Pages that link to "LR-N21-0002, Technical Specification 6.9.1.5.b 2020 Annual Report of SRV Challenges"
Jump to navigation
Jump to search
The following pages link to LR-N21-0002, Technical Specification 6.9.1.5.b 2020 Annual Report of SRV Challenges:
Displayed 50 items.
- LR-N18-0011, Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR (← links)
- LR-N16-0168, 10 CFR 50 Appendix H Status Update for Hope Creek Generating Station (← links)
- LR-N15-0016, Pre-Application Meeting: Installation of Digital Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I&C-ISG-06 (← links)
- LR-N12-0148, Hope Creek Generating Station - Core Operating Limits Report, Reload 17, Cycle 18, Revision 7 (← links)
- LR-N12-0115, Hope Creek Generating Station - 2011 Annual Environmental Operating Report (← links)
- LR-N11-0366, Letter from Pseg Nuclear, Transmittal of Core Operating Limits Report, Reload 16, Cycle 17, Revision 5 (← links)
- LR-N11-0201, Form 536 - Operator Licensing Examination Data for Facility Docket Number 50-354 Hope Creek Generating Station (← links)
- LR-N10-0404, Hope Creek - Transmittal of Core Operating Limits Report, Reload 16, Cycle 17, Revision 4 (← links)
- LR-N10-0306, Hope Creek - Response to Request for Additional Information on License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (← links)
- LR-N10-0290, Hope Creek - Reload 16 Cycle 17 Supplemental Reload Licensing Report - License Amendment Request (H09-01) Supporting Use of Co-60 Isotope Test Assemblies (← links)
- LR-N10-0218, Special Report - Filtration, Recirculation and Ventilation System Radiation Monitoring System (← links)
- LR-N10-0239, Hope Creek - Cycle-Specific Stability Analysis - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) (← links)
- LR-N10-0163, Hope Creek Generating Station - Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) (← links)
- LR-N10-0032, Hope Creek Nuclear Generating Station, Request for Relief from ASME OM Code Test Intervals for Pressure Relief Valves (← links)
- LR-N09-0290, Hope Creek Generating Station - License Amendment Request Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) (← links)
- LR-N08-0224, Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1 (← links)
- LR-N08-0199, Hope Creek - Response to Request for Information for License Amendment Extended Power Uprate, License Condition 2.C.(22)2.b (← links)
- LR-N08-0123, Hope Creek - License Conditions 2.C.(21), 2.C.(22)2.g and 2.C.(22)3 (← links)
- LR-N08-0033, Hope Creek Generating Station Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate (← links)
- LR-N06-0031, Supplement to Request for License Amendment Re Ultimate Heat Sink, Hope Creek Generating Station (← links)
- LR-N06-0009, December 2005 Monthly Operating Report for Hope Creek Generating Station (← links)
- LR-N18-0086, Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or 8 (← links)
- LR-N15-0087, Supplement to the Request for Relaxation from Schedule Requirements of NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - Hope Creek Generating St (← links)
- LR-N10-0319, Supplement to Hope Creek License Renewal Application Related to the Selective Leaching Program (← links)
- LR-N09-0133, Response to Request for Additional Information Regarding Relief Request for Examinations and Tests of Snubbers (← links)
- LR-N09-0106, Withdrawal of Relief Request RR-HC-13R-04 - Proposed Alternate Repair Method (← links)
- LR-N18-0123, Submittal of Hope Creek Generating Station, Revision 23 to Updated Final Safety Analysis Report (← links)
- LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations (← links)
- LR-N16-0125, Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination (← links)
- LR-N14-0129, Response to RIS 2014-05, Preparation and Scheduling of Operator LLC Licensing Examinations (← links)
- LR-N14-0037, Inservice Inspection Activities - 90 Day Report Eighteenth Refueling Outrage (← links)
- LR-N13-0153, Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations (← links)
- LR-N12-0249, Retraction of Licensee Event Report 12-002-00 (← links)
- LR-N12-0114, Retraction of Licensee Event Report 2011-001 (← links)
- LR-N11-0001, Post-NRC Inspection Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (← links)
- LR-N16-0165, Transmittal of Response to Request for Additional Information Regarding Digital Power Range Neutron Monitoring (Prnm) System Upgrade (← links)
- LR-N14-0155, PSEG Nuclear LLC, Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA- (← links)
- LR-N14-0093, PSEG Nuclear Llc'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - Hope Creek Generating Station (← links)
- LR-N14-0034, PSEG Nuclear Llc'S Second Six-Month Status Report for the Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- LR-N14-0025, PSEG Nuclear Llc'S Second Six-Month Status Report for Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (← links)
- LR-N13-0174, PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Numb (← links)
- LR-N13-0173, PSEG Nuclear Llc'S First Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Extern (← links)
- LR-N13-0166, PSEG Nuclear Llc'S Response to Request for Additional Information for the Hope Creek'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Ins (← links)
- LR-N13-0033, PSEG Nuclear Llc'S Overall Integrated Plan for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- LR-N13-0031, PSEG Nuclear LLC - Overall Integrated Plan for Hope Creek in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12 (← links)
- LR-N10-0406, PSEG Nuclear, LLC Review of the Safety Evaluation Report with Open Items Associated with the Hope Creek Generating Station License Renewal Application (← links)
- LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application (← links)
- LR-N08-0162, Transmittal of Response to Regulatory Issue Summary 2008-16 (← links)
- LR-N08-0100, Transmittal of Supplement Reload Licensing Report, (← links)