Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136H441 + (Wastewater Rept for Oct 1985)
- ML20213G868 + (Wastewater Rept for Oct 1986)
- ML20078K248 + (Wastewater Rept for Sept 1983)
- ML20133L180 + (Wastewater Rept for Sept 1985)
- ML20211E682 + (Wastewater Rept for Sept 1986)
- ML20235V855 + (Wastewater Rept for Sept 1987)
- ML20093H400 + (Wastewater Rept for Sept 1995 for Davis-Besse Nuclear Power Station,Unit 1)
- ML20077M169 + (Wastewater Rept,Aug 1983)
- ML20079E260 + (Wastewater Rept,Dec 1983)
- ML20080N743 + (Wastewater Rept,Jan 1984)
- ML20141E740 + (Wastewater Rept,Mar 1986)
- ML19030B554 + (Wastewater Treatment Report for Month of June 1978)
- ML19030B551 + (Wastewater Treatment Report for the Month of July 1978)
- ML18079A903 + (Wastewater Treatment Rept for Jul 1979)
- ML18081A693 + (Wastewater Treatment Rept for Oct 1979)
- ML20134K637 + (Wastewater Treatment Sys Retrofit)
- ML16048A208 + (Wastewater Treatment Unit Schematic)
- ML070530083 + (Wat - Init Exam - 11/2006 - Draft Operating Exam)
- ML070530072 + (Wat - Init Exam - 11/2006 - Draft Written Exam)
- ML070530092 + (Wat - Init Exam - 11/2006 - Final Operating Exam)
- ML070530105 + (Wat - Init Exam - 11/2006 - Final Outline)
- ML040710185 + (Wat - Init Exam - 8/2003 - Draft Written Exam Comments ES-401-9)
- ML112430553 + (Wat 2011-08 Retake Draft OP Test (JPMs Only). Calculation of Containment Pressure)
- ML112430557 + (Wat 2011-08 Retake Draft OP Test Comments)
- ML112430550 + (Wat 2011-08 Retake Draft Outline Comments)
- ML112430546 + (Wat 2011-08 Retake Draft Outlines)
- ML21125A652 + (Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information)
- ML21196A530 + (Wat 2021010 RFI Letter 21N_05 Gap)
- ML22083A059 + (Wat 2022-02 Draft Op Test Comments)
- ML22083A060 + (Wat 2022-02 Draft Operating Test)
- ML22083A061 + (Wat 2022-02 Draft Outlines)
- ML22083A062 + (Wat 2022-02 Draft Written Comments)
- ML22083A063 + (Wat 2022-02 Draft Written Exam)
- ML22083A064 + (Wat 2022-02 Final Outlines)
- ML22041B109 + (Wat 2022301 Exam Approval Lrt Kdc (1))
- W3F1-2002-0075, Wat 3 - Retake Exam - 07/2002 - Post Examination Comments + (Wat 3 - Retake Exam - 07/2002 - Post Examination Comments)
- ML12214A280 + (Wat3 Followup Assessment Letter (Report 05000382-12-011))
- ML16251A500 + (Watch & Co-Petitioners Request for Hearing Regarding Entergys Request for Extension to Comply with NRC Order EA-13-109, Section IV Requirements Regarding Implementation of Phase 1 and Phase 2 Severe Accident Capable Vents.)
- ML102090024 + (Watch 2.206 Petition Regarding Inadequacy of Entergys Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim Station)
- ML111010613 + (Watch Answer to Entergys and NRC Staffs Reply to Pilgrim Watch Post-Hearing Memorandum Filed April 7, 2011)
- ML091950452 + (Watch Brief in Response to Entergys Response to CLI-09-11(Requesting Additional Briefing))
- ML18058A486 + (Watch Comments: Regulatory Analysis for Regulatory Basis: Regulatory Improvements for Power Reactors Transitioning to Decommissioning NRC (January 2018))
- ML081090242 + (Watch Exhibit List)
- ML110630442 + (Watch Findings of Fact Conclusions of Law Sama Remand)
- ML12254A869 + (Watch Information - 04-02-12 Pw Hearing Request)
- CY-12-011, Watch Information - Economic Consequences within NRC Regulatory Framework + (Watch Information - Economic Consequences within NRC Regulatory Framework)
- ML103340327 + (Watch Memo to Gauklers Request for Citations and Copies of Specified Documents in Disclosures 6 and 7)
- ML111741447 + (Watch Memorandum Re Submerged Cables)
- ML110710002 + (Watch Memorandum Regarding Fukushima)
- ML19227A290 + (Watch Memorandum in Support of Emergency Motion of the Commonwealth of Massachusetts for Clarification of the Commissions August 14, 2019 Memorandum and Order)
- ML111010612 + (Watch Memorandum-Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation)