IR 05000336/20230029 August 2023Integrated Inspection Report 05000336/2023002 and 05000423/2023002
IR 05000336/20230018 May 2023Integrated Inspection Report 05000336/2023001 and 05000423/2023001
IR 05000336/202200314 November 2022Integrated Inspection Report 05000336/2022003 and 05000423/2022003
IR 05000336/202100312 November 2021Integrated Inspection Report 05000336/2021003 and 05000423/2021003
ML21167A21130 June 2021Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088)
IR 05000336/20200041 February 2021Integrated Inspection Report 05000336/2020004 and 05000423/2020004
ML20312A00210 December 2020Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032)
ML20312A00110 December 2020Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval
IR 05000336/20200017 May 2020Integrated Inspection Report 05000336/2020001 and 05000423/2020001
ML20076J37216 March 2020Summary of NRC Verbal Authorization (E-mail Dated 3/16/2020) Alternative Request IR-4-03 for Use of Alternative Non-Code Methodology:
ML20076C83316 March 2020Response to Request for Additional Information (E-mail Dated 3/16/2020) Alternative Request IR-4-03 for Use of Alternative Non-Code Methodology
ML20075A03215 March 2020Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity
ML20076A54914 March 2020Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping
ML20048A00611 February 2020ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval
IR 05000336/20180045 February 2019Integrated Inspection Report 05000336/2018004 and 05000423/2018004
ML18128A0493 May 2018License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage
ML17135A29625 May 2017Alternative Relief Request RR-04-25 Boric Acid Pump P-19B Stuffing Box Cover
ML17122A3743 May 2017Alternative Relief Request RR-04-26 Boric Acid Pump P-19B Stuffing Box Cover
ML17123A04328 April 2017ASME Section XI Relief Request RR-04-26
ML17125A25228 April 2017ASME Section XI Relief Request RR-04-26
ML17090A11029 March 2017ASME Section XI Relief Request RR-04-25
ML17088A71929 March 2017E-mail from R.Guzman to W.Craft - Millstone Power Station, Unit 2 Verbal Authorization by the NRC Staff - Relief Request No. RR-04-25
ML16088A20822 March 2016Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval
IR 05000336/201500310 November 2015IR 05000336/2015003, 05000423/2015003; 07/01/2015 - 09/30/2015; Millstone Power Station (Millstone), Units 2 and 3; Surveillance Testing, Event Follow-up
ML14041A1796 February 2014Attachment 3 - Examination of Millstone Unit 3 Service Water Valves for Dealloying
IR 05000336/20130036 August 2013IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and Other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work Contro
IR 05000336/201200516 January 2013IR 05000336-12-005 and 05000423-12-005; Millstone Power Station - NRC Integrated Inspection Report (10-01-12 - 12-31-12)
IR 05000245/201200516 January 2013IR 05000336-12-005 and 05000423-12-005; Millstone Power Station - NRC Integrated Inspection Report (10-01-12 - 12-31-12)
ML13002A04920 December 2012Miillstone Power Station, Units 2 & 3, Response to Request for Additional Information Regarding Relief Request RR-04-09 and IR-3-15, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping
ML12297A33318 October 2012Relief Request RR-04-13 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange
ML12046A83631 January 2012Inservice Inspection Program - Owner'S Activity Report
ML1130001009 November 2011Issuance of Relief Request RR-04-12 Regarding the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange
ML11279A03629 September 2011Supplement to Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange
ML11234A07719 August 2011Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange
IR 05000336/20110033 August 2011IR 05000336-11-003 & 05000423-11-003, on 04/01/2011 - 06/30/2011, Millstone Power Station, Unit 2 and Unit 3, Operability Evaluations, Surveillance Testing, Event Follow-up
ML09271015122 September 2009Alternative Request RR-89-67 for the P40A RCP Seal Cooler Return Tubing
ML09021029620 January 200910 CFR 50.55a Relief Request RR-89-65 and 89-66; Temporary Non-Code Repair, Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger X-45A and Air Cooler Heat Exchanger X-83B
ML08172006910 July 2008Proposed Alternatives from Pressure Test Requirements for Buried Piping
ML06143001120 July 2006Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
ML0430903705 May 2005Audit of Dominion Nuclear Connecticut, Inc'S Management of Regulatory Commitments
ML0430200579 November 2004Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.
ML0210503752 April 2002Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
IR 05000336/199900619 July 1999Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20206D17627 April 1999Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval
ML20248E61326 May 1998Insp Repts 50-245/98-206,50-336/98-206 & 50-423/98-206 on 980101-0228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support
ML20217C05321 April 1998Forwards Three Drs Identified During Review Activities for Independent Corrrective Action Verification Program (Icavp), IAW Communications Protocol,PI-MP3-01.Addl Listed Drs,Which Have Been Reviewed & Accepted or Not Accepted,Encl
ML20203G61616 December 1997Forwards Seven Listed Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program,Iaw Communication Protocol,PI-MP3-01. Nineteen Drs Reviewed & Accepted by S&L,Encl
B16488, Provides Initial Response to Re IR One Through Three Per 10CFR50.54(f).Attachments 1 & 3 Are Significant Items for Restart.Encl Figure 1 Depicts Significant Item Identification Process,As Discussed at 970521 Briefing29 May 1997Provides Initial Response to Re IR One Through Three Per 10CFR50.54(f).Attachments 1 & 3 Are Significant Items for Restart.Encl Figure 1 Depicts Significant Item Identification Process,As Discussed at 970521 Briefing
ML20134B42523 January 1997Notice of Receipt of Petition for Director'S Decision Under 10CFR2.206.Petition Requesting Certain Actions Associated W/Haddam Neck Plant Operated by Nu
B15804, Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 323 July 1996Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 3