W3F1-2015-0018, Request for Re-Inspection 95001 Inspection

From kanterella
Jump to navigation Jump to search
Request for Re-Inspection 95001 Inspection
ML15062A143
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/03/2015
From: Chisum M
Entergy Operations
To: Dapas M
Document Control Desk, NRC Region 4
References
W3F1-2015-0018
Download: ML15062A143 (2)


Text

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 mchisum@entergy.com Michael R. Chisum Site Vice President Waterford 3 W3F1-2015-0018 March 03, 2015 Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov

Subject:

Waterford 3 Request for Re-Inspection 95001 Inspection Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Reference:

1. NRC Letter, Waterford Steam Electric Station, Unit 3 - NRC Inspection Report 05000382/2013008; Preliminary White Finding, dated January 30, 2014. (ML14030A616)
2. NRC Letter, Final Significance Determination of White Finding and Notice of Violation; NRC Inspection Report 05000383/2014009, dated March 28, 2014. (ML14086A768)
3. NRC Letter, Follow-up Assessment Letter for Waterford Steam Electric Station, Unit 3, dated April 2, 2014. (ML14093A093)
4. NRC Letter, Waterford Steam Electric Station, Unit 3 - NRC Supplemental Inspection Report 05000382/2014011, dated December 30, 2014.

(ML1436A412)

Dear Mr. Dapas:

In References 1 and 2, the NRC identified a White Finding associated with the Emergency Diesel Generator Exhaust Fan Train B. In Reference 3, the NRC notified Waterford 3 of its intent to conduct a supplemental inspection in accordance with NRC Inspection Procedure 95001. On October 9, 2014, the NRC completed the supplemental inspection.

In Reference 4, the NRC notified Waterford 3 that the inspection objective of Inspection Procedure 95001 involving the extent of cause was not met. Waterford 3 has subsequently modified and revised the extent of cause review. This letter provides written notification that Waterford 3 is prepared for a re-inspection of this issue.

W3F1-2015-0018 Page 2 of 2 This report contains no new commitments. Please contact John Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information.

Sincerely, MRC/JRM cc: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Ryan Lantz, Branch Chief, Project Branch E U. S. NRC, Region IV Ryan.Lantz@nrc.gov NRC Project Manager for Waterford 3 Michael.Orenak@nrc.gov NRC Senior Resident Inspector for Waterford 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov