Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Voltage Study". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20215E462  + (Voltage Study for Split Group Bus Configuration)
  • ML20009H126  + (Voltage Tests & Insulation Resistance Measurements on 1,000-Volt Control Cable, Final Technical Rept)
  • ENS 54064  + (Voltage Transient Due to Loss of Offsite Switchyard)
  • ML20236Y112  + (Voltage-Based Repair Criteria 90-Day Rept)
  • DCL-04-019, Voltage-Based Repair Criteria Benchmarking and EOC-12 Projections  + (Voltage-Based Repair Criteria Benchmarking and EOC-12 Projections)
  • ML22356A207  + (Volume 1 - Human Performance Test Facility)
  • ML061930439  + (Volume 1, Exhibit 1, Sections 5-7 & Appendices A-G to Summary of Facts, Data and Arguments on Which Applicant... - Redacted Version)
  • ML050030046  + (Volume 1, Part 2 PLP-201, Emergency Plan)
  • ML072200454  + (Volume 1, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, Application of Selection Criteria)
  • ML072200474  + (Volume 10, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.5 Emergency Core Cooling Systems)
  • ML16068A378  + (Volume 10, Section 02, Revision 018 to 10-S-02-1, ERF Inspection, Inventories, Operability Checks, and Maintenance, Non-Safety Related)
  • ML072200475  + (Volume 11, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.6 Containment Systems)
  • ML072200477  + (Volume 12, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.7 Plant Systems)
  • ML21147A122  + (Volume 13 Emergency Preparedness Procedures)
  • ML072200479  + (Volume 13, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.8 Electrical Power System)
  • ML072200481  + (Volume 14, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations)
  • ML072200483  + (Volume 15, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Chapter 4.0 Design Features)
  • ML072200485  + (Volume 16, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls)
  • ML072200486  + (Volume 17, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, Current Technical Specification Markup in CTS Order)
  • ML20245E458  + (Volume 1: FLEX HRA Expert Elicitation)
  • RIL 2022-11, Volume 2 - Comparing Operator Workload and Performance Between Digitized and Analog Simulated Environments  + (Volume 2 - Comparing Operator Workload and Performance Between Digitized and Analog Simulated Environments)
  • ML072200456  + (Volume 2, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment)
  • ML033490564  + (Volume 2, Revision 34 to EAP-4, Dose Assessment Calculations, and Volume 3, Revision 21 to EAP-42, Obtaining Meteorological Data)
  • ML20245E459  + (Volume 2: FLEX HRA Using IDHEAS-ECA)
  • ML19178A192  + (Volume 2: Illinois Appendix a - Unidirectional Strain-Controlled Direct Simple Hear Test Results)