Pages that link to "02RV-71K"
← 02RV-71K
Jump to navigation
Jump to search
The following pages link to 02RV-71K:
Displayed 41 items.
- 05000333/LER-2015-002 (← links)
- 05000333/LER-2011-003 (← links)
- 05000333/LER-2007-001 (← links)
- 05000333/LER-2005-002 (← links)
- 05000333/LER-2003-002 (← links)
- 05000333/LER-2001-005 (← links)
- ML17219A123 (← links)
- ML15007A150 (← links)
- ML12342A142 (← links)
- ML12342A138 (← links)
- JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3 (← links)
- ML101750146 (← links)
- ML101740486 (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-17-0029, Revision to Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights... (← links)
- JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal (← links)
- JAFP-14-0143, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. (← links)
- JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) (← links)
- JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) (← links)
- JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) (← links)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves (← links)
- JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan (← links)
- ML19274D553 (← links)
- ML20045C476 (← links)
- JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval (← links)
- ML20069L017 (← links)
- ML20087K743 (← links)
- ML20097J669 (← links)
- ML20094M048 (← links)
- ML20094J242 (← links)
- ML20136B705 (← links)
- ML20149G246 (← links)
- ML20155E783 (← links)
- ML20199G592 (← links)
- ML20199G566 (← links)
- IR 05000333/1989004 (← links)
- JAFP-20-0087, Inservice Inspection Summary Report Cycle 24 (← links)
- JAFP-21-0022, Technical Requirements Manual Specifications - Redacted (← links)
- JAFP-95-0900, Submits Plant Annual Rept Re SRV Challenges & Failures (← links)
- IR 05000333/1993082 (← links)
- ML23095A376 (← links)