Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML040630682 + (To WCAP-15068, Vogtle Electric Generating Plant, Unit 1, Heatup and Cooldown Limit Curves for Normal Operation)
- ML040630687 + (To WCAP-15161, Vogtle Electric Generating Plant, Unit 2, Heatup and Cooldown Limit Curves for Normal Operation)
- ML032930103 + (To WCAP-15813-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Millstone, Unit 2)
- ML022390082 + (To WCAP-15909-NP, Regulatory Guide 1.121 Analysis for Indian Point Unit 2 Replacement Steam Generators)
- ML040300702 + (To WCAP-15919-NP, Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves)
- DCL-03-132, To WCAP-15919-NP, Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves + (To WCAP-15919-NP, Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves)
- ML031820670 + (To WCAP-15984-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Sequoyah Units 1 & 2)
- ML033070012 + (To WCAP-16027-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Turkey Point, Units 3 and 4)
- ML040630675 + (To WCAP-16142-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Vogtle, Units 1 and 2)
- ML033650400 + (To WCAP-16144-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Beaver Valley, Unit 2)
- ML040350663 + (To WCAP-16157-NP, Stretch Power Uprate NSSS and BOP Licensing Report, Pages 6.4-1 Through 11-2)
- ML040370423 + (To WCAP-16157-NP, Stretch Power Uprate NSSS and BOP Licensing Report, Cover Page Through Page 6.3-160)
- ML040120622 + (To WCAP-16170-NP, Diablo Canyon SG Alternate Repair Criteria Bases on Limited Tube Support Plate Displacement)
- ML043000356 + (To WCAP-16245-NP, Analysis of Capsule X from Tennessee Valley Authority, Watt Bar Unit 1 Reactor Vessel Radiation Surveillance Program)
- ML19323E316 + (To WCAP-8587, Methodology for Qualifying Westinghouse Wrd Supplied Safety-Related Electrical Equipment)
- ML20069G491 + (To Waterford Ses Unit 3 Response to NUREG-0588, Introduction,Methodology & Master Equipment List, Vol 1)
- ML20069G497 + (To Waterford Ses Unit 3 Response to NUREG-0588, Qualification Data Evaluation Forms, Vols 2 & 3)
- ML063180462 + (To Yucca Mountain (Highway Data Network))
- ML062510091 + (To from ). Expectations/Accountability)
- ML062510084 + (To from ). Expectations/Accountability)
- ML062510123 + (To from ). Jumping on the Train)
- ML062540152 + (To from ). on February 6, 2003 the Shift Managers and Assistant Operations Managers Met to Discuss the Business Plan)
- ML062680047 + (To from Concerns Related to the Handling of the MS-42 Steam Leak)
- 2CAN050802, To the ANO-2 Cycle 20 COLR + (To the ANO-2 Cycle 20 COLR)
- L-MT-09-008, To the Core Operating Limits Report for Cycle 24 + (To the Core Operating Limits Report for Cycle 24)
- CPSES-200401176, To the Core Operating Limits Reports + (To the Core Operating Limits Reports)
- ND-20-1263, To the Cyber Security Plan + (To the Cyber Security Plan)
- L-2014-245, To the Cyber Security Plan + (To the Cyber Security Plan)
- SBK-L-18081, To the Cyber Security Plan (CSP) for Seabrook Station + (To the Cyber Security Plan (CSP) for Seabrook Station)
- NG-18-0062, To the Cyber Security Plan for Duane Arnold Nuclear Plant + (To the Cyber Security Plan for Duane Arnold Nuclear Plant)
- ML16014A097 + (To the Cycle 20 Core Operating Limits Report)
- ML031990011 + (To the Debtor, Official Committee of Unsecured Creditors, Office of the United States Trustee and Parties Requesting Special Notice)
- HBL-12-003, To the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance Plan + (To the Defueled Safety Analysis Report and Revision 28 to the Quality Assurance Plan)
- HBL-10-005, To the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications Bases + (To the Defueled Safety Analysis Report, Revision 26 to the Quality Assurance Plan, and Revision 3 to the Technical Specifications Bases)
- ML23152A158 + (To the Emergency Preparedness Plan for the University of Massachusetts Lowell Research Reactor (Umlrr))
- ML23257A240 + (To the Emergency Preparedness Plan for the University of Massachusetts Lowell Research Reactor - Marked Copy (Redacted))
- ML23152A161 + (To the Emergency Preparedness Plan for the University of Massachusetts Lowell Research Reactor)
- ML25241A352 + (To the Environmental Report for the Long Mott Generating Station Construction Permit Application)
- ML25241A351 + (To the Environmental Report for the Long Mott Generating Station Construction Permit Application)
- L-2011-390, To the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements + (To the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements)
- ML072080377 + (To the Final Status Survey Report for Phase V)
- CY-07-104, To the Final Status Survey Reports for Phase VI and VII + (To the Final Status Survey Reports for Phase VI and VII)
- NL-03-137, To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications + (To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications)
- NL-03-127, To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications + (To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications)
- NL-03-081, To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications + (To the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications)
- NL-03-154, To the Indian Point, Unit 2, License Amendment Request for Conversion to Improved Standard Technical Specifications + (To the Indian Point, Unit 2, License Amendment Request for Conversion to Improved Standard Technical Specifications)
- ML23143A199 + (To the Letter Dated May 17, 2023, Regarding SMR, LLC, Preapplication Meeting Materials for May 25, 2023)
- ML042030312 + (To the License Amendment Request (LAR) for Temporary Extension to the Completion Times for One and Two Keowee Hydro Units Inoperable Technical Specification Change (TSC) Number 2002-05)
- ML081220708 + (To the License Amendment Request for Deviation from Fire Protection Program Requirements)
- ML040910359 + (To the License Amendment Request for Temporary Extensions to the Completion Times for One or Two Keowee Hydro Units Inoperable Technical Specification Change (TSC) Number 2002-05)
- ML040440337 + (To the License Amendment Request for Temporary Extensions to the Completion Times for One or Two Keowee Hydro Units Inoperable Technical Specification Change (TSC) Number 2002-05)