Pages that link to "CTID"
← CTID
The following pages link to CTID:
Displaying 42 items.
- ML18054A807 (← links)
- ML19263D720 (← links)
- ML19322A444 (← links)
- ML19344A319 (← links)
- ML20077L412 (← links)
- ML20092A261 (← links)
- ML20090M615 (← links)
- ML20141M190 (← links)
- ML20138C422 (← links)
- ML20195H967 (← links)
- ML20239A460 (← links)
- ML20248A448 (← links)
- ML20235D992 (← links)
- ML20245C339 (← links)
- ML20235D799 (← links)
- ML20211D636 (← links)
- 05000461/LER-1988-008, :on 880320,identified That MSIV Leakage Rates Exceeded Tech Specs Limits.Caused by Component Wear Based on Svc Seen During Power Ascension Program & Initial Plant Operation.Two MSIVs Reworked (← links)
- 05000382/LER-1992-007-01, :on 920717,liquid Radiation Monitor High Alarm Setpoint Set Incorrectly Due to Personnel Error.Liquid Radwaste Release Permits Calculated Manually Now Require Supervisory Oversight Before Release (← links)
- 05000374/LER-1984-080, :on 841121,vacuum Breaker 2PC001A Tripped & Containment Venting Occurred.Caused by Primary Containment Chiller Trip.Pressure Equalized & Breaker Closed (← links)
- 05000498/LER-1991-021, :on 911010,power from 1J Bus Lost When Electrician Misapplied Multimeter Test Leads in Energized Circuit,Resulting in Reactor Trip.Caused by Personnel Error. Pump Reenergized & Training Session Held (← links)
- 05000382/LER-1991-013-02, :on 910624,manual Reactor Trip Occurred in Response to High Steam Generator Water Level.Caused by Failed Startup Feedwater Regulating Valve.Pac Card Replaced (← links)
- 05000499/LER-1991-006-01, :on 910516 & 21,control Room Ventilation Sys Actuated to Recirculation Mode Due to Supurious Trip from Toxic Gas Analyzer.Possibly Caused by Poor Electrical Connection on Circuit Chips.Chips Reseated (← links)
- 05000309/LER-1993-016, :on 930804,multiple 480 Volt Breaker Trips Occurred Due to RMS-9 Device Not Being Actuated.Installed RMS-9 Devices in All AK-25 Breakers (← links)
- IR 05000295/1992030 (← links)
- 05000277/LER-1989-033, :on 891220,full Scram Signal Received When Technician Performed Surveillance on APRM D.Caused by Procedural Deficiencies & Inattention to Detail by Technician.Technician Counseled (← links)
- 05000255/LER-2080-022, License Event Report 1980-022-00 Re Inoperable Nuclear Instrumentation (← links)
- 05000272/LER-1990-007-01, :on 900321,found Tech Spec Surveillance for Containment Spray Not Performed Historically.Root Cause of Event Attributed to Past Inadequate Administrative Controls. Administrative Procedure Revised (← links)
- 05000311/LER-1987-017-02, :on 871208,vital 28 & 125 Volt Batteries Declared Inoperable Since Measured Gravities Did Not Meet Tech Spec Surveillances.Caused by Procedural Inadequacy. Procedure Revised & Batteries Charged (← links)
- 05000311/LER-1987-009-01, :on 870619,svc Water Sys Cabling Deficiency Discoverd.On 870625,nonseismically Qualified Marinite Walls Discovered.Caused by Inadequate Design Review & Documentation.Walls Reinforced (← links)
- 05000255/LER-1989-022, :on 890723,determined That No Licensing Basis Existed Which Defined Radiological Consequences of Safety Injection Refueling Water Tank Rupture.Caused by Oversight by All Participants During Initial Licensing (← links)
- 05000255/LER-1989-012, :on 890607,failed yoke-nut Threads Results in Inoperable Containment Isolation Valve.Caused by Excessive Disc/Stem Loading.Isolation Valve Repaired & Repacked W/Graphite Packing During Upcoming Outage (← links)
- 05000255/LER-1989-005, :on 890303,diesel Generator Operation Failed to Meet & Maintain Required Fuel Oil Capacity.Caused by Failure to Update Diesel Fuel Oil Consumption Calculations.Storage Tank Filled to Meet Required Min (← links)
- 05000255/LER-1988-012, :on 880808 & 1205,unusual Event Declared Due to Plant Chemistry Notifying Shift Supervisor of Secondary Leak Rate at 0.31 Gpm.Caused by Damaged Tube Due to Either Plate Stress,Plate Growth or Tube Denting (← links)
- 05000255/LER-1988-025, :on 881226,reactor Regulating Rod Group 3 Not Fully Withdrawn While Rod Group 4 Withdrawal Continued. Caused by Personnel Error.Event Reviewed w/on-shift Personnel by Operations Superintendent (← links)
- 05000255/LER-1988-002-01, :on 880209,inservice Waste Gas Decay Tank Lost Approx 26 Psi.Caused by Failure to Hold Gaseous Radwaste for Min of 15 Days Per Tech Specs.Pressure Drop Isolated & Air Samples Taken by Health Physics Personnel (← links)
- 05000255/LER-1987-039, :on 871030,discovered That Charging Pump P-55B Would Not Automatically Actuate.Caused by Failure to Fully Comply W/Charging Needs Due to Misidentification.Pump P-55B Declared Administratively Inoperable (← links)
- 05000255/LER-1988-020, :on 881027,as-found Lift Pressure of Pressurizer Safety Valve RV-1039 Exceeded Tech Spec Limits. Cause Unknown & Under investigation.RV-1039 Disassembled, Inspected & Adjusted & Valve Disc Replaced (← links)
- 05000255/LER-1988-006, :on 880327,auxiliary Feedwater Pump Inadvertently Started When Auxiliary Feedwater Actuation Sys Manually Actuated.Caused by Insufficient Guidance Available in Alarm/Response Procedures.Training Provided (← links)
- 05000255/LER-1988-004, :on 880303,required Dissolved Oxygen Analysis Not Completed.Caused by Personnel Error.Data Sheets Revised to Clearly Identify Analyses Required by Tech Specs & Required Time to Be Completed (← links)
- 05000255/LER-1987-032, :on 870910,LPSI Pump P-67B Inadvertently Actuated During Preventive Maint to Contacts of DBA Sequencer.Caused by Personnel Slipping Screwdriver Off Head of Cam Screw.Cam & Sequencer Will Be Replaced (← links)
- 05000255/LER-1987-033, :on 870903,high-range Noble Gas Stack Monitor Declared Inoperable When Detector Output Values Fell Below Tech Spec Requirements.Caused by Failure of Anode Insulator. Detector Will Be Refurbished by 871115 (← links)
- 05000255/LER-1987-015, :on 840804,turbine Trip Occurred,Resulting in Automatic Reactor Trip Due to Loss of Load.Caused by Loss of Electrohydraulic Control Fluid Pressure.Breaker Contacts for Feedwater Breakers Cleaned & Adjusted (← links)