Issue date | Title | |
---|---|---|
IR 05000336/2023002 | 9 August 2023 | Integrated Inspection Report 05000336/2023002 and 05000423/2023002 |
IR 05000336/2023001 | 8 May 2023 | Integrated Inspection Report 05000336/2023001 and 05000423/2023001 |
IR 05000336/2022003 | 14 November 2022 | Integrated Inspection Report 05000336/2022003 and 05000423/2022003 |
IR 05000336/2021003 | 12 November 2021 | Integrated Inspection Report 05000336/2021003 and 05000423/2021003 |
ML21167A211 | 30 June 2021 | Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) |
IR 05000336/2020004 | 1 February 2021 | Integrated Inspection Report 05000336/2020004 and 05000423/2020004 |
ML20312A002 | 10 December 2020 | Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) |
ML20312A001 | 10 December 2020 | Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval |
IR 05000336/2020001 | 7 May 2020 | Integrated Inspection Report 05000336/2020001 and 05000423/2020001 |
ML20076J372 | 16 March 2020 | Summary of NRC Verbal Authorization (E-mail Dated 3/16/2020) Alternative Request IR-4-03 for Use of Alternative Non-Code Methodology: |
ML20076C833 | 16 March 2020 | Response to Request for Additional Information (E-mail Dated 3/16/2020) Alternative Request IR-4-03 for Use of Alternative Non-Code Methodology |
ML20075A032 | 15 March 2020 | Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity |
ML20076A549 | 14 March 2020 | Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping |
ML20048A006 | 11 February 2020 | ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval |
IR 05000336/2018004 | 5 February 2019 | Integrated Inspection Report 05000336/2018004 and 05000423/2018004 |
ML18128A049 | 3 May 2018 | License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage |
ML17135A296 | 25 May 2017 | Alternative Relief Request RR-04-25 Boric Acid Pump P-19B Stuffing Box Cover |
ML17122A374 | 3 May 2017 | Alternative Relief Request RR-04-26 Boric Acid Pump P-19B Stuffing Box Cover |
ML17123A043 | 28 April 2017 | ASME Section XI Relief Request RR-04-26 |
ML17125A252 | 28 April 2017 | ASME Section XI Relief Request RR-04-26 |
ML17090A110 | 29 March 2017 | ASME Section XI Relief Request RR-04-25 |
ML17088A719 | 29 March 2017 | E-mail from R.Guzman to W.Craft - Millstone Power Station, Unit 2 Verbal Authorization by the NRC Staff - Relief Request No. RR-04-25 |
ML16088A208 | 22 March 2016 | Response to Request for Additional Information Regarding ASME Section XI Inservice Inspection Program, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval |
IR 05000336/2015003 | 10 November 2015 | IR 05000336/2015003, 05000423/2015003; 07/01/2015 - 09/30/2015; Millstone Power Station (Millstone), Units 2 and 3; Surveillance Testing, Event Follow-up |
ML14041A179 | 6 February 2014 | Attachment 3 - Examination of Millstone Unit 3 Service Water Valves for Dealloying |
IR 05000336/2013003 | 6 August 2013 | IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and Other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work Contro |
IR 05000336/2012005 | 16 January 2013 | IR 05000336-12-005 and 05000423-12-005; Millstone Power Station - NRC Integrated Inspection Report (10-01-12 - 12-31-12) |
IR 05000245/2012005 | 16 January 2013 | IR 05000336-12-005 and 05000423-12-005; Millstone Power Station - NRC Integrated Inspection Report (10-01-12 - 12-31-12) |
ML13002A049 | 20 December 2012 | Miillstone Power Station, Units 2 & 3, Response to Request for Additional Information Regarding Relief Request RR-04-09 and IR-3-15, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping |
ML12297A333 | 18 October 2012 | Relief Request RR-04-13 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange |
ML12046A836 | 31 January 2012 | Inservice Inspection Program - Owner'S Activity Report |
ML113000100 | 9 November 2011 | Issuance of Relief Request RR-04-12 Regarding the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange |
ML11279A036 | 29 September 2011 | Supplement to Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange |
ML11234A077 | 19 August 2011 | Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange |
IR 05000336/2011003 | 3 August 2011 | IR 05000336-11-003 & 05000423-11-003, on 04/01/2011 - 06/30/2011, Millstone Power Station, Unit 2 and Unit 3, Operability Evaluations, Surveillance Testing, Event Follow-up |
ML092710151 | 22 September 2009 | Alternative Request RR-89-67 for the P40A RCP Seal Cooler Return Tubing |
ML090210296 | 20 January 2009 | 10 CFR 50.55a Relief Request RR-89-65 and 89-66; Temporary Non-Code Repair, Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger X-45A and Air Cooler Heat Exchanger X-83B |
ML081720069 | 10 July 2008 | Proposed Alternatives from Pressure Test Requirements for Buried Piping |
ML061430011 | 20 July 2006 | Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
ML043090370 | 5 May 2005 | Audit of Dominion Nuclear Connecticut, Inc'S Management of Regulatory Commitments |
ML043020057 | 9 November 2004 | Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. |
ML021050375 | 2 April 2002 | Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity |
IR 05000336/1999006 | 19 July 1999 | Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
ML20206D176 | 27 April 1999 | Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval |
ML20248E613 | 26 May 1998 | Insp Repts 50-245/98-206,50-336/98-206 & 50-423/98-206 on 980101-0228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support |
ML20217C053 | 21 April 1998 | Forwards Three Drs Identified During Review Activities for Independent Corrrective Action Verification Program (Icavp), IAW Communications Protocol,PI-MP3-01.Addl Listed Drs,Which Have Been Reviewed & Accepted or Not Accepted,Encl |
ML20203G616 | 16 December 1997 | Forwards Seven Listed Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program,Iaw Communication Protocol,PI-MP3-01. Nineteen Drs Reviewed & Accepted by S&L,Encl |
B16488, Provides Initial Response to Re IR One Through Three Per 10CFR50.54(f).Attachments 1 & 3 Are Significant Items for Restart.Encl Figure 1 Depicts Significant Item Identification Process,As Discussed at 970521 Briefing | 29 May 1997 | Provides Initial Response to Re IR One Through Three Per 10CFR50.54(f).Attachments 1 & 3 Are Significant Items for Restart.Encl Figure 1 Depicts Significant Item Identification Process,As Discussed at 970521 Briefing |
ML20134B425 | 23 January 1997 | Notice of Receipt of Petition for Director'S Decision Under 10CFR2.206.Petition Requesting Certain Actions Associated W/Haddam Neck Plant Operated by Nu |
B15804, Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 3 | 23 July 1996 | Responds to RAI Re Request to Use Alternative to ASME Boiler and Pressure Vessel Code,Section 3 |