U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992

From kanterella
(Redirected from U-602372)
Jump to navigation Jump to search
Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992
ML20078L899
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/18/1994
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20078L887 List:
References
RTR-NUREG-1434 U-602372, NUDOCS 9412010198
Download: ML20078L899 (11)


Text

- - .

i Enclosure 2 to U-602372 sure 2 to U-60' toe

' Page 1 of 5 isectio o 5 of 476 C

fl ASecondary Containment} 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)

FREQUENCY SURVEILLANCE 3cor in ckd) Qu% &

SR 3.6.4.1.3

& Verif Ot\

secondary containment F 31 days

-- --- " -- is closed, except wher, the g/ dorig normal acce:s and exit cp[eaiag it beir.;

r-thEi. et lee 5L vike:6 fee deer :h entry he ein b3.6.4.1.4 Verify each standby gas treatment (SGT) 118hnthsoI _q j subsystem will draw down the Tsecondary a STAGGERED ,

TEST BASIS containment}#t o 290.25 Finch of vacuum water gaugeG : ON_hs cM9 du f e. 3 qMJ-1,]~ g4

(\dAhip%Rjf %wedMU) 4i k byt Verify each SGT subsystem can maintain 18[monthson SR 3.6.4.1.5 a '0.255] inch of vacuum water gauge in a STAGGERED ainment}Worihourat TEST BASIS hl C . 2 f> teg{ secondary a flow rate 4 006 cfm.

kW 4

__a N.

T  %

F 4 0RS 3.lo.?.I-I 3.6-46 Rev. C d 9/28/92-

-BWR/6-STS -

9412cic>i9s 94111a PDR ADOCK 05000461 P PDR

Enclosure 2 to U-602372 -

g, ,

_ y6 Page 2 of 5 3,, , 257 J

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.6 ---


N Es---------------

This Surveil nce shall not b -K g3p performe n MODE 1, 2, o .

2. C it may be take or unplanned events that-sati fy this SR.

pn is sero I 4 '2_ f 18 months Vi rify eachdreq]uwe4h supplies a f440 battery charper

3) e hoursp @ amps at 2[250 '"N2 "D3 V for ---

~

h f au cael M sooa N O 4 be+k tf charfen sWI 'U q

E 100 orsb5 o +)_ t 2- 5 J fts t.- % *T bovpf, SR 3.8.4.7 -------------------NOTES-------------------

1. SR 3.8.4.8 may be perfonned in lieu of SR 3.8.4.7 once per 60 months.
2. This Surveillance shall not be C4 performed in MODE 1, 2, or 3./haene,])

it may be taken for unplanned events that satisfy this SR.

g Verify battery capacity is adequate to 18 months P supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

(continued)

(

-BWR/6-Si9 3.8-28 Rev. 0,-09/28/42-t.

Enclosure 2lto U-602372. .

i c Page 3 of.5 I ure 2 to U4

]

sectio i

4 of 257)

Battery Cell 7araihefes a -

3.8.6  ;

3.8 ELECTRICAL POWER SYSTEMS 3.8.6 ' Battery Cell Parameters LCO 3.8.6 Battery cell parameters for the vision 1, 2, batteries shall be within the-Geiepr.,

  • 2r.d i limits of nd

@ i Table 3.8.6 1.

.Hrsy APPLICABILITY: When associated .0 Ol::Pical p0uer subsyste=5 2rz required to be OPERABLE.

ACTIONS l

...........................__....-.--NOTE------------------------------------- i Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME l

>S A. One or more battoies A.1- Verify pilot cell I hour with one or more electrolyte level and ,

battery cell float voltage meet 1 parai *ters not within Table 3.8.6-1 limits -

, Category C *aha -.

auft 32.b-1 z, g*

Ccdegor y A o~B Ano .

01 -

A.2 Verify battery cell 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> parameters meet 'Afjp_

Table 3.8.6-1 Category C vehes. O *'CC L.,- s.

fee AR

'7 days er ca//en A.3 Restore battery cell 31 days  ;

parameters to Category A and B limits of r Table 3.8.6-1.

(continued)

(,

  • BWR&--ST S- 3.8-32 Rev. O, 49/28/92 -

t  !

.)

u 9

y,- - - -,

Enclosure 2 to U-602372 Page 4 of 5

~

e

,i.' - .2283 d r les y nsene m .__,

, . (Dj(O dokhbr]h I

<askms aM manv4$ .

~

{.0 ADMINISTRATIVF CONTROLS j ,r2 4 to u .

