Text
.-
OPERATING DATA REPORT DOCKET NO 50-333 DATE 8 Feb 1979 CO.\\lPLETED IiY li. Zit fel t TELEPlf0NE (315) 342-3840 OPERATING STATUS Fit: Patrick Notes
- 1. Unit Name:
780101-780131
- 2. Reporting Period:
2436
- 3. Licensed Thermal Power (51Wt):
883
- 4. Nameplate Rating (Gross 51We):
821
- 5. Design Electrical Rating (Net alWe):
830
- 6. Slaximum Dependable Capacity (Gross alwe):
800
- 7. 31aximum Dependable Capacity (Net SIWE):
- 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Level To Which Restricted. If Any (Net 51We):
- 10. Reasons For Restrictions,if An):
This 5!onth Yr.-to-Date Cumulatise 744 744 30817
!!. Hours in Reporting Period 744 744 "Rn^ '
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown llours 744 744 22031.1
- 14. Ilours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown llours
- 16. Gross Thermal Energy Generated (alWII)
, 1334928 43544076 1334928 451280 451280 14746150
- 17. G oss Electrical Energy Generated (alwil) 437765 437765 14263790
- 18. Net Electrical Energy Generated (51Wil) 100%
100%
71.st
- 19. Unit Service Factor 100%
100%
71 ta
- 20. Unit Asailability Factor 73.5%
73.5%
65.7%
- 21. Unit Capacity Factor (Using SIDC Nett 71.7%
71.7%
56.4%
- 22. Unit Capacity Factor (Using DER Net) 0 0
i n a a-
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 51onthsIType.Date,and Duration of Each):
Scheduled Snubber Inspection and blaintenance Outage In Late blarch,1979 for a Period of 7 Days.
- 25. If Shnt Down At End Of Heport Period. Estimated Date of Startup:
- 26. Units in Test Status lPrior to Commerciat o erationl:
Forecast Achiesed r
INITIA L CRITICA LITY INITIAL ELECTRICITY COhl\\lERCI AL OPER ATION 7902130098
AV11( AGE il \\ll.Y UNII POh!.It LEVI.L DOCKET NO.
- 5 JAFNPP UNIT 8 Feb 1979 D \\TE E. Zufelt C0\\fPLETED HY (315) 342-3840 TELEPil0NE J nuary, 1979 M O N Til DAY AVERAGE dally POhER LEVEL DAY AVER AGE 1).\\ll.Y POhER I.EVEL Ot h,e-Net i ggyc.3c,,
I 17 582 581 2
18 583 3
19 584 4
20 585 580 5
21 585 580 6
22 585 S86 7
23 585 g
584 g
9 25 586 E
10 26 587 11 583 g
58
12 2s 525 58
33 29 599 582 14 30 652 584 15 582 16
SUMMARY
Unit Operated At Approximately 73'6 of Rated Themal Power During this Reporting Period. On January 28, Power was Reduced to Withdraw Control Rods for Flux Shaping and Power Increase.
I
1 S0-333 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAh!E 6 1-e b 1979 DATE 1:. Zufelt January, 1979 COMPLETED fly REPORT MONTil TELEPilONE (315) 342-3840 i
1 ho Cause & Corrective
,[g
}
.y Licensee
, g, E
3 Attion to No.
Date i
Eg g
jy5 Event gy gO H
$=
5 35g Report er mu Prevent Recurrence ou g
t t
\\
NONE I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation ot' Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets fm I icensee C Refueling 3-Automatic Scram.
Event Report (1.1.R) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & 1.icense Examin 1
5 F Administrative Exhibit 1 Same Source G-Operational Er ror (Explain)
(9/77)
Il Other (Explain)
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A.
FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JANUARY, 1979 The unit was in hold at approximately 600 MW during this reporting period due to failure of the e"A" Condensate Booster Pump.
On January 28, 1979 the pump was placed in service and power was increasing in accordance with PCIOMR.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary T
- f. r_
T,n n a rt-1070 W rk Request #
Cause of Results of Action taken to Repair Date System How Detected Component #
Malfunction Malfunction Preclude Time Recurrence (Hours) 12461 1-02-79 03 RPI-26-07 OPS Loose Connector Double Ind.
Tightened Conn.
1.0 12510 Full In Ind.
1-10-79 03 RPI-14-39 OPS Bad Probe Buffer At All Times Replaced G-33 16.0 12511 Full In/ Full Out 1-10-79 03 RPI-10-43 OPS Bad Probe Buffer At All Times Replaced Q16SG-33 16.0 142 Dirty Cam Cleaned Cam 1-18-79 06 06-LR-97 OPS Follower Erratic Alarm Follower 2.0 12287 12-26-78 07 "A" RBM OPS Unknown Failed St-5R N/A 100.0 12389 12-26-78 07 APRM/RBM GPS N/A N/A Setpoint Change 24.0 12574 Rep 1r ed Flow 1-9-79 07 B APRM OPS Age /Use Wrong Setting Control Board 16.0 12497 1-12-79 07 SRM "D" I6C Loose Conn.
Errctic Ind.
Tightened Conn.
4.0 12655 Dryed Out 1-17-79 07 LPRM 28-45 B OPS Moisture Downscale Cleaned Conn.
40.0 12565 1-11-79 10 10-LS-103 OPS Bad Light Bulb No Ind.
Replaced Bulb 1.0 12444 Increased Air 1-02-79 27 27-PCV-120 OPS Low Supp1v Air Innroner Control Supply S Oli-80 Prop. Band
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary 1T F _
Tomsom-1_ O" O W rk Request #
Cause of Results of Action taken to Repair Date System llow Detected Component #
Malfunction Malfunction Preclude Time Recurrence (flours) 12453 1-02-79 27 27-DWA-PA OPS Unknown Downscale ISP-31 2.0 12460 1-02-79 27 27-DWA-101A/B OPS Unknown Downscale ISP-31 2.0 83 1-29-79 27 27-0I-101A OPS Drift Downscale ISP-31 6.0 12475 Trouble Switch 1-09-79 76 76-CPI Maint.
Switch Posit.
f.larm Placed in Proper 6.0 Posicion 43 1-17-79 MISC X-104D,100BSX-100G OPS Leakage Low Press.
Repressurized 6.0
POWER AUT110RITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary REPAIR WORK REQUEST #
DATE.
SYSTEM 110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 1/9/79 13
- 12556 Surveillance Defective Close Torque Replace Torque Switch 30 13MOV-131 Switch 1/11/79 92
- 12557 NA Plant Modification-NA 1
02RV-71K, L Disconnected Pressure Switch Leads at 09-45 Panel. New Design Relief Valves Added During Outage Do Not llave Bellows Failure Pressure Switches 1/5/79 71
- 12537 NA Performed Quarterly NA 32 71 BAT-3A,3B Surveillance Test ST-16F 1/17/79 71
- 27 NA Performed Quarterly NA 2
1 71 BAT-3A,3B Surveillance Test ST-16F Following Equalize Charge
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWEn PLANT S
JOHN D. LEONARD, JR.
P.O. BOX 41 Resident Manager Lycoming, New York 13093 315-342 3840 February 8, 1979 JAFP-79-076 Director, Office of Management Information & Program Control United States Nuclear Regulatory Commission Washington, D.C.
20555
Reference:
Docket No. 50-333
Dear Sir:
The Operating Status Report for the month of January, 1979 is enclosed.
The refueling information remains the same as previously submitted.
If there are any questions concerning this report, contact Stanley Pobutkiewicz at 315-342-3840, Ext. 256.
Ver
- lygours,
/
/
/
fy te i ['h A,.'
s
..Jo 'n D. Leonafd, Jr.
[
i.~@
JDL:EZ:kes Enc.
-~
CC:
- USNRC, B.H.
Grier USNRC, Director, Office of Inspection and Enforcement Distribution
OPERATING DATA REPORT DOCKET NO. 50-333 DATE 8 Feb 1979 CO. lPLETED IlY E. Zufelt
\\
TELEPHONE f315) 342-3840 OPERATING STATUS Notes FitzPatrick
- 1. Unit Name:
780101-780131
- 2. Reporting Period:
2436
- 3. Licensed Thermal Power (31Wt):
883
- 4. Nameplate Rating (Gross SIWE):
821 S. Design Electrical Rating (Net SIWE):
830
- 6. Slaximum Dependable Capacity (Gross alwe):
800
- 7. Maximum Dependable Capacity (Net alwe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Level To Which Restricted. lf Any (Net alWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr to.Date Cumulatise 744 744 30817 i1. Hours in Reporting Period 744 744 oognn,
- 12. Number Of liours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown 11ours 744 744 22031,1
- 14. Ilours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown flours 1334928 1334928 43549076
- 16. Gauss Thermal Energy Generated (alWil) 451280 451280 14746150
- 17. Gross Electrical Energy Generated (alW'O 437765 437765 14263750
- 18. Net Electrics! Energy Generated (MWil) 100%
100%
71.5%
- 19. Unit Sersice Factor 100%
100g vi e
- 20. Unit Asaila'ility Factor a
73.5%
73.5%
65.7%
- 21. Unit Capacity Factor (Using MDC Net) 71 7%
71.7%
56.4%
- 22. Unit Capacity Factor (Using DER Net) 0 0
in ae
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 alonths IT)pe. Date and Duration of Each):
Scheduled Snubber Inspection and Maintenance Outage In Late March,1979 for a Period of 7 Days.
- 25. If Shut Down At End Of Iteport Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Conunercial Og cration):
Forecast Achiesed INITIAL CRITICA LITY INITIAL ELECTitlCi rY Cost \\lERCI tL OPER ATION
AVERAGE DAll.Y UNIT POWER LEVEL DOCKET NO.
~
JAFNPP UNIT 8 Feb 1979 DATE CONIPLETED BY TELEPHONE (315) 342-3840 January, 1979 510NTil DAY AVERAGE DAILY POWElt LEVEL DAY AVER AGE DAILY POhEll LEVEL (M We-Net )
of we. Net )
578 17 582 581 2
Ig 583 582 3
19 5_84 4
581 20 585 90 5
21 585 6
b '3 22 585 586 7
23 585 8
584 24 5%
585 9
25 586 584 10 26 587 583 11 27 582 582 12 28 525 582 13 9
599 582 14 30 652 IS 31 721 582 16
'SUhMARY :.
Unit Operated At Approximately 73% of Rated Thermal Power During this Reporting Period. On January 28, Power was Reduced to Withdraw Control Rods for Flux Shaping and Power Increase.
i 50-333 DOCKET NO.
' UNITSilVTDOWNS AND POWER REDUCTIONS UNIT N AME 6 m b 1979 DATE h.
Zutelt January, 1979 COMPLETED ilY REPORT MONTil TELEPilONE (315) 342-3840 n.
E E
w
,E g
}
$Y~
Licensee
,E r, ge, Cause & Corrective 3
Action to No.
Date i
5?
a
.2 s 5 Event 3,7 gV H
g:
35g Report
- un U Prevent Recurrence g
g O
t
\\
NONr I
I I_ _-
I 2
3 4
F: Forced Reason:
Method:
Exhibit C instructions S: Stheduled A Equipment Failure (Explain) 1 Minual for Preparation of Data P-Maintenance of Test 2 Manual Scram.
Entry Sheets foi 1.icensee C Refueling 3 Automatic Scram.
Event Itepor (1.1.lt) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & l.icense Examin i
F Administrative 5
Exhibit I Same Source G Operational Eiror (Explain)
(9/77)
Il-Olher (Explain)
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A.
FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JANUARY, 1979 The unit was in hold at approximately 600 MW during this reporting period due to failure of the e"A" Condensate Booster Pump.
On January 28, 1979 the pump was placed in service and power was increasing in accordance with PCIOMR.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary T
F. F - T, n n, rv 1070 W rk Request #
Cause of Results of Action taken to Repair Date System How Detected Component #
Malfunction Malfunction Preclude Time Recurrence (Hours) 12661 1-02-79 03 RPI-26-07 OPS Loose Connector Double Ind.
Tightened Conn.
1.0 12510 Full In Ind.
1-10-79 03 PPI-14-39 OPS Bad Probe Buffer At All Times Replaced G-33 16.0 12511 Full In/ Full Out 1-10-79 03 RPI-10-43 OPS Bad Probe Buffer At All Times Replaced Q16SG-33 16.0 142 Dirty Cam 3
Cleaned Crs 1-18-79 06 06-LR-97 OPS Follower Erratic Alarm Follower 2.0 12287 12-26-78 07 "A" RBM OPS Unknown Failed St-5R N/A 100.0 12389 12-26-78 07 APRM/RBM OPS N/A N/A Setpoint Change 24.0 12574 Replaced Flow 1-9-79 07 B APRM OPS Age /Use Wrong Setting Control Board 16.0 12497 1-12-79 07 SRM "D" ISC Loose Conn.
Erratic Ind.
Tightened Conn.
4.0 12655 Dryed Out 1-17-79 07 LPRM 28-45 B OPS Moisture Downscale Cleaned Conn.
40.0 12565 1-11-79 10 10-LS-103 OPS Bad Light Bulb No Ind.
Replaced Bulb 1.0 12444 Increased Air 1-02-79 27 27-PCV-120 OPS Low Supp1v Air Imnroner Control Supply 6 Adi.
8n Prop. Band
JAMF.S A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Su= mary I'r -
'-"-~1" r
e uest #
Cause of Results of Action taken to Pepair Date System How Detected Component e Malfunction Malfunction Preclude Tice Recurrence (Hours) 12453 1-02-79 27 27-DWA-PA OPS Unknown Downscale ISP-31 2.0 12460 1-02-79 27 27-DWA-101A/B OPS Unknown Downscale ISP-31 2.0 83 1-29-79 27 27-0I-101A OPS Drift Downscale ISP-31 6.0 12475
~-
Trouble Switch 1-09-79 76 76-CPI Maint.
Switch Posit.
Alarm Placed in Proper 6.0 Position 43 1-17-79 MISC X-104D,100BSX-100G OPS Leakage Low Press.
Repressurized 6.0
POWER AUTIIORITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT s
Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQUEST #
REPAIR DATE.
SYSTEM liOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
1100RS 1/9/79 13
- 12556 Surveillance Defective Close Torque Replace Torque Switch 30 13MOV-131 Switch 1/11/79 92
- 12557 NA Plant Modification-NA 1
02RV-71K, L Disconnected Pressure Switch Leads at 09-45 Panel. New Design Relief Valves Added During Outage Do Not IIave Bellows Failure Pressure Switches 1/5/79 71
- 12537 NA Performed Quarterly NA 32 71 BAT-3A,3B Surveillance Test ST-16F 1/17/79 71
- 27 NA Performed Quarterly NA 2
71 BAT-3A,3B Surveillance Test ST-16F Following Equalize Charge