On April 18, 2012, at 1511 hours (CDT), anOn April 18, 2012, at 1511 hours (CDT), an automatic scram occurred on high reactor pressure. The pressure increase occurred during post-modification testing on the main generator automatic voltage regulator, which had been upgraded during the recent refueling outage.</br>Following the reactor scram, reactor water level decreased to approximately zero inches, which resulted in automatic Group II and III isolations (Reactor Water Clean Up and Secondary Containment Isolation) as expected. All systems responded properly to the event. The cause of the event is still under investigation.</br>Unit 1 was unaffected by the event and remains at 100% power.</br>This report is being made in accordance with 10CFR50.72(b)(2)(iv)(B) and 10CFR50.72(b)(3)(iv)(A).</br>All Control Rods fully inserted, decay heat is being removed through the bypass steam valves to the main condenser, and the plant remains in a normal shutdown electrical alignment.</br>The high reactor pressure appears to have been caused by a load rejection associated with the main generator voltage regulator testing.</br>The licensee has informed the NRC Resident Inspector.e has informed the NRC Resident Inspector.  +
20:11:00, 18 April 2012  +
47,847  +
18:07:00, 18 April 2012  +
20:11:00, 18 April 2012  +
On April 18, 2012, at 1511 hours (CDT), anOn April 18, 2012, at 1511 hours (CDT), an automatic scram occurred on high reactor pressure. The pressure increase occurred during post-modification testing on the main generator automatic voltage regulator, which had been upgraded during the recent refueling outage.</br>Following the reactor scram, reactor water level decreased to approximately zero inches, which resulted in automatic Group II and III isolations (Reactor Water Clean Up and Secondary Containment Isolation) as expected. All systems responded properly to the event. The cause of the event is still under investigation.</br>Unit 1 was unaffected by the event and remains at 100% power.</br>This report is being made in accordance with 10CFR50.72(b)(2)(iv)(B) and 10CFR50.72(b)(3)(iv)(A).</br>All Control Rods fully inserted, decay heat is being removed through the bypass steam valves to the main condenser, and the plant remains in a normal shutdown electrical alignment.</br>The high reactor pressure appears to have been caused by a load rejection associated with the main generator voltage regulator testing.</br>The licensee has informed the NRC Resident Inspector.e has informed the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0175 d (0.42 hours, 0.0025 weeks, 5.749355e-4 months)  +
00:00:00, 18 April 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:22, 2 March 2018  +
18:07:00, 18 April 2012  +
-0.0863 d (-2.07 hours, -0.0123 weeks, -0.00284 months)  +
20:11:00, 18 April 2012  +
Unit Two Automatic Reactor Scram on High Reactor Pressure  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +