Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23012A221 + (Visual Examination of Containment Surfaces Covered by Insulation - NRC Presentation Slides 1-19-23)
- ML19211C457 + (Visual Fuel Insp,Cycle 3/4 Refueling)
- ML20030A170 + (Visual Fuel Inspec Rept, Cycle 2/3 Refueling,Including Fuel Inspec Equip Description, & Sys Qualification)
- ML20127B702 + (Visual Insp Criteria for Structural Steel & Miscellaneous Metal Welding to Meet Design Requirements)
- ML19210C929 + (Visual Investigation of Reactor Fuels Response to Simulated Loss of Flow Heating Conditions,First Series)
- ML070670403 + (Visual/Surface Inspection Certification: David King, Mike Griffin Eye Examination Record: David King, Mike Griffin)
- ML20024E842 + (Vital AC Sys Automatic Bus Transfer Switches, Coordination Study)
- 05000318/LER-1982-055-03, Vital Ac Inverter 22 Failed,Causing 120-volt Ac Vital Bus 22 to Deenergize.Caused by Improper Vital Instrument Bus Fuses.Proper Fuses Installed + (Vital Ac Inverter 22 Failed,Causing 120-volt Ac Vital Bus 22 to Deenergize.Caused by Improper Vital Instrument Bus Fuses.Proper Fuses Installed)
- Regulatory Guide 5.65 + (Vital Area Access Controls,Protection of Physical Security Equipment,And Key and Lock Controls)
- ML19331D966 + (Vital Area Analysis Using Set Equation Transformation Sys)
- ML13218B227 + (Vital Battery Replacement, 08-05-13)
- ML20263T495 + (Vital Bus & DC One Line Diagram)
- ML20260K362 + (Vital Bus & DC One Line Diagram)
- 05000244/LER-2023-001, Vital Bus 17 Failed to Load Onto Emergency Diesel Generator B During Load / Safeguard Sequence Testing; Corroded Breaker Shunt Trip Attachment Plunger Found Which Indicated an Earlier Violation of Technical Specification 3.8.1 + (Vital Bus 17 Failed to Load Onto Emergency Diesel Generator B During Load / Safeguard Sequence Testing; Corroded Breaker Shunt Trip Attachment Plunger Found Which Indicated an Earlier Violation of Technical Specification 3.8.1)
- 05000272/FIN-2008007-04 + (Vital Bus Degraded Voltage Licensing Bases)
- 05000277/FIN-2008007-03 + (Vital Bus Degraded Voltage Protection (Section 1R21.2.1.8))
- 05000220/FIN-2008008-02 + (Vital Bus Degraded Voltage Relay Time Delay Licensing Bases)
- 05000220/FIN-2011011-01 + (Vital Bus Degraded Voltage Time Delay Not Maintained Within LOCA Analysis Assumptions)
- ML20150C774 + (Vital Equipment/Area Guidelines Study.Vital Area Committee Report,Final Report)
- 05000250/FIN-2018003-01 + (Vital Inverter Alternate AC Supply Cables Were Not Included in the Nuclear Safety Capability Assessment)
- ML20265D607 + (Vital One Line Diagram)
- ML20263N206 + (Vital One Line Diagram)
- ML20259B235 + (Vital Power Supply Sys Regulated Voltage Sys)
- ML20056G108 + (Vitrification Facility NRC Readiness Notebook, Vols I & II)
- ML20264B537 + (Vitro Site Grading Plan)
- ML20260E811 + (Vitro Site Grading Plan)
- ML20264B534 + (Vitro Site Plot Plan)
- ML20260E803 + (Vitro Site Plot Plan)
- ML20264B542 + (Vitro Site Utility Location Plan)
- ML20260E822 + (Vitro Site Utility Location Plan)
- ML18215A356 + (Vivot Equipment Corporation, New License, Control No. 609368)
- ML18215A354 + (Vivot Equipment Corporation,Cover Letter Dtd July 24, 2018, for New License, Control No. 609368)
- ML20262G625 + (Vixen Handheld Assembly)
- ML22230A624 + (Vj Technologies, Inc. DU Registration Certificate)
- ML23261A596 + (Vnc Historical Site Assessment RENTR- 22-010 Revision 0)
- ML25167A227 + (Vnc Lisjan Nation e-mail No Need to Participate in Moa Meeting)
- ML25167A229 + (Vnc Lisjan Nation e-mail Response with Potential Mitigation Measures)
- ML22258A120 + (Vnc Radiological Emergency Plan, Revision 1)
- ML22003A095 + (Vog 3 Dashboard 1-3-2022)
- ML21277A071 + (Vog 3 Dashboard 10-4-2021)
- ML21305A033 + (Vog 3 Dashboard 11-1-2021)
- EPID:L-2021-LLE-0049 + (Vog 3 Dashboard 11-1-2021)
- ML21244A203 + (Vog 3 Dashboard 9-1-2021)
- ML22003A096 + (Vog 4 Dashboard 1-3-2022)
- ML21277A076 + (Vog 4 Dashboard 10-4-2021)
- ML21305A034 + (Vog 4 Dashboard 11-1-2021)
- ML23152A130 + (Vog 4 Dashboard 6-1-2023)
- ML21244A219 + (Vog 4 Dashboard 9-1-2021)
- ML21197A042 + (Vog U1 Isi/Sgisi Request for Information (RFI) Letter)
- ND-18-0669, Voggle Electric Generating Plant Unit 3 and Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.03.07 (Index Number 616) + (Voggle Electric Generating Plant Unit 3 and Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.03.07 (Index Number 616))
- ND-18-0433, Voggle Electric Generating Plant Unit 3 and Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.10.05a.1 (Index Number 437) + (Voggle Electric Generating Plant Unit 3 and Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.10.05a.1 (Index Number 437))
- ML24305A166 + (Vogle Electric Generating Plant, Unit 3 - Summary of Conference Call Regarding the Fall 2024 Steam Generator Tube Inspections)