IR 05000395/2023090 | 4 October 2023 | NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation |
ML19242E027 | 6 September 2019 | Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 |
ML19140A473 | 4 June 2019 | Relief Request (RR-4-23) to Utilize Code Case N-513-4 |
ML19101A293 | 10 April 2019 | Relief Request RR-4-22, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping. |
ML19086A091 | 26 March 2019 | Hs 2019003 RFI - SD |
ML19003A188 | 18 January 2019 | Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 |
ML18296A111 | 8 November 2018 | Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 |
RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange | 14 September 2018 | (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange |
RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. | 14 August 2018 | (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. |
RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... | 12 July 2018 | (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... |
RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | 11 July 2018 | (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping |
RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | 3 July 2018 | Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping |
ML20311A358 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
RC-17-0007, Relief Request RR-4-11, Temporary Non-Code Condition of Class 3 Service Water System Flange | 13 January 2017 | Relief Request RR-4-11, Temporary Non-Code Condition of Class 3 Service Water System Flange |
ML13219A914 | 7 August 2013 | Notification of Inspection and Request for Information |
RC-06-0222, Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors | 5 January 2007 | Response to Request for Additional Information Regarding NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors |
RC-05-0117, Virgil C. Sumner, Response to NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors (C-04-1719), | 29 July 2005 | Virgil C. Sumner, Response to NRC Bulletin 2004-01 Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Connections at Pressurized-Water Reactors (C-04-1719), |
RC-04-0022, 60-Day Follow-Up Letter to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | 23 January 2004 | 60-Day Follow-Up Letter to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity |
RC-02-0170, Operating License No. NPF-12, Basis Documentation for Application for Renewed Operating License, Virgil C. Summer Nuclear Station Mechanical Database AMR Query, Pages 1 to 237 | 1 October 2002 | Operating License No. NPF-12, Basis Documentation for Application for Renewed Operating License, Virgil C. Summer Nuclear Station Mechanical Database AMR Query, Pages 1 to 237 |
RC-02-0160, Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs | 12 September 2002 | Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs |
Information Notice 1994-79, Microbiologically Influenced Corrosion of Emergency Diesel Generator Service Water Piping | 23 November 1994 | Microbiologically Influenced Corrosion of Emergency Diesel Generator Service Water Piping |
Information Notice 1988-17, Summary of Responses to NRC Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants. | 22 April 1988 | Summary of Responses to NRC Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants. |
NRC Generic Letter 1986-01 | 3 January 1986 | NRC Generic Letter 1986-001: Safety Concerns Associated with Pipe Breaks in the BWR Scram System |