Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML103570333 + (Verbal Authorization of Request for Alternative ANO1-R&R-013)
- ML13085A159 + (Verbal Authorization on 12/18/2012, Request for Alternative W3-ISI-021, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval)
- ML13085A125 + (Verbal Authorization on 12/18/2012, Revised Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval)
- ML25021A022 + (Verbal Authorization to Use Alternative Methodology to Demonstrate Structural Integrity of Moderate Energy Class 3 Piping)
- ML112340505 + (Verbal Authorization, Relief Request RR-04-12, of Millstone 2 Temporary Non-Code Compliant Condition of Emergency Diesel Generator Supply Piping in the Service Water System)
- ML25072A282 + (Verbal Authorization, Relief Request Reactor Pressure Vessel Stud Inspection RBS-ISI-020)
- ML111010356 + (Verbal Authorization, Request for Alternative W3-ISI-019 from Inservice Inspection Requirements of Reactor Vessel Head In-Core Instrument Nozzles, Third 10-Year Inservice Inspection Interval)
- ML110910327 + (Verbal Authorization, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot-Leg Nozzle-to-Safe-End Dissimilar Metal Welds, 4th 10-Year Inservice Inspection Interval)
- ML20109A010 + (Verbal Part 26 Exemption - Delivered 4/18/20 at 7:00 P.M)
- ML091610499 + (Verbal Relief Related to Instrument Line Weld Overlay (TAC No. ME1319) (2-ISI-21))
- ML20099B257 + (Verbal Relief Unit 2 CIV)
- ML20098F301 + (Verbal Relief for Appendix I Safety Relief Valves)
- ML20099K215 + (Verbal Relief for CIVs - Delivered 4/8/2020 at 10:00 A.M)
- ML20100N322 + (Verbal Relief for Penetration Evaluation and Hot Leg Nozzles - Delivered 4/9/2020 at 10:00 Am)
- ML20314A028 + (Verbal Relief for Penetration Nozzle)
- ML083390526 + (Verbal Reliefs Related to Instrument Line Weld Overlay (TAC MD0155 & MD0172) (1-ISI-21 and 1-ISI-22))
- 05000335/LER-2009-001, Verbatim Technical Specification Surveillance Testing + (Verbatim Technical Specification Surveillance Testing)
- ML20237D228 + (Verfies Receipt of Completed NRC Form 483,dtd 980820.Subj Form Condition of General License Under 10CFR31.11, Authorizing in-vito Testing W/Byproduct Matl Under General License)
- ML20059P085 + (Verfies Receipt of Governor Certification Submitted by State of VT Re Low Level Waste Disposal)
- ML20072K812 + (Verification & Corrected Page 1 to 830627 Responses to Util First Set of Interrogatories.Certificate of Svc Encl)
- ML20212C646 + (Verification & Validation Final Rept for South Texas Project Qualified Display Processing Sys)
- ML20078P110 + (Verification & Validation Plan for Safety Parameter Display Sys)
- ML20213C795 + (Verification & Validation Program Summary Rept for Georgia Power Co,Vogtle Electric Generating Plant Emergency Response Facilities Computer Sys)
- ML20214S628 + (Verification & Validation:Final Rept for Plant Safety Monitoring Sys)
- ML20024B587 + (Verification Analysis Calculation)
- ML20091M864 + (Verification Analysis for Computer Program)
- ML20290A800 + (Verification E-mail of the Approval Version of Westinghouse Electric Company Topical Report WCAP-17794-P-A and WCAP-17794-NP-A, Revision 0, 10X10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 OPTIMA3)
- ML21239A086 + (Verification Email Approval Version of Westinghouse Electric Company Topical Report WCAP-18443-P-A/WCAP-18443-NP-A Rev. 0 Qualification of the Two-Dimensional Transport Code PARAGON2)
- ML23271A167 + (Verification Email for ACP Satisfaction of License Condition 29)
- ML22234A252 + (Verification Form 896 for Kairos Power LLC Topical Report on Fuel Performance Methodology)
- ML23138A367 + (Verification Form 896 for Kairos Power LLC Topical Report on Fuel Qualification Methodology)
- ML21321A166 + (Verification Form PWROG-19047-NP-A)
- ML22019A289 + (Verification Form for Final PWROG-20016-P-NP 1-19)
- ML21239A109 + (Verification Form for the Approval Version of Westinghouse Electric Company Topical Report WCAP-18443-P-A/WCAP-18443-NP-A Rev. 0 Qualification of the Two-Dimensional Transport Code PARAGON2)
- ML25195A132 + (Verification Form for the Approved Topical Report PWROG-18068-NP)
- ML25195A125 + (Verification Form for the Final Approved (-A) Topical Report PWROG-18068-NP, Revision 1)
- ML20290A812 + (Verification Form of the Approval Version of Westinghouse Electric Company Topical Report WCAP-17794-P-A and WCAP-17794-NP-A, Revision 0, 10X10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 OPTIMA3)
- ML18299A284 + (Verification Letter for ANP-10341P-A, Revision 0, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations)
- ML21228A224 + (Verification Letter for BWRX-300 LTR-A, Revision 2, RPV Isolation and Overpressure Protection Final)
- ML22196A010 + (Verification Letter for BWRX-300 LTR-A, Revision 3, Containment Evaluation Method)
- ML20188A111 + (Verification Letter for Kairos Power LLC PDC Topical Report)
- ML17261A863 + (Verification Letter for LANCR02 Physics Model Description and Qualification (NEDC-33376P and NEDC-33377P))
- ML19281D719 + (Verification Letter for Rev. 28 of Topical Report NEDE-24011-P-A Gestar II Main and Supplement)
- ML19318F168 + (Verification Letter for Technical Reports Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty - Revision 1-A and Utilization of the EPRI Depletion Benchmarks for Burnup Credit Validation - Revision 2-A)
- ML19240A956 + (Verification Letter for Topical Report EMF-93-177, Revision 1, Supplement 2P-A, Revision 1)
- ML17341A943 + (Verification Letter for the Approved Version of NEDC-33840P (Prime))
- ML24175A003 + (Verification Letter for the Project Named Palisades Nuclear Plant Restart Project - Restoration, Repair and Maintenance Fish and Wildlife Service to DOE Lpo)
- ML17262A000 + (Verification Letter of the Approval Version of the Nuclear Energy Institute Topical Report NEI 16-03-A, Revision 0, Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools, Revision 0)
- ML17352A018 + (Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-16996-P/WCAP-16996-NP, Volumes I, II, and III, Revision 1)
- ML18192B617 + (Verification Letter of the Approval Versions of the Pressured Water Reactor Owners Group Topical Report BAW-1543, Revision 4, Supplement 7-A Supplement to the Master Integrated Reactor Vessel Surveillances Program)
- ML18110A151 + (Verification Letter of the Approval Version of Framatome Inc. Topical Report ANP-10338P-A, Revision 0, Area - Arcadia Rod Ejection Accident)