Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML090690432 + (Unit Nos.1 and 2 - Email Request for Additional Information Re License Amendment Request)
- ML003685308 + (Unit Nos.1 and 2 - Issuance of Amendments Containment Polar and Turbine Building Cranes)
- ML16043A151 + (Unit Nos.1 and 2 - Relief from the Requirements of the ASME Code)
- ML17304A010 + (Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001))
- ML102140128 + (Unit Nos.1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Low Temperature Overpessure Protection)
- ML19092A417 + (Unit Nos.1 and 2 Inservice Inspection Alternative Requests N1-I5-NDE-001 and N2 I5 NDE 001)
- L-2003-134, Unit Nuclear Material Inventory + (Unit Nuclear Material Inventory)
- 05000334/LER-2014-004, Unit Number 1 Regarding Unanalyzed Condition Resulting from Unfused Direct Current Control Circuits + (Unit Number 1 Regarding Unanalyzed Condition Resulting from Unfused Direct Current Control Circuits)
- ML100110085 + (Unit Number 1-Relief Request Number 1-TYP-4-B3.120-1 Regarding Inspection of Pressurizer Surge Line Nozzle)
- NL-15-041, Unit Number 2 - Response to Discussion on Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems + (Unit Number 2 - Response to Discussion on Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems)
- NL-11-097, Unit Number 2 - Response to Request for Additional Information on Relief Request IP2-ISI-RR-13 for the Reactor Vessel Weld Examination + (Unit Number 2 - Response to Request for Additional Information on Relief Request IP2-ISI-RR-13 for the Reactor Vessel Weld Examination)
- NL-13-115, Unit Number 2 - Response to Request for Additional Information Regarding Proposed License Amendment to Temporarily Connect Seismic to Non-seismic Piping Under Administrative Controls + (Unit Number 2 - Response to Request for Additional Information Regarding Proposed License Amendment to Temporarily Connect Seismic to Non-seismic Piping Under Administrative Controls)
- 05000412/LER-2014-002, Unit Number 2 Regarding Manual Reactor Trip Due to High Steam Generator Water Level During Plant Startup + (Unit Number 2 Regarding Manual Reactor Trip Due to High Steam Generator Water Level During Plant Startup)
- NL-14-025, Unit Number 2 and 3, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments + (Unit Number 2 and 3, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments)
- NL-12-069, Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System + (Unit Number 2, Relief Request IP2-1SI-RR-15 - Proposed Alternative to the Use of a Weld Reference System)
- RA-25-0213, Unit Number 2, Subsequent License Renewal Application Responses to Requests for Additional Information (RAI) and Requests for Confirmation of Information (RCI) + (Unit Number 2, Subsequent License Renewal Application Responses to Requests for Additional Information (RAI) and Requests for Confirmation of Information (RCI))
- 05000412/LER-2012-002, Unit Number 2, Unacceptable Indication Identified During Reactor Vessel Head Inspection + (Unit Number 2, Unacceptable Indication Identified During Reactor Vessel Head Inspection)
- NL-12-154, Unit Number 3 - Response to Request for Additional Information on Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank + (Unit Number 3 - Response to Request for Additional Information on Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank)
- NL-14-089, Unit Number 3, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Special Nuclear Material + (Unit Number 3, Event Report for Discovery of a Condition That Prevented Immediate Protective Actions to Avoid Exposures to Radiation from Special Nuclear Material)
- NL-13-155, Unit Number 3, Response on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping + (Unit Number 3, Response on Relief Request IP3-008 to Allow Temporary Non-Code Repair to Service Water Piping)
- NL-15-007, Unit Numbers 1, 2, and 3 - Consent to Confirmatory Orders EA-14-135 and EA-14-136 and Hearing Waiver Form + (Unit Numbers 1, 2, and 3 - Consent to Confirmatory Orders EA-14-135 and EA-14-136 and Hearing Waiver Form)
- ML13294A092 + (Unit Numbers 2 & 3 - Response to Request for Additional Information Regarding License Amendment to Adopt TSTF-432-A, Rev 1, Change in Technical Specifications End States WCAP-16294)
- ENS 53861 + (Unit One Hpci System Inoperable Due to Blown Fuse)
- ML20062D904 + (Unit One Loose Parts Monitoring Sys Special Rept)
- ML20117D061 + (Unit One Maximum Doses Resulting from Aquatic Effluents Period of Release 950101-1231)
- ML20260D259 + (Unit One Slope Configuration)
- ML022630304 + (Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt)
- RS-05-004, Unit Physical Security Plan Revision 1, Without Enclosures + (Unit Physical Security Plan Revision 1, Without Enclosures)
- ENS 43050 + (Unit Reactor Trip Due to Grid Disturbance)
- 05000413/LER-2014-001, Unit Regarding Condition Prohibited by Technical Specifications (TS) and Notice of Enforcement Discretion (NOED) Due to Misaligned Connecting Rod Bearing on Diesel Generator (DG) 1A + (Unit Regarding Condition Prohibited by Technical Specifications (TS) and Notice of Enforcement Discretion (NOED) Due to Misaligned Connecting Rod Bearing on Diesel Generator (DG) 1A)
- ML20129H903 + (Unit Shift Supervisor Relief Checklist)
- ML20148G801 + (Unit Shutdown & Power Reductions Form of Monthly Rept for Feb 1988)
- ENS 42954 + (Unit Shutdown Required Due to Service Water Leak Involving a Containment Air Cooler)
- 05000498/LER-2010-001, Unit Shutdown Required by Technical Specifications + (Unit Shutdown Required by Technical Specifications)
- ML17325B126 + (Unit Shutdowns & Power Reductions Rept Inadvertently Omitted from Monthly Operating Rept for Oct 1988)
- ML040860749 + (Unit Shutdowns and Power Reductions for October 1986)
- ML19308B785 + (Unit Startup & Power Escalation Test, Revision 0)
- Information Notice 1986-80, Unit Startup with Degraded High Pressure Safety Injection System + (Unit Startup with Degraded High Pressure Safety Injection System)
- ML17310B460 + (Unit Steam Generator Eddy Current Exam 4th Refueling Outage, Mar 1993)
- 05000456/LER-2021-002, Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System + (Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System)
- ML21230A028 + (Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System)
- 05000456/LER-2019-001, Unit Trip on Low Steam Generator Level Due to Failure of a Controller on a Feedwater Regulating Valve + (Unit Trip on Low Steam Generator Level Due to Failure of a Controller on a Feedwater Regulating Valve)
- 05000361/LER-2009-001, Unit Trip on Low Vacuum Caused by Intake Circulating Water Gate + (Unit Trip on Low Vacuum Caused by Intake Circulating Water Gate)
- 05000456/LER-2018-005, Unit Trip on Turbine Anti-Motoring Circuit Caused by Weld Blockage of Instrument Line with a Failed Differential Pressure Switch Assembly + (Unit Trip on Turbine Anti-Motoring Circuit Caused by Weld Blockage of Instrument Line with a Failed Differential Pressure Switch Assembly)
- ENS 47847 + (Unit Two Automatic Reactor Scram on High Reactor Pressure)
- 2CAN068408, Unit Two Cycle Four Startup Rept, for Period Ending 840315 + (Unit Two Cycle Four Startup Rept, for Period Ending 840315)
- ML20128B852 + (Unit Two Effluent & Off Site Dose Rept for Jul-Sept 1992)
- 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications + (Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications)
- ML11126A310 + (Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36)
- ML20073L186 + (Unit Vent Monitor Readings for Site & General Emergencies)
- ML19224B465 + (Unit Work Requests for 781027-790520)