Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12324A106 + (Vista 360 Letter to U.S. Nuclear Regulatory Commission Regarding NRC Public Meeting of 11/01/2012 to Discuss Oversight of the Zion Decommissioning Project)
- ML18033B318 + (Vista 360, Zion ISFSI Decommissioning Funding Status Report)
- CP-202500255, Vistra - Supplement to Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Divisi + (Vistra - Supplement to Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1)
- ML26034C134 + (Vistra Fleet - Regulatory Audit Report Regarding License Amendment Request Related to Online Monitoring Program)
- L-25-190, Vistra Operations Company LLC (Vistra Opco), License Amendment Request - Alternative Technical Specification (TS) 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source + (Vistra Operations Company LLC (Vistra Opco), License Amendment Request - Alternative Technical Specification (TS) 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source)
- L-24-267, Vistra Operations Company LLC (Vistra Opco) Application to Revise Technical Specifications to Implement an Online Monitoring Program + (Vistra Operations Company LLC (Vistra Opco) Application to Revise Technical Specifications to Implement an Online Monitoring Program)
- ML25118A139 + (Vistra Operations Company LLC - Acceptance of Alternative VISTRA-ISI-ALT-2024-01 Request to Adopt ASME Code Case N-752)
- OI 4-2016-026, Vistra Operations Company LLC - Closure of Investigation (OI 4-2016-026) + (Vistra Operations Company LLC - Closure of Investigation (OI 4-2016-026))
- OI 4-2017-014, Vistra Operations Company LLC - Comanche Peak Nuclear Power Plant Closure of Investigation (OI 4-2017-014) + (Vistra Operations Company LLC - Comanche Peak Nuclear Power Plant Closure of Investigation (OI 4-2017-014))
- ML23104A313 + (Vistra Operations Company LLC Advisement of Supplemental References for Initial Prehearing Conference)
- ML23086C086 + (Vistra Operations Company LLCs Answer Opposing the Petition for Leave to Intervene and Request for Hearing of Citizens for Fair Utility Regulation)
- L-26-017, Vistra Operations Company, LLC - Notice of Intent to Pursue Subsequent License Renewal Applications + (Vistra Operations Company, LLC - Notice of Intent to Pursue Subsequent License Renewal Applications)
- CP-202400358, Vistra Operations Company, LLC - Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section + (Vistra Operations Company, LLC - Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI,)
- ML23213A216 + (Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for Information)
- PMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant + (Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant)
- ML24312A399 + (Vistra Operations Company, LLC, Notice of Intent to Pursue Subsequent License Renewal Applications)
- ML26023A152 + (Vistra Operations Fleet - Authorization to Use a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI for Inservice Inspection and Primary Containment Inservice Inspection)
- ML24057A092 + (Vistra/Energy Harbor License Transfer Conforming Amendments and Revised Indemnity Agreements)
- ML19323B574 + (Visual Aesthetic Impact of Alternative Closed Cycle Cooling Sys, Executive Summary)
- ML19309H188 + (Visual Aesthetic Impact of Alternative Closed Cycle Cooling Sys)
- ML19341A322 + (Visual Aesthetic Prediction Method for Use in Benefit-Cost Analysis, Interim Rept,Excerpt from NUREG/CR-0989,Vol 2)
- ML20076H396 + (Visual Exam Results of Segment 2,Fort St Vrain Fuel Elements 1-2415,1-0172,2-2693,1-0108 & 5-0801)
- ML20054G384 + (Visual Exam of Support Members & Structures for Piping Valves & Pumps by Direct or Remote Viewing, Revision 23)
- ML19344E322 + (Visual Examination Procedure, Revision 3 to Preservice Insp Program)
- ML23012A221 + (Visual Examination of Containment Surfaces Covered by Insulation - NRC Presentation Slides 1-19-23)
- ML19211C457 + (Visual Fuel Insp,Cycle 3/4 Refueling)
- ML20030A170 + (Visual Fuel Inspec Rept, Cycle 2/3 Refueling,Including Fuel Inspec Equip Description, & Sys Qualification)
- ML20127B702 + (Visual Insp Criteria for Structural Steel & Miscellaneous Metal Welding to Meet Design Requirements)
- ML19210C929 + (Visual Investigation of Reactor Fuels Response to Simulated Loss of Flow Heating Conditions,First Series)
- ML070670403 + (Visual/Surface Inspection Certification: David King, Mike Griffin Eye Examination Record: David King, Mike Griffin)
- ML20024E842 + (Vital AC Sys Automatic Bus Transfer Switches, Coordination Study)
- 05000318/LER-1982-055-03, Vital Ac Inverter 22 Failed,Causing 120-volt Ac Vital Bus 22 to Deenergize.Caused by Improper Vital Instrument Bus Fuses.Proper Fuses Installed + (Vital Ac Inverter 22 Failed,Causing 120-volt Ac Vital Bus 22 to Deenergize.Caused by Improper Vital Instrument Bus Fuses.Proper Fuses Installed)
- Regulatory Guide 5.65 + (Vital Area Access Controls,Protection of Physical Security Equipment,And Key and Lock Controls)
- ML19331D966 + (Vital Area Analysis Using Set Equation Transformation Sys)
- ML13218B227 + (Vital Battery Replacement, 08-05-13)
- ML20263T495 + (Vital Bus & DC One Line Diagram)
- ML20260K362 + (Vital Bus & DC One Line Diagram)
- 05000244/LER-2023-001, Vital Bus 17 Failed to Load Onto Emergency Diesel Generator B During Load / Safeguard Sequence Testing; Corroded Breaker Shunt Trip Attachment Plunger Found Which Indicated an Earlier Violation of Technical Specification 3.8.1 + (Vital Bus 17 Failed to Load Onto Emergency Diesel Generator B During Load / Safeguard Sequence Testing; Corroded Breaker Shunt Trip Attachment Plunger Found Which Indicated an Earlier Violation of Technical Specification 3.8.1)
- 05000272/FIN-2008007-04 + (Vital Bus Degraded Voltage Licensing Bases)
- 05000277/FIN-2008007-03 + (Vital Bus Degraded Voltage Protection (Section 1R21.2.1.8))
- 05000220/FIN-2008008-02 + (Vital Bus Degraded Voltage Relay Time Delay Licensing Bases)
- 05000220/FIN-2011011-01 + (Vital Bus Degraded Voltage Time Delay Not Maintained Within LOCA Analysis Assumptions)
- ML20150C774 + (Vital Equipment/Area Guidelines Study.Vital Area Committee Report,Final Report)
- 05000250/FIN-2018003-01 + (Vital Inverter Alternate AC Supply Cables Were Not Included in the Nuclear Safety Capability Assessment)
- ML20265D607 + (Vital One Line Diagram)
- ML20263N206 + (Vital One Line Diagram)
- ML20259B235 + (Vital Power Supply Sys Regulated Voltage Sys)
- ML20056G108 + (Vitrification Facility NRC Readiness Notebook, Vols I & II)
- ML20264B537 + (Vitro Site Grading Plan)
- ML20260E811 + (Vitro Site Grading Plan)
- ML20264B534 + (Vitro Site Plot Plan)