Requests Expeditious Review & Approval of Revision 3 to Ederer,Inc Generic Rept EDR-1, Nuclear Safety-Related Extra-Safety & Monitoring (X-SAM) Cranes to Assist in Completing Auxiliary Bldg Crane Upgrade in Timely Manner
ML20065S129
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/22/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR TAC-07727, TAC-08074, TAC-7727, TAC-7729, TAC-8074, NUDOCS 8211010084
Download: ML20065S129 (2)


Text

Wisconsin Electnc m come 231 W. MICHICAN, P.O. BOX 2046. MILWAUKEE, WI 53201 October 22, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. D. G. Eisenhut, Director Division of Licensing Gentlemen:

DOCKET NOS. 50-266 AND 50-301 NUREG-0612 CONTROL OF HEAVY LOADS UPGRADE OF AUXILIARY BUILDING CRANE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On January ll, 1982, Wisconsin Electric submitted its NUREG-0612, " Control of Heavy Loads", report for the Point Beach Nuclear Plant, Units 1 and 2. In that letter we committed to upgrade the auxiliary building crane to meet the guidelines of NUREG-0612, Section 5.1.6. Subsequently, in a letter dated September 16, 1982, we notified you, by means of a page revision to our nine-month report, that a manufacturer, Ederer Incorporated, had been selected for the auxiliary building crane upgrade.

One of the actions planned to implement the guidelines of NUREG-0612 will be the replacement of the existing trolley on the auxiliary building crane with a new trolley that has single-failure-proof main and auxiliary hoists designed and manufactured in accordance with NUREG-0554. Ederer Incorporated will be supplying this trolley in accordance with Ederer's Generic Licensing Topical Report EDR-1, " Nuclear Safety Related Extra-Safety and Monitoring (X-SAM) Cranes". Revision 2 of this topical report has been accepted by the NRC staf f as meeting the require-rents of NUREG-0554.

Since acceptance of Revision 2 of EDR-1 on January 2, 1980, Ederer X-SAM Crane design has been modified to include several additional advanced features not previously available.

-o33 8211010004 821022 PDR ADOCK 05000266 P PDR

/

Mr. H. R. Denton October 22, 1982 Ederer will be submitting in the near future a Revision 3 to EDR-1, which describes these advanced features, to the NRC staff for review and approval. Ederer and Wisconsin Electric are also presently preparing a Point Beach safety analysis report describing the specific modification proposed for the auxiliary building crane; however, this submittal is not anticipated until the end of the year.

In order to take full advantage of the latest design features of the Ederer X-SAM Crane, we are requesting that the NRC staff expedite its review and approval of EDR-1, Revision 3, when it is received so that we may reference this generic topical report in our evaluation. Your prompt review and approval of this revision will assist us in completing the crane upgrade within the scheduled discussed in our nine-month report.

Your consideration and timely action on this request will be appreciated.

Very truly yours, Y l Assistant Vice President C. W. Fay Copy to NRC Resident Inspector l

l l

l l