program Inspection - Pilgrim Nuclear Power Station ML18081A9342017-02-0808 February 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17046A1002017-02-0808 February 2017 NRC- Initial Operator Licensing Operating Test Approval - Pilgrim Nuclear Power Station ML17046A0912017-02-0808 February 2017 Initial Operator Licensing Written Examination Approval - Pilgrim Nuclear Power Station ML17118A3052017-02-0303 February 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML15212A6072015-07-30030 July 2015 Requalification Program Inspection ML15148A3382015-05-28028 May 2015 Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station ML15043A7112015-02-0505 February 2015 Addendum to Final Operator Exam (Folder 3) ML14094A1652014-04-0202 April 2014 Post Exam Comments, Resolution, and Technical References (Folder 1) ML14141A1882014-03-31031 March 2014 Final Qa/Related Forms (Folder 1) ML14094A1572014-03-25025 March 2014 Final Operating Exam (Sections a, B and C) (Folder 3) ML14094A1642014-03-25025 March 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14094A1612014-03-25025 March 2014 Draft Written Exam (Folder 2) ML14094A1602014-03-25025 March 2014 Draft - Outlines (Folder 2) ML14094A1592014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14094A1582014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14094A1562014-03-25025 March 2014 Written Exam Handouts to Applicants (Folder 3) ML14094A1552014-03-25025 March 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML14094A1532014-03-25025 March 2014 Final Outlines (Folder 3) ML14058A0062014-02-26026 February 2014 Initial Operator Licensing Written Test Approval Pilgrim Nuclear Power Station ML14049A4932014-02-18018 February 2014 Initial Operator Licensing Operating Test Approval ML1202300092012-01-0606 January 2012 Final Qa/Related Forms (Folder 1) ML1202300182011-12-20020 December 2011 Handouts to Applicants-Summary of References (Folder 3) ML1202300142011-12-20020 December 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1202300122011-12-20020 December 2011 Final Outlines (Folder 3) ML1135305992011-12-19019 December 2011 Operator Licensing Written Retake Examination Approval - Pilgrim Nuclear Power Station ML1202300202011-11-27027 November 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1202300222011-11-10010 November 2011 Draft Written (SRO Only)Exam (Folder 2) ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML1202300212011-10-27027 October 2011 Draft - Outlines (Folder 2) ML1118701782011-02-0101 February 2011 Final Qa/Related Forms (Folder 1) ML1118701762011-02-0101 February 2011 Post Exam Comments (Folder 1) ML1110104112011-01-24024 January 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1110104062011-01-24024 January 2011 Final Written Examination with Answer Key (401-5 Format) ML1110104092011-01-24024 January 2011 Handouts to Applicants (Folder 3) ML1110104022011-01-24024 January 2011 Final Outlines (Folder 3) ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204742011-01-0707 January 2011 Draft Written Exam (Draft 2) ML1106204792011-01-0707 January 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML1027800572010-10-0505 October 2010 Senior Reactor and Reactor Operator Initial Examinations - Pilgrim Nuclear Power Station ML1001200182010-01-0808 January 2010 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10 ML1001100212010-01-0808 January 2010 December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Pilgrim Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML0924702012009-09-0404 September 2009 Requalification Program Inspection (Pilgrim Nuclear Power Station) ML0913101102009-05-12012 May 2009 Final Qa/Related Forms (Folder 1) ML0911302182009-04-23023 April 2009 NRC Operator Licensing Initial Exam Results, Pilgrim Nuclear Power Station (Cover Letter Publicly Available; Enclosures Withheld from Public) ML0910006432009-03-31031 March 2009 Draft - Outlines (Folder 2) ML0912505492009-03-20020 March 2009 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) 2019-05-15 Category:Part 55 Examination Related Material MONTHYEARML19135A6642019-05-15015 May 2019
