TAC:51955
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Initiation
Questions Answers | |
From | |
MONTHYEARML20117M1211985-04-22022 April 1985
[table view]Amends 1,080 Amp/H Ref in to 1,058 Amp/H of Required Battery Capacity to Satisfy Load Profile ML20128P6271985-05-23023 May 1985 Summary of 850516 Meeting W/Util Re Emergency Electrical Power Sys Concerns Resulting from Staff Evaluation of Problems from Testing Emergency Diesel Generators on 841218. Justification for Continued Operation Requested ML20133E7491985-05-28028 May 1985 Requests Interim Evaluation Re Acceptability of Automatic & Manual Control of Emergency Electrical Power Sys by 850607, Per 850516 Meeting W/Util.Summary of Meeting Encl.W/O Encl ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys ML20127N6551985-06-14014 June 1985 Responds to Concerns Raised During 850516 Meeting in Bethesda,Md Re Review of Emergency Electric Power Sys. Response Addresses Independence of Redundant Emergency Power Trains,Rapid Transfer Sys Testing & Switchgear Control Sys ML20133D0241985-07-0505 July 1985 Safety Evaluation Supporting Emergency Electrical Sys,Per Problems Encountered During 841218 Testing of Emergency Diesel Generator Sets ML20133C9821985-07-10010 July 1985 Forwards Safety Evaluation Re Facility Emergency Electrical Power Sys.Facility Can Safely Operate for Interim Period W/ Emergency Diesel Generator Single Failure Identified in Evaluation.Nrc Awaiting Addl Info Re FSAR Compliance ML20132D5561985-07-17017 July 1985 Notice of Deviation from Insp Completed on 850705. Deviation Noted:Automatic Closure of One Emergency Diesel Generator Breaker Dependent on Operation of Components Associated W/Other Emergency Diesel Generator ML20134E7521985-08-0909 August 1985 Responds to Re Notice of Deviation on Emergency Electrical Power Sys Independence,Per Undated FSAR Commitment.Evaluation of Postulated Single Failure Points Compromising Diesel Generator Independence Underway 1985-06-14 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:51955&oldid=3378955"