Section 5 of50 i l

A+ttr Qechnical Specifications (TS) Bases Control Prograh

~

5.5.p @na reuiwQ g>

p 5.C'.i h Changes to the Bases of the dqim

1) ep i l m e u der appropriate eR

,g* '

~pec,1prgontrols ca n on s . - m an4-ra . ~ ;cned om d-;ng to ,

i.

r5sC.2- h Licensees may make changes to Bases without prior NRC approval provided the changes do not involve either of the following:

A change in the TS incor orate in the license; or usAR

2. J/. A change to the gpdated-F5fe r Bases that involves an unreviewed safety es o as defined in 10 CFR 50.59.

A 6.6.3 OC. The Bases Control Program shall contain provisions to ensure that the Bases ar maintained consistent" with th AR.

d;&er

% : N :or.Es Q U @ ,p M r ssee cih% 5

  • >a ss.n.5.llA . e. 2. l x

p-5.0.'

Proposed changes R approved that by themeet tne criteria of[to impiementatio )

be reviewed and NRC prior  %.

Changes to the Bases implemented without prior NRC approval shall )

be provided the NRC on a frequency consistent with-10 CFR 50.7 (c),

1 T

l I This progmm prov:aes a rneans & p<ocesce  !

chan (hCdges CM' dab to h Boses of %ese TecAnicol

@@ l 4WRio did 5.0-16 Rev.- 0, 09/20/'"'

Enclosure 2 to U-602372

. Page 5 of 5

-jPrunrfirrac Programsfand Manuals]

7  % , M 5 *U

'8' h meduri% grams [andManuals CS 5.7.Q.'6 c 14 Explosive Gas and Storage Tank Radioactivity Monitoring Program (continued) k y,,

methodo6gy iryIBranc Techn' al Pos Tion (BT ETSB -5,

.- "Postfiated 5dioac ve Re1 ase du to Wast Gas Sys em Leak

Fr' ure"]. The li uid ra .<aste antitie< shall b determi >d in OCzt i a cordan with tandar Revie Plan, P ction1.7.3,"/otulatedj (adioa ive Rel;_ase du to Tan Failur s"] .

The program shall include: g rrMn conde/nser gas tfeo&rrent Gee

a. The limits for concentrations of hydrogen .and -exygen-i,n thed .

-[Weste Ces ;ioldttp-System} and a surveillance program to' 1 g

ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the s m is designed to withstand a hydrogen explosion);

T. b survei lance program to ensure that the cantity f radioa ivity con ined in [ ch gas stor ge. tank nd fed s stem] is le than t amount e offgas reatment oc ' into Iu tha would res t in a who e body expo ure of n .5 rem s an individua in an unr tricted ar , in the event of 'an i' u controlle release of he tanks' ntents]; and i

A surveillance program to re that the. quantity of vadicac6W b'f. wed tivity contained i el4 outdooriiduid radwastc- tank [

tnatlarenotsurrou1Ledbylinerf, d y dike,orwallsfcapable

^ of holdirLg the tankW contents and - @othavLtank overflo(and surrounding area drains cohrdcted to the [m_ M (l"' ~3 I_gg .g{piquid Radwaste treatment ystemDsAlc ;; thcn9hc 2 cent-than-the~its t.at would rast'1+ i n-eeneentration: le :

0p23 -it cFa, 20. Appendh-s-Teb4c ::, column 2, at-the-neer+et-pet 41e water supply-and--t-he-neercst ;urfdcc nier supply in l

.an unrertri-ctedarca, in the event-cf an snccntre!!ed D w r +.- , , a. . _ u ., , l L fl0 cur;e6 ' - ~ ~ - '" -"- -- ~ " - - " - ~ ' -

l Olchtdy The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the l Explosive Gas and Storage Tank Radioactivity Monitoring Program i 97$m surveinance f requencies.

ome dBsbep of ey&dmd LNMe %d.;

(continued) 4WRN 5.0-28 Rev. 0, 09/20/9' P

L i Enclosure 3 to U-602372 l Page 1 of 6 PCIVs 3.6.1.3

, \

ACTIONS (continued)  !

l CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except penetration flow paths penetration flow path for main steam with one PCIV by use of at least line and excess inoperable, except due one closed and de- flow check to leakage not within activated automatic valves (EFCVs) i limit. valve, closed manual '

valve, blind flange, AND or check valve with flow through the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for valve secured. main steam line i i

AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for l EFCVs AND (continued)

)

l CLINTON 3.6-10 Amendment No. 95

-Enclosure 3 to U-602372 Page 2 of'6 Secondary Containment, ,

3.6.4.1  !

. SURVEILLANCE-REQUIREMENTS '(continued)

SURVEILLANCE . FREQUENCY-SR 3.6.4.1.3 Verify one door in each access to 31 days secondary containment is closed, except '

during normal entry and exit.

