Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49021 + (Unit 3 Manual Reactor Trip Due to Malfunction of Turbine Valves)
- 05000287/LER-2015-001, Manual Reactor Trip Due to Unacceptable Main Feedwater Flow Control Valve Oscillations + (Unit 3 Manual Reactor Trip Due to Unacceptable Main Feedwater Flow Control Valve Oscillations)
- 05000530/LER-2001-002 + (Unit 3 Mode 3 Entry With An Auxiliary Feed Water Pump Inoperable)
- 05000259/FIN-2009004-01 + (Unit 3 Reactor Core Isolation Cooling Pump Flow Oscillations)
- ENS 44525 + (Unit 3 Reactor Manually Tripped Following Automatic Turbine Trip on High Vibration)
- ML17304B214 + (Unit 3 Reactor Trip Following Large Load Reject)
- ML031180025 + (Unit 3 Renewed Facility Operating License)
- ML090400677 + (Unit 3 SBO Event: Time Line to Energize Unit 3 Bus from App R Diesel Via Gt/Bt)
- ML17238A769 + (Unit 3 Second Reload Associated Technical Specification Changes)
- ENS 42451 + (Unit 3 Shutdown Due to Potential Safety Injection Tank Gasket Issue)
- 05000361/FIN-2012007-07 + (Unit 3 Steam Generator 3E0-88 Stresses Related to Handling)
- ML17305A340 + (Unit 3 Steam Generator Eddy Current Exam,First Refueling Outage Apr 1989, NDE Summary Rept)
- ENS 47744 + (Unit 3 Steam Generator Tubes Failed In-Situ Pressure Testing)
- 05000287/LER-2004-001 + (Unit 3 Trip Due to Foreign Material in Turbine Electro-Hydraulic Control System)
- 05000269/FIN-2009004-02 + (Unit 3 Trip Due to Generator Phase Differential Lockout)
- L-2015-299, Unit 3 and 4 Uprate Monitoring + (Unit 3 and 4 Uprate Monitoring)
- 05000287/LER-2005-002 + (Unit 3 trip with ES actuation due to CRD Modification Deficiencies)
- NL-24-0408, Unit 3, Core Operating Limits Report, Cycle 2, Version 1 + (Unit 3, Core Operating Limits Report, Cycle 2, Version 1)
- SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds + (Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds)
- 05000277/LER-2018-002, Unit 3, Emergency Diesel Generator Air Inlet Check Valve Failure Results in a Condition Prohibited by Technical Specifications + (Unit 3, Emergency Diesel Generator Air Inlet Check Valve Failure Results in a Condition Prohibited by Technical Specifications)
- CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 + (Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014)
- W3F1-2002-0104, Unit 3, License Amendment Request NPF-38-245 Use of CEN-372-P-A + (Unit 3, License Amendment Request NPF-38-245 Use of CEN-372-P-A)
- ML11355A206 + (Unit 3, State of New York Submittal of Joint Motion for Approval of Settlement Agreement and Dismissal of New York State Contention 24 with Affiliated Documents)
- ML020100477 + (Unit 3, Technical Specification, Reactor Coolant System, Isolated Loop Startup)
- ML24053A263 + (Unit 3, and Independent Spent Fuel Storage Installation, Notification Pursuant to 10 CFR 72.212(b)(1) Prior to First Storage of Spent Fuel Under a General License)
- ML19340A166 + (Unit 3,Cycle 2,Startup Testing Summary)
- ML19340A135 + (Unit 3,Cycle 3,Startup Testing Summary)
- ML20344A029 + (Unit 3: Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Deferring Flaw Re-inspections for One Cycle)
- 05000249/FIN-2014005-01 + (Unit 3A LPCI Heat Exchanger Supports Returned to Service with Unacceptable Indications)
- ML18191B341 + (Unit 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.a (Index Number 806))
- ML18191B340 + (Unit 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.lll.a (Index Number 803))
- ND-18-0813, Unit 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.a (Index Number 809) + (Unit 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.a (Index Number 809))
- ML18191B339 + (Unit 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.ll.a (Index Number 800))
- L-2007-211, Unit 4 - Emergency Response Data System (ERDS) Maintenance, Revised Data Sheets + (Unit 4 - Emergency Response Data System (ERDS) Maintenance, Revised Data Sheets)
- L-2020-096, Unit 4 - Errata Corrections to FPL Letter L-2019-017 + (Unit 4 - Errata Corrections to FPL Letter L-2019-017)
- L-2020-152, Unit 4 - Flooding Focused Evaluation-Summary of Commitment Revisions for Flooding Protection Features Planned Changes + (Unit 4 - Flooding Focused Evaluation-Summary of Commitment Revisions for Flooding Protection Features Planned Changes)
- ND-18-0830, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.2.00.01c.ii (Index Number 742) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.2.00.01c.ii (Index Number 742))
- ND-18-1508, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.2.01.04a.ii (Index Number 96) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.2.01.04a.ii (Index Number 96))
- ND-19-0257, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.3.02.08a.ii (Index Number 302) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.3.02.08a.ii (Index Number 302))
- ND-18-0831, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.2.00.01d (Index Number 743) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.2.00.01d (Index Number 743))
- ND-21-1025, Unit 4 - ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.02.i (Index Number 565) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC Item 2.5.05.02.i (Index Number 565))
- ND-18-0313, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.3.06.09a.i (Index Number 372) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.3.06.09a.i (Index Number 372))
- ND-21-0054, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.6.03.04b (Index Number 602) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.6.03.04b (Index Number 602))
- ND-20-0698, Unit 4 - ITAAC Closure Notification on Completion of ITAAC E.3.9.05.01.08 (Index Number 856) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC E.3.9.05.01.08 (Index Number 856))
- ND-18-0696, Unit 4 - ITAAC Closure Notification on Completion of ITAAC2.2.05.07a.ii (Index Number 266) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC2.2.05.07a.ii (Index Number 266))
- ND-18-0349, Unit 4 - ITAAC Closure Notification on Completion of ITAAC C.3.8.01.01 (Index Number 842) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC C.3.8.01.01 (Index Number 842))
- ND-20-0500, Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a (Index Number 784) + (Unit 4 - ITAAC Closure Notification on Completion of ITAAC 3.3.00.05a (Index Number 784))
- ML073230627 + (Unit 4 - Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity)
- ND-19-1006, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.2.6.09.07 (Index Number 667) + (Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.2.6.09.07 (Index Number 667))
- ND-19-0124, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.09.13c (Index Number 654) + (Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.09.13c (Index Number 654))
- ND-18-0092, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.05.01 (Index Number 252) + (Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.05.01 (Index Number 252))