Pages that link to "AEP-NRC-2021-25, Decommissioning Funding Status Report"
Jump to navigation
Jump to search
The following pages link to AEP-NRC-2021-25, Decommissioning Funding Status Report:
Displayed 50 items.
- ML12363A151 (← links)
- ML112351273 (← links)
- ML112351268 (← links)
- ML093070413 (← links)
- ML091030193 (← links)
- ML071000279 (← links)
- AEP-NRC-2018-16, Changes Made to the Donald C. Cook Nuclear Plant Security Plan, Revision 15 (Cover Letter Only) (← links)
- AEP-NRC-2017-52, Enclosure 3: Donald C. Cook Nuclear Plant Unit 2, Application for Withholding Proprietary Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program from Public Disclosure (← links)
- AEP-NRC-2016-93, DC Cook Nuclear Plant, Units 1 & 2, Supplement to License Amendment Request to Revise the Cyber Security Plan Implementation Schedule (← links)
- AEP-NRC-2014-85, Donal C. Cook, Unit 1, Core Operating Limits Report, Cycle 26, Revision 0 (← links)
- AEP-NRC-2011-60, Ltr 11/15/11 D.C. Cook Confirmation of Operator License Exam (← links)
- AEP-NRC-2018-51, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-4-08 (← links)
- AEP-NRC-2018-47, Submittal of Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2018-19, Submittal of 2017 Steam Generator Tube Inspection Report (← links)
- AEP-NRC-2018-41, Core Operating Limits Report (← links)
- AEP-NRC-2018-21, 30-Day Report of Changes to or Errors in an Evaluation Model (← links)
- AEP-NRC-2018-14, Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2017-58, Core Operating Limits Report (← links)
- AEP-NRC-2017-45, Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation (← links)
- AEP-NRC-2017-13, Transmittal of 2016 Steam Generator Tube Inspection Report (← links)
- AEP-NRC-2017-22, Submittal of Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2016-94, Core Operating Limits Report (← links)
- AEP-NRC-2016-88, Withdrawal of Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source- Operating (← links)
- AEP-NRC-2016-83, Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating (← links)
- AEP-NRC-2016-63, Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2016-41, Cycle 27 Core Operating Limits Report, Revision 0 (← links)
- AEP-NRC-2016-14, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation (← links)
- AEP-NRC-2016-09, Correction of Technical Specification Typographical Error (← links)
- AEP-NRC-2015-85, License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation (← links)
- AEP-NRC-2015-86, Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions. (← links)
- AEP-NRC-2015-87, Proposed Alternative to the American Society of Mechanical Engineers Code, Section Xl Repair Requirements (← links)
- AEP-NRC-2015-65, Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2015-63, Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection (← links)
- AEP-NRC-2015-66, Response to Request for Additional Information Regarding Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation (← links)
- AEP-NRC-2015-50, Response to a Request for Additional Information Regarding the Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator (← links)
- AEP-NRC-2015-53, Withdrawal of Emergency License Amendment to Extend the Allowed Outage Time for an Emergency Diesel (← links)
- AEP-NRC-2015-38, Submittal of Cycle 22 Core Operating Limits Report, Revision 0 (← links)
- AEP-NRC-2015-13, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- AEP-NRC-2015-05, Correction of Technical Specification Typographical Error (← links)
- AEP-NRC-2015-06, Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- AEP-NRC-2014-92, Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation (← links)
- AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model (← links)
- AEP-NRC-2014-13, Form OAR-1 Owner'S Activity Report (← links)
- AEP-NRC-2013-90, 2013 Steam Generator Tube Inspection Report (← links)
- AEP-NRC-2013-85, Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System (← links)
- AEP-NRC-2013-86, Supplement to the Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System (← links)
- AEP-NRC-2013-84, Emergency License Amendment Request Regarding Containment Distributed Ignition System (← links)
- AEP-NRC-2013-54, Submittal of Form OAR-1, Owner'S Activity Report (← links)
- AEP-NRC-2013-58, Withdrawal of Licensee Event Report (LER) 12-002-00 (← links)