SR 3.6.4.1.4 Verify each standby gas treatment (SGT) 18 months on i subsystem will draw down the secondary a STAGGERED i containment to 2: 0.25 inch of varsum TEST BASIS i water gauge within the time required by Figure 3.6.4.1-1.

l 1

SR 3.6.4.1.5 Verify each SGT subsystem can maintain 18 months on a 2: 0.25 inch of' vacuum water gauge in the STAGGERED TEST secondary containment for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a BASIS flow rate s 4400 cfm.

l l

i 1

i l

'I i

CLINTON 3.6-45 Amendment No. 95

Enclosure 3 to U-602372

. Page 3 of 6 DC Sources-0perating 3.8.4

.SURV51LLANCEREQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is a 129 V 7 days on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

0_R Verify battery connection resistance is s 150 E-6 ohm for inter-cell connections, for inter-rack connections, for inter-tier connections, and for terminal connections.

SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration.

SR 3.8.4.4 Remove visible corrosion, and verify 18 months battery cell to cell and terminal connections are coated with anti-corrosion material.

I SR 3.8.4.5 Verify battery connection resistance is 18 months l s 150 E-6 ohm for inter-cell connections, for inter-rack connections, for inter-tier connections, and for terminal connections.

SR 3.8.4.6 Verify each Division 1 and 2 battery 18 months charger supplies a 300 amps at 2 125 V for a 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and each Division 3 and 4 battery charger supplies a 100 amps at 2 125 V for 2 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. l I

(continued)

CLINTON 3.8-25 Amendment No. 95

. Enclosure 3 to U-602372 Page 4 of 6 Battery Cell Partmeters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for the Division 1, 2, 3, and 4 batteries shall be within the limits of Table 3.8.6-1.

APPLICABILITY: When associated battery is required to be OPERABLE.

ACTIONS

__..........__....__________.--------NOTE-------------------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more batteries A.1 Verify pilot cell's 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one or more electrolyte level and battery cell float voltage meet parameters not within Table 3.8.6-1 Table 3.8.6-1 Category Category C limits.

A or B limits.

AND l

A.2 Verify battery cell 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l parameters meet  !

Table 3.8.6-1 AND Category C limits.

Once per 7 days thereafter AND A.3 Restore battery cell 31 days parameters to Category A and B limits of Table 3.8.6-1.

(continued)

CLINTON 3.8-30 Amendment No. 95

. Enclosure 3 to U-602372 Page 5 of 6 Programs and Manuds i 5.5

.5.5- Programs and Manuals 5.5.8 Explosive Gas and Storace-Tank Radioactivity Monitorina Proaram (continued)

b. A surveillance program to ensure that the quantity of radioactive material contained in each outdoor tank that is not surrounded by a liner, dike, or walls capable of holding the tank's contents and that does not have a tank overflow and surrounding area drains connected to the liquid radwaste treatment system is s 10 curies, excluding tritium and dissolved or entrained noble gases.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.

5.5.9 Diesel Fuel Oil Testina Proaram A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM Standards. The purpose of the program is to establish the following:

a. Acceptability of new fuel oil for use prior to addition to storage tanks by determining that the fuel oil has:
1. an API gravity or an absolute specific gravity within limits,
2. a kinematic viscosity within limits for ASTM 2D fuel oil, and
3. a water and sediment content within limits or a clear and bright appearance with proper color;
b. Other properties of the new fuel oil are within limits for ASTM 20 fuel oil within 31 days of addition to the storage tanks; and
c. Total particulate concentration of the fuel oil in the stcrage tanks is s 10 mg/l when tested every 31 days in accordance with ASTM D-2276-88.

(continued)

CLINTON 5.0-14 Amendment No. 95

~

s,

~ Enclosure 3 to U-602372 l' ' -

Page 6 of 6 p g i

-5.5 5.5 1b ograms and Manuals (continued) 5.5.11 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.

a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
b. Licensees may make changes to Bases without prior NRC approval provided the changes do not involve either of the following:
1. A change in the TS incorporated in the license; or
2. A change to the USAR or Bases that involves an unreviewed safety question as defined in 10 CFR 50.59.
c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the USAR.
d. Proposed changes that meet the criteria of either Specification 5.5.11.b.1 or Specification 5.5.11.b.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).

5.5.12 Ultimate Heat Sink (VHS) Erosion. Sediment Monitorina and Dredaina Program A program to provide maintenance on the VHS in the event inspections of the UHS dam, its abutments, or the VHS shoreline indicate erosion or local instability. This program shall ensure that the VHS is maintained in such a way as to achieve the following objectives:

a. During normal operation, there will be a volume of water in the VHS below elevation 675 sufficient to receive the sediment load from a once-in-25-year flood event; and i
b. Still be adequate to maintain the plant in a safe-shutdown condition for 30 days under meteorological conditions of the severity suggested by Regulatory Guide 1.27.

i .

1 1

i

, i i

CLINTON 5.0-16 Amendment No. 95 I,