The following information was provided by the licensee via phone and email:
At 1600 CST on 12/29/2025, it was determined that a through-wall leak identified on a three-quarter inch vent valve off of the bonnet of the Unit 1 'B' reactor recirculation flow control valve qualifies as pressure boundary leakage resulting in a degraded reactor coolant system pressure boundary. Leakage repair will be completed prior to plant startup from the current outage. Therefore, this event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(ii)(A).
There was no impact on the health and safety of the public or plant personnel.? The NRC Resident Inspector has been notified. The State of Illinois will be notified.
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
This event is related to
EN 58100.