ML21230A028

From kanterella
Jump to navigation Jump to search
Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System
Date released: 08/26/2021 Download: ML21230A028


Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System
ML21230A030
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/18/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
BW210054
Download: ML21230A030 (3)
Unit Trip on Generator Load Rejection Due to Lightning Strike within the Unit Switchyard Exceeding the Capabilities of the Switchyard Grounding System
ML21230A029
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/18/2021
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW210054
Download: ML21230A029 (1)