Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195C386 + (TN-8L Draft Unloading Procedure for McGuire Station)
- ML20260H906 + (TN-8L Packaging)
- ML19291B707 + (TN-Americas, LLC, Tn Eagle, Agenda Pre-Application Meeting on November 14, 2019)
- ML14252A892 + (TN1184 - NRC 2012 Peach Bottom Atomic Power Station Unit 2)
- ML14217A379 + (TN1298 - U.S. Nuclear Regulatory Commission 2012 Turkey Point Nuclear Generating, Unit 3, Washington, D.C)
- ML14217A573 + (TN1299 - NRC (U.S. Nuclear Regulatory Commission), 2012; Turkey Point Nuclear Generating, Unit 4, Washington, D.C)
- ML14287A736 + (TN1465 - City of Homestead. 2012. City of Homestead Adopted Operating and Capital Budget 2012. Homestead, Florida)
- ML14252A905 + (TN1943 - NRC 2013 Peach Bottom Unit 1)
- ML14097A510 + (TN2887 - Use Land Cover Classification System (2007))
- ML14086A082 + (TN3223 - NJDEP Chloride and Water Use Reported Values Summary, Salem and Hope Creek Generating Stations, 2003-2013)
- ML14265A530 + (TN3285 - NRC 2014 Three Mile Island, Unit 2)
- ML14265A527 + (TN3346 - NRC Peach Bottom - Unit 1)
- ML14286A083 + (TN3874 - the State of the Birds 2010 Report on Climate Change United States of America)
- ML14282A748 + (TN391 - Ecology III (Ecology III, Inc.) 2008. Environmental Studies in the Vicinity of the Susquehanna Steam Electric Station, 2007 Water Quality, Benthic Macroinvertebrates, Fishes)
- ML18026A601 + (TN4956--EPA 2010 Tennessee Ambient Air Monitoring Plan 2010)
- ML12164A379 + (TN5 64-002-0504/NPDES Permit No. TN0026450 - Follow Up Report for ERCW Oil Spill)
- ML18036A926 + (TN5265 - Tennessee Valley Authority (Tva), Clinch River Site Characterization Project, Roane County Tennessee)
- ML14286A012 + (TN638 - Mcgonigal 2010 - Nutrients and Suspended Sediment in the Susquehana River, 2009)
- ML18026A606 + (TNBWG-2017- TN5043--TNBWG 2017)
- ML18026A607 + (TNBWG-2017- TN5329--TNBWG 2017 Gray Bat)
- ML18026A608 + (TNDOS-2017- TN5323--TNDOS Notice of Rulemaking Hearing)
- ML22305A660 + (TNF-XI 2022 Application for Revision to Competent Authority Certification USA/0653/AF-96, Revision En)
- EPID:L-2022-DOT-0006 + (TNF-XI 2022 Application for Revision to Competent Authority Certification USA/0653/AF-96, Revision En)
- ML18026A609 + (TNHP-2016- TN5295--TNHP-list2016 - a Guide to the Rare Animals of Tennessee)
- ML15342A101 + (TORMIS Computer Code Methodology Public Meeting Slides)
- ML23086C080 + (TP-LIC-LET-0051 Fuel and Control Assembly Qualification Report- Email)
- ML25115A232 + (TP-LIC-PRSNT-0044 - Natrium Mechanistic Source Term Methodology - ACRS Full Committee Meeting Presentation - May 2025)
- ML20141D918 + (TPDWR2:THERMAL Power Determination for Westinghouse REACTORS,VERSION2.Users Guide)
- ML18331A324 + (TPR-1190, Rev. 15, TMI-2 Canister Drying)
- ML22140A159 + (TPS_MNS_Privacy