Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41028 + (Turbine Trip/Reactor Trip)
- ENS 41837 + (Turbine Trip/Reactor Trip)
- ENS 43096 + (Turbine Trip/Reactor Trip)
- ENS 45077 + (Turbine Trip/Reactor Trip Due to Condenser Vacuum)
- ENS 45525 + (Turbine Valve Trips Did Not Meet Tech Specs)
- ENS 49765 + (Turbine and Rad Waste Buildings Radiation Monitors Inoperable Due to Planned Maintenance)
- 05000255/FIN-2015001-03 + (Turbine-Driven AFW Pump Trip During Surveillance Testing)
- 05000315/FIN-2014004-02 + (Turbine-Driven Auxiliary Feedwater Mission Time)
- 05000483/FIN-2009009-01 + (Turbine-Driven Auxiliary Feedwater Pump Inoperable Due to Inadequately Lubricated Trip Throttle Valve)
- 05000305/LER-2005-008, Turbine-Driven Auxiliary Feedwater Pump Inoperable Due to Insufficient Net Positive Suction Head + (Turbine-Driven Auxiliary Feedwater Pump Inoperable Due to Insufficient Net Positive Suction Head)
- Information Notice 2014-03, Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues + (Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues)
- 05000255/FIN-2011003-04 + (Turbine-Driven Auxiliary Feedwater Pump Trip)
- 05000483/LER-2009-003, Turbine-Driven Auxiliary Feedwater Pump Inoperable During Mode Change from 4 to 3 + (Turbine-Driven Auxiliary Feedwater Pump Inoperable During Mode Change from 4 to 3)
- 05000285/FIN-2010006-04 + (Turbine-driven Auxiliary Feedwater Pump Trip Due to Inadequate Design Margin)
- ML20266J895 + (Turbine/Misc Bldg HVAC System Ventilation for Diesel Generators Feed Pumps Oil Storage Turbine Bldg Gas Bottle Storage Elevator & Screenhouse P&Id, as-built)
- 05000390/LER-2001-004, Turbine/Reactor Initiated by an Invalid AMSAC Signal + (Turbine/Reactor Initiated by an Invalid AMSAC Signal)
- ML20264E331 + (Turbogenerator and Feedwater Console RL005 and RL006)
- ML20262G564 + (Turbogenerator and Feedwater Console RL005 and RL006)
- ML20262A051 + (Turbogenerator and Feedwater Console RL005 and RL006)
- ML20262G579 + (Turbogenerator and Feedwater Main Control Board RL023 and RL024)
- ML20262A078 + (Turbogenerator and Feedwater Main Control Board RL023 and RL024)
- ML20264E326 + (Turbogenerator and Feedwater Main Control Board RL023 and RL024)
- ML20264E325 + (Turbogenerator and Feedwater Main Control Board RL025 and RL026)
- ML20262A081 + (Turbogenerator and Feedwater Main Control Board RL025 and RL026)
- ML20262A180 + (Turbogenerator and Feedwater Main Control Board RL025 and RL026)
- ML20093A627 + (Turbulence Modeling in the Commix Computer Code)
- ML020860561 + (Turke Point 3 & 4 - Amendment to Revise TS to Perform 24 Hours EDG Testing During Power Opertaion)
- ENS 40189 + (Turket Point Units 3 & 4 Fitness for Duty Report)
- ML100670516 + (Turkey Initial Exam 2009-302 Draft Administrative Documents)
- ML110450587 + (Turkey Point Final Significance Determination - NRC Inspection Report 05000250-10-406 and 05000251-10-406)
- L-2011-349, Turkey Point Initial Exam 2011-302 General Correspondence + (Turkey Point Initial Exam 2011-302 General Correspondence)
- ML23031A190 + (Turkey Point Nuclear Generating Station, Units 3 and 4 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application)
- ML16011A330 + (Turkey Point Nuclear Plant - U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report Nos. 05000250/2015501 And 05000251/2015501)
- L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps + (Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps)
- ENS 52136 + (Turkey Point Unit 3 Shutdown Due to Water Hammer)
- ML18072A224 + (Turkey Point Units 3 and 4, Subsequent License Renewal Application - Supplement 3)
- L-2016-222, Turkey Point, Unit 3 and 4, 2015 Emergency Plan Hostile Action Based Exercise Scenario + (Turkey Point, Unit 3 and 4, 2015 Emergency Plan Hostile Action Based Exercise Scenario)
- L-2010-173, Turkey Point, Unit 4, BADGER Test Results - License Condition 3.H(b) + (Turkey Point, Unit 4, BADGER Test Results - License Condition 3.H(b))
- L-2009-135, Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate + (Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate)
- L-2011-036, Turkey Point, Units 3 & 4 - Response to NRC Request for Additional Information (RAI) Regarding NRC General Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (Turkey Point, Units 3 & 4 - Response to NRC Request for Additional Information (RAI) Regarding NRC General Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- L-2010-031, Turkey Point, Units 3 & 4, 2009 Annual Radioactive Effluent Release Report + (Turkey Point, Units 3 & 4, 2009 Annual Radioactive Effluent Release Report)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, List of Effective Pages + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, List of Effective Pages)
- L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 5, Structures + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 5, Structures)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Appendix B, Questions and Responses Related to Initial NRC Review of Operating License Application + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Appendix B, Questions and Responses Related to Initial NRC Review of Operating License Application)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion Systems + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion Systems)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, Appendix 14A Thru Appendix 14G + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, Appendix 14A Thru Appendix 14G)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 15, Technical Specifications + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 15, Technical Specifications)
- L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission + (Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission)