Pages that link to "L-22-178, Spent Fuel Storage Cask Registration"
Jump to navigation
Jump to search
The following pages link to L-22-178, Spent Fuel Storage Cask Registration:
Displayed 50 items.
- ML18134A110 (← links)
- ML18213A037 (← links)
- ML18088A991 (← links)
- ML18261A136 (← links)
- ML18255A092 (← links)
- L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report (← links)
- L-18-145, Firstenergy Nuclear Operating Company Request for Approval of Certified Fuel Handler Training Program (← links)
- L-18-125, Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/0 (← links)
- L-18-109, Certification of Permanent Cessation of Power Operations for Beaver Valley Power Station. Unit Nos. 1 and 2. Davis-Besse Nuclear Power Station. Unit No. 1. and Perry Nuclear Power Plant. Unit No. 1 (← links)
- L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) (← links)
- L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules (← links)
- L-17-230, Submittal of Beaver Valley Power Station Emergency Preparedness Plan (← links)
- L-16-201, Firstenerqy Nuclear Operating Company'S (Fenoc'S) Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (← links)
- L-16-186, Bearer Valley, Units 1 and 2, Davis-Besse, Unit 1, and Perry, Unit 1 - Supplement to Submittal of Information Pertaining to Foreign Ownership, Control, or Influence (← links)
- L-15-101, Submittal of the Decommissioning Funding Status Reports for Beaver Valley, Units 1 and 2, Davis-Besse and Perry, Unit 1 (← links)
- L-14-416, Amended Storage Tank Registration for Beaver Valley Power Station, Facility Id. 04-13281 (← links)
- L-14-344, Firstenergy Nuclear Operating Co. - Indemnity Agreements (← links)
- L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-14-120, Firstenergy Nuclear Operating Company (FENOC) Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of In (← links)
- L-14-122, Annual Financial Test for a Parent Company Guarantee (← links)
- L-14-113, Extension Request Regarding the Flood Hazard Reevaluation Report Required by NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights. (← links)
- L-14-025, Firstenergy Nuclear Operating Company'S Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA (← links)
- L-14-024, Firstenergy Nuclear Operating Company'S (Fenoc'S) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-13-376, Addendum to the Beaver Valley Power Station, Unit No. 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report (← links)
- L-13-386, Notice Regarding Acquisition of Leased Interests by Firstenergy Nuclear Generation, LLC (← links)
- L-13-270, Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No (← links)
- L-13-243, Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No (← links)
- L-13-236, Cover Letter: Beaver Valley, Units 1 and 2 - Response to Order EA-13-112 (← links)
- L-13-074, Response to Request for Additional Information Regarding End-of-Life Moderator Temperature Coefficient Testing (TAC Nos. ME9144 and ME9145V) (← links)
- L-13-033, Submittal of the Decommissioning Funding Status Report for Beaver Valley Power Station, Units 1 & 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant (← links)
- L-13-035, Firstenergy Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- (← links)
- L-13-047, Supplement to Response to NRC Letter, Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-13-012, FENOC - Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-12-380, Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-12-379, Firstenergy Nuclear Co'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) (← links)
- L-12-341, Firstenergy Nuclear Operating Co'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- L-12-128, FENOC 60-Day Response to NRC Letter, Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1.2.3 and 9.3 of Near-Term Task Force Review Insights from Fukushima Dai-ichi Accident, Ma (← links)
- L-11-081, Submittal of Snubber Program for Beaver Valley Power Station Unit Nos. 1 and 2 (← links)
- L-10-067, Beaver, Units 1 & 2, Perry, Unit 1, Request for NRC Consent to Extinguish Parental Guaranty (← links)
- L-09-313, Beaver Valley,Submittal of Discharge Monitoring Report (← links)
- L-09-085, FENOC-Actions Required by Confirmatory Order EA-07-199, Completed (← links)
- L-09-078, 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans (← links)
- L-08-363, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-1 Examination Requirements (Request No. 2-TYP-3-RV-02) (← links)
- L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement (← links)
- L-08-222, LER 08-01-00 for Beaver Valley, Unit 2, Regarding Unplanned Actuation of the Auxiliary Feedwater System During Plant Startup (← links)
- L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (← links)
- L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (← links)
- L-08-102, Letter from Joseph J. Hagan to Cynthia Carpenter, Dated March 18, 2008, Subject: Actions Required by Confirmatory Order EA-07-199 (← links)
- L-07-528, Withdrawal of Beaver Valley Unit No. 2 License Amendment Request No. 07-007 Alloy 800 Steam Generator Tube Sleeving (← links)
- L-07-097, Letter to C. Carpenter, OE, from A. Alexander, Subject: Supplemental Information Regarding the Firstenergy Nuclear Operating Company (FENOC) Response to Demand for Information with Handwritten Notes (← links)