Pages that link to "76P-1"
← 76P-1
The following pages link to 76P-1:
Displaying 47 items.
- IR 05000333/2014010 (← links)
- IR 05000333/2011004 (← links)
- IR 05000333/2010005 (← links)
- IR 05000333/2008003 (← links)
- IR 05000333/2006004 (← links)
- IR 05000333/2005003 (← links)
- IR 05000333/2002002 (← links)
- JAFP-17-0083, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ML16343A011 (← links)
- ML122750409 (← links)
- ML122710026 (← links)
- ML091550348 (← links)
- ML081370319 (← links)
- ML080170183 (← links)
- IR 05000333/2018002 (← links)
- ML071970491 (← links)
- ML071420019 (← links)
- JAFP-16-0147, Request for Extension to Comply with 03/12/2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Reliable Spent Fuel Pool Instrumentation (← links)
- IR 05000333/2018003 (← links)
- JAFP-15-0026, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events (← links)
- JAFP-13-0025, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- JAFP-09-0072, Response to Request for Additional Information Regarding: Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time (← links)
- JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time (← links)
- ML051400349 (← links)
- ML20081H014 (← links)
- IR 05000333/2021010 (← links)
- JAFP-97-0325, Forwards Response to Recent Request for Addl Info Pertaining to Proposed TS Amend to Delete Requirements for Plant PORC to Review Fire Protection Program & Implementing Procedures (← links)
- JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with (← links)
- JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info (← links)
- IR 05000333/2022002 (← links)
- JAFP-92-0470, Ja Fitzpatrick Nuclear Power Plant Annual Summary of Changes,Tests & Experiments for 1990 (← links)
- JAFP-92-0454, Special Rept:On 911003,discovered pin-hole Leak in Diesel Fire Pump.Caused by Discharge Pressure.Surveillance Test Procedure Was Revised (← links)
- JAFP-92-0316, Special Rept:On 920406,electric Driven Pump Was Out of Service for Approx 16 Days & 5 H.Caused by Extended Overhaul Time.Electric Motor Was Removed,Overhauled,Tested,Found Satisfactory & Returned to Plant (← links)
- IR 05000333/1993026 (← links)
- 05000333/LER-1992-030, :on 920708,hourly Roving Fire Watch Patrol Missed for 1 H When Fire Watch Left Plant W/O Being Properly Relieved.Caused by Failure to Follow Procedures. Procedures to Strengthen Fire Watch Changed (← links)
- 05000333/LER-1993-006, :on 930225,determined Inadequate Discharge Pressure on Fire Pump 76P-2,but Pump Was Not Declared Inoperable.Low Discharge Caused by Normal Wear.Pump Replaced & Test Procedures Will Be Revised (← links)
- ML20035D057 (← links)
- 05000333/LER-1993-004-01, :on 930225,scram Initiated by Taking Reactor Mode Switch Out of Run Mode When Water Level Observed to Be Below Normal.Caused by Slush Ice Present in Front of Bar Racks.Water Level Indicator Installed (← links)
- 05000333/LER-1993-006-01, :on 930225,fire Pump 76P-2 Declared Inoperable Due to Inadequate Pump Discharge Pressure.On 930226,fire Pump 76P-1 Declared Inoperable Due to Engine Overheating. Fire Pumps Will Be Replaced/Rebuilt (← links)
- JAFP-93-0113, Ro:On 930226,west Diesel engine-driven Fire Pump 76P-1 & Electric motor-driven Fire Pump 76P-2 Declared Inoperable. Caused by Engine Overheating & Failure to Deliver Discharge Pressure,Respectively.Third Fire Pump Installed (← links)
- IR 05000333/1990013 (← links)
- JAFP-90-0290, Special Rept:On 900302,diesel engine-driven Fire Pump 76P-1 Out of Svc for Approx 7 Days & 14 H Due to Failure & Replacement of Starter Motor.On 900315,fire Pump Failed to Start.Starting Sys Battery Replaced (← links)
- JAFP-17-0029, Revision to Entergys Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights. (← links)
- JAFP-16-0096, Supporting Information for Request for Relaxation of March 12, 2012 Commission Orders Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and Reliable Spent Fuel Pool (← links)
- ML102250115 (← links)
- IR 05000333/2025003 (← links)
- ML25353A381 (← links)