ML102220042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:DC Cook 2010 NRC Examination 4/29/2010 Revision 0 ES-301 Administrative Topics Outline Form ES-301-1
 
Facility:              DC Cook          Date of Examination:    6/21/10          Examination Level:  RO      SRO Operating Test Number:    2010 NRC Administrative Topic (see Note)
Type Code* Describe activity to be performed
 
Conduct of Operations D-R  NRC2010-A1a Calculate Reactor Vessel Void Vent Time K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
 
Conduct of Operations D-R  NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
 
Equipment Control D-R  NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Radiation Control N-S  NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0
 
Emergency Procedures/Plan
 
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)
 
DC Cook 2010 NRC Examination 4/29/2010 Revision 0 ES-301 Administrative Topics Outline Form ES-301-1
 
Facility:              DC Cook          Date of Examination:    6/21/10          Examination Level:  RO      SRO Operating Test Number:    2010 NRC Administrative Topic (see Note)
Type Code* Describe activity to be performed
 
Conduct of Operations D-R  NRC2010-A1a Calculate Reactor Vessel Void Vent Time K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})
 
Conduct of Operations D-R  NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)
 
Equipment Control D-R  NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Radiation Control N-S  NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0
 
Emergency Procedures/Plan D-R  NRC2010-A4-SRO Prepare Prompt NRC Notification Worksheet (SI, safety stuck open)  KA: 2.4.30 2.7/4.1  NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)}}

Revision as of 08:17, 19 September 2018

DC Cook, 2010 Initial License Exam, Admin JPM Outline
ML102220042
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/21/2010
From:
Division of Nuclear Materials Safety III
To:
References
Download: ML102220042 (2)


Text

DC Cook 2010 NRC Examination 4/29/2010 Revision 0 ES-301 Administrative Topics Outline Form ES-301-1

Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic (see Note)

Type Code* Describe activity to be performed

Conduct of Operations D-R NRC2010-A1a Calculate Reactor Vessel Void Vent Time K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})

Conduct of Operations D-R NRC2010-A1b-RO Determination of Reactor Shutdown K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)

Equipment Control D-R NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Radiation Control N-S NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0

Emergency Procedures/Plan

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)

DC Cook 2010 NRC Examination 4/29/2010 Revision 0 ES-301 Administrative Topics Outline Form ES-301-1

Facility: DC Cook Date of Examination: 6/21/10 Examination Level: RO SRO Operating Test Number: 2010 NRC Administrative Topic (see Note)

Type Code* Describe activity to be performed

Conduct of Operations D-R NRC2010-A1a Calculate Reactor Vessel Void Vent Time K/A 2.1.25 (3.9/4.2) (EPE 009 EA2.38 {3.9/4.3})

Conduct of Operations D-R NRC2010-A1b-SRO SRO Review - Determination of Reactor Shutdown Margin. K/A SYS 001 A4.11 3.5/4.1 (U2 C-18, Stuck Rod, No Xenon)

Equipment Control D-R NRC2010-A2 Perform Unit 2 LTOP Verification. K/A 2.2.37 3.6/4.6 Radiation Control N-S NRC2010-A3 Perform Monthly Rad Liquid And Gaseous Monitor Source Checks K/A 2.3.5 2.9/2.9 K/A 073 A4.03 4.3/4.0

Emergency Procedures/Plan D-R NRC2010-A4-SRO Prepare Prompt NRC Notification Worksheet (SI, safety stuck open) KA: 2.4.30 2.7/4.1 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)