Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML082560816 + (VCSNS GL 96-06 SRI Actions)
- ML20129H792 + (VCT Gas Control & RCS Chemical Addition)
- ML20260F042 + (VCT Outlet Isolation VLV Logic Diagram System:Cv. Actual Drawing NUMBER:5R-17-9-Z-42415 1)
- ML20265D516 + (VCT Outlet Isolation Vlv Logic Diagram System:Cv)
- ML20261M430 + (VCT Outlet Isolation Vlv Logic Diagram System:Cv)
- ML17293A247 + (VDH Review of Draft EA - NAPS ISFSI)
- ML23158A243 + (VEGP 3 Amendment to Remove Appendix C from COL (LAR 23-001))
- EPID:L-2023-LLA-0050 + (VEGP 3 Amendment to Remove Appendix C from COL (LAR 23-001))
- ML23072A271 + (VEGP 3 and 4 LAR 22-005 Ltr. to K. Brown, SNC, from C. Santos, NRC Regarding Amendments to Tech Spec Surveillance Requirement 3.0.3 for Never Performed Surveillances)
- ML23095A284 + (VEGP 3&4 Alternative Inspection Requirements for SG Nozzle to RCP Casing Welds (VEGP 3&4 ISI1-ALT-17))
- EPID:L-2022-LLR-0078 + (VEGP 3&4 Alternative Inspection Requirements for SG Nozzle to RCP Casing Welds (VEGP 3&4 ISI1-ALT-17))
- ML23109A067 + (VEGP 3&4 Alternative Use of Code Case N-648-2 (VEGP 3&4 ISI1-ALT-18))
- ML063000224 + (VEGP Environmental Report - Operating License Stage)
- ML073240572 + (VEGP Groundwater Calculation Package Addendum)
- ML19261A070 + (VEGP U3 Proficiency Watches Prior to Fuel Load)
- ML20134A037 + (VEGP Unit 1 Cycle 7 COLR, Rev 1)
- ML20134A050 + (VEGP Unit 2 Cycle 6 COLR, Rev 1)
- ML23243A980 + (VEGP Unit 3 Amendment Attachment)
- ML23243A968 + (VEGP Unit 3 Amendment No. 197 - Enclosure 1)
- ML20290A280 + (VEGP Unit 3 Final Commission Memo 10 CFR 103(g) Finding)
- ML20132A032 + (VEGP Unit 3 Issuance of Amendment Re Auxiliary Building Wall 11 Seismic Gap Requirements (LAR 20-001))
- EPID:L-2020-LLE-0009 + (VEGP Unit 3 Issuance of Amendment Re Auxiliary Building Wall 11 Seismic Gap Requirements (LAR 20-001))
- ML22348A088 + (VEGP Unit 4 - 103g - Basis Document)
- ML22348A185 + (VEGP Unit 4 - 2.106 Notifications to Governors)
- ML23243B057 + (VEGP Unit 4 Amendment Attachment)
- ML23243B054 + (VEGP Unit 4 Amendment No. 193 - Enclosure 2)
- ML21279A185 + (VEGP Unit 4 Exemption Request from Operator Written Examination and Operating Test)
- ML21320A041 + (VEGP Units 3 and 4 Exemption Request from Implementation of 10 CFR 73.55 and 73.56)
- ML23243A956 + (VEGP Units 3 and 4 LAR 22-002, Technical Specification 3.8.3, Inverters Operating, Completion Time Extension Amendments 197/193)
- ML23072A186 + (VEGP Units 3 and 4 LAR 22-005 - Amendments to Technical Specification Surveillance Requirement 3.0.3 for Never Performed Surveillances)
- ML21281A214 + (VEGP Units 3 and 4 Supplement to Exemption from Operator Written Examination and Operating Test for Unit 4)
- ML23243B049 + (VEGP Units 3 and 4, Safety Evaluation, LAR-22-002, TS 3.8.3 Inverters Operating, Completion Time Extension - Enclosure 3)
- ML23055A040 + (VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation)
- ML23335A137 + (VEGP, Units 3 and 4 Safety Evaluation Regarding Implementation of Mitigating Strategies for Order EA-12-049)
- NL-09-0585, VEGP-ISI-ALT-01, Version 1.0, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) + (VEGP-ISI-ALT-01, Version 1.0, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i))
- NL-10-0706, VEGP-ISI-ALT-03, Version 2, Proposed Alternative for the Third ISI Interval + (VEGP-ISI-ALT-03, Version 2, Proposed Alternative for the Third ISI Interval)
- NL-10-1663, VEGP-ISI-ALT-03, Version 3, Proposed Alternative for the Third ISI Interval + (VEGP-ISI-ALT-03, Version 3, Proposed Alternative for the Third ISI Interval)
- NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) + (VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii))
- NL-25-0111, VEGP3-4-ISI-ALT-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for Inservice Inspection (NL-25-0111) + (VEGP3-4-ISI-ALT-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for Inservice Inspection (NL-25-0111))
- EPID:L-2025-LLR-0053 + (VEGP3-4-ISI-ALT-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for Inservice Inspection (NL-25-0111))
- ML042590169 + (VEP-FRD-41, Rev 0.1-A, Vepco Reactor System Transient Analyses Using the Retran Computer Code (Volume 1))
- ML20028H085 + (VEP-NAF-1, Pdq Two Zone Model)
- ML033250573 + (VEPCO - North Anna Power Station, Units 1 and 2 Notification of Revision in Commitment Tracking Movement of Fuel Assembles)
- ML20010B624 + (VEPCO Flame Model)
- ML20087B058 + (VEPCO Investigative Board Preliminary Rept. W/O Cover Sheet)
- ML19094A814 + (VEPCO Letter, Serial No.874 Dated 01/26/1976 Forwarded Inservice Inspection Report ISI 76-1. Inservice Inspection Schedule Enclosed Therein Should Read Refueling Outage No. 2)
- ML20078K336 + (VEPCO Nomad Code & Model)
- ML18130A395 + (VEPCO North Anna Power Station & Surry Power Station Compliance W/10CFR50.49(b)(2))
- ML20248E874 + (VEPCO North Anna Power Station Unit 1 Jul 1989 Reactor Containment Integrated Leakage Rate Test)
- ML20247B933 + (VEPCO North Anna Power Station Unit 2 Apr 1989 Reactor Containment Integrated Leakage Rate Test, Per 10CFR50,App J)
- ML20032C700 + (VEPCO Nuclear Design Reliability Factors)