[Table view]Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17046A1002017-02-0808 February 2017 NRC- Initial Operator Licensing Operating Test Approval - Pilgrim Nuclear Power Station ML17046A0912017-02-0808 February 2017 Initial Operator Licensing Written Examination Approval - Pilgrim Nuclear Power Station ML18081A9342017-02-0808 February 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17118A3052017-02-0303 February 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML15212A6072015-07-30030 July 2015 Requalification Program Inspection ML15148A3382015-05-28028 May 2015 Response to Request for Qualification Review of a Proposed Senior Operator Applicant at Pilgrim Nuclear Power Station ML15043A7112015-02-0505 February 2015 Addendum to Final Operator Exam (Folder 3) ML14094A1652014-04-0202 April 2014 Post Exam Comments, Resolution, and Technical References (Folder 1) ML14141A1882014-03-31031 March 2014 Final Qa/Related Forms (Folder 1) ML14094A1562014-03-25025 March 2014 Written Exam Handouts to Applicants (Folder 3) ML14094A1642014-03-25025 March 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14094A1612014-03-25025 March 2014 Draft Written Exam (Folder 2) ML14094A1602014-03-25025 March 2014 Draft - Outlines (Folder 2) ML14094A1592014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14094A1582014-03-25025 March 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14094A1572014-03-25025 March 2014 Final Operating Exam (Sections a, B and C) (Folder 3) ML14094A1552014-03-25025 March 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML14094A1532014-03-25025 March 2014 Final Outlines (Folder 3) ML14058A0062014-02-26026 February 2014 Initial Operator Licensing Written Test Approval Pilgrim Nuclear Power Station ML14049A4932014-02-18018 February 2014 Initial Operator Licensing Operating Test Approval ML1202300092012-01-0606 January 2012 Final Qa/Related Forms (Folder 1) ML1202300182011-12-20020 December 2011 Handouts to Applicants-Summary of References (Folder 3) ML1202300142011-12-20020 December 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1202300122011-12-20020 December 2011 Final Outlines (Folder 3) ML1135305992011-12-19019 December 2011 Operator Licensing Written Retake Examination Approval - Pilgrim Nuclear Power Station ML1202300202011-11-27027 November 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1202300222011-11-10010 November 2011 Draft Written (SRO Only)Exam (Folder 2) ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML1202300212011-10-27027 October 2011 Draft - Outlines (Folder 2) ML1118701762011-02-0101 February 2011 Post Exam Comments (Folder 1) ML1118701782011-02-0101 February 2011 Final Qa/Related Forms (Folder 1) ML1110104092011-01-24024 January 2011 Handouts to Applicants (Folder 3) ML1110104112011-01-24024 January 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1110104022011-01-24024 January 2011 Final Outlines (Folder 3) ML1110104062011-01-24024 January 2011 Final Written Examination with Answer Key (401-5 Format) ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204792011-01-0707 January 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML1106204742011-01-0707 January 2011 Draft Written Exam (Draft 2) ML1027800572010-10-0505 October 2010 Senior Reactor and Reactor Operator Initial Examinations - Pilgrim Nuclear Power Station ML1001100212010-01-0808 January 2010 December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Pilgrim Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML1001200182010-01-0808 January 2010 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10 ML0924702012009-09-0404 September 2009 Requalification Program Inspection (Pilgrim Nuclear Power Station) ML0913101102009-05-12012 May 2009 Final Qa/Related Forms (Folder 1) ML0911302182009-04-23023 April 2009 NRC Operator Licensing Initial Exam Results, Pilgrim Nuclear Power Station (Cover Letter Publicly Available; Enclosures Withheld from Public) ML0910006432009-03-31031 March 2009 Draft - Outlines (Folder 2) ML0912505492009-03-20020 March 2009 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) ML0912505522009-03-0101 March 2009 Handouts to Applicants (Folder 3) 2019-05-15 |
Text
Summary of References
- 1. EP-IP-100.1 EMERGENCY ACTION LEVELS, Attachment 9.1 2. Single and Dual Loop Power to Flow Maps 3. Last page ONLY of Tech Spec TABLE 3.2.B and associated note page. 4. Tech Spec 3.5.C, NO bases 5. Tech Spec 3.5.B.1, NO bases 6. Tech Spec 3.5.B.2, NO bases 7. EOP-02 power and pressure legs 8. TS 3.3.B.1, NO bases 9. TS 3.3.0, NO bases 10. TS 3.3.H, NO bases 11. EP-IP 400, Attachment 1, Sheets 2 and 3 ONLY
Retrieved from "https://kanterella.com/w/index.php?title=ML120230018&oldid=1224413"