Pages that link to "TS-3.3.2.b"
Jump to navigation
Jump to search
The following pages link to TS-3.3.2.b:
Displayed 45 items.
- ML14070A492 (← links)
- ML12277A027 (← links)
- ML12277A025 (← links)
- ML052280274 (← links)
- ML052230428 (← links)
- ML20052E220 (← links)
- ML20212K579 (← links)
- ML20212K434 (← links)
- ML20247M313 (← links)
- ML20236H106 (← links)
- ML20214V625 (← links)
- ML20057C897 (← links)
- ML22083A203 (← links)
- ML22059B045 (← links)
- 05000440/LER-1989-018, :on 890529,reactor Vessel Low Water Level Trip Unit to Inboard,Balance of Plant Isolation Trip Sys Declared Inoperable.Caused by Personnel Error.Individual Retrained in Correct Interpretation of Tech Spec (← links)
- 05000352/LER-1986-016, :on 860325,Tech Spec Time Limit for Surveillance Test Violated When Trip Channel Inoperable for More than 2 H.Caused by Inadequate Communication.Improved Communication Discussed (← links)
- 05000352/LER-1988-001, :on 880106,discovered That RCIC Sys pipe-routing Area Temp Reading Deviating from Previous Shift Readings.Caused by Incorrect Reconnection of Thermocouple & Personnel Error.Technicians Counseled on Error (← links)
- 05000354/LER-1988-016, :on 880616,unanticipated Primary Containment & Control Room Emergency Filtration Initiation Occurred.Caused by Momentary Power Loss Due to Inverter Malfunction During Switching.High Voltage Power Supply Replaced (← links)
- 05000354/LER-1988-004-02, :on 880301,discovered That Required Surveillance of Refueling Floor Exhaust Process Radiation Monitoring Channel B Not Performed.Caused by Personnel Error.Senior Supervisor Counseled (← links)
- 05000458/LER-1993-001, :on 930113,determined That RWCU Isolation Setpoint Allowable Value Was Exceeded Due to Faulty Thermocouple Tester.All Three STPs Were Performed in Jan 1993 & Improper Settings Corrected (← links)
- 05000354/LER-1996-016, :on 960427,unplanned High Pressure Coolant Injection Sys Inoperability Due to Blown Fuse & Trip Unit Card Failure.Caused by Shorted Capacitor.Trip Unit Card & Fuse Were Replaced (← links)
- 05000352/LER-1984-013-03, :on 850117,HPCI Sys Steam Supply Pressure Instrument PT-55-1N058F Removed from Svc for Troubleshooting & Not Placed in Tripped Condition.Caused by Personnel Error. Requirements Clarified (← links)
- 05000354/LER-1991-020-01, :on 911207,personnel Received Indication of HPCI Isolation During Steam Line Warmup Following HPCI Outage.Caused by Improper Wiring of Temp Detector.Wiring Corrected & Delta-T Circuits Inspected (← links)
- 05000416/LER-1983-149-03, /03L-0:on 830927,Channel a Fuel Handling Area Radiation Monitor Operated Erratically Causing High Alarm. Caused by Failed Tube in Detector.Tube Assembly Replaced (← links)
- 05000324/LER-1993-012-02, :on 931204,discovered Temperature Switch Inoperable for PCIS MSL High Temperature Trip Due to Personnel Error.Operators Counseled & PT 2.1.22A/B Will Be Revised (← links)
- 05000361/LER-1982-011-01, /01T-0:on 820313,only Operable Control Room Airborne Radiation Monitor Removed from Svc,Violating Tech Spec 3.3.2.b for Approx 2-h.Caused by Personnel Error. Personnel Cautioned (← links)
- ML20046C937 (← links)
- 05000366/LER-1981-131-03, /03L-0:on 811218,during steady-state Operation, Refueling Floor Vent Exhaust Radiation monitor,2D11-K611C, Was Declared Inoperative.Caused by Condensation Inside Connector of Sensor 2D11-N012C.Connector Cleaned (← links)
- ML20035H605 (← links)
- IR 05000341/1989036 (← links)
- 05000311/LER-1981-096, Forwards LER 81-096/03L-0.Detailed Event Analysis Encl (← links)
- 05000287/LER-1981-015-01, /01T-0:on 810720,while Attempting to Perform Engineered Safeguard Periodic Test,Low Pressure Injection Pump 3-B Failed to Start.Caused by Personnel Error.Pump Motor Bearings Replaced & Personnel Counseled (← links)
- 05000287/LER-1981-015, Forwards LER 81-015/01T-0.Detailed Event Analysis Encl (← links)
- IR 05000373/1989026 (← links)
- 05000270/LER-1980-015, Forwards LER 80-015/03L-0 (← links)
- 05000270/LER-1980-006, Forwards LER 80-006/03L-0 (← links)
- RAIO-0419-65218, LLC Response to NRC Request for Additional Information No. 506 (Erai No. 9614) on the NuScale Design Certification Application (← links)
- 05000272/LER-1981-005, Forwards LER 81-005/03L-0 (← links)
- 05000255/LER-1989-010, :on 890602,operations Personnel Identified That HPSI Pump Would Not Start on Demand from Control Room.Caused by Loose Plunger Assembly Bolt on Associated Switchgear Breaker.Pump Returned to Operating Level (← links)
- IR 05000400/1996001 (← links)
- IR 05000397/1997005 (← links)
- IR 05000220/1987003 (← links)
- 05000270/LER-1980-006-03, /03L-0:on 800625,at 40% Full Power,Valve 2LP21 Failed to Open Electrically on Command.Caused by Loose Setscrew on Motor Driven Pinion.Screw Repaired (← links)
- ML23334A229 (← links)
- ML23334A214 (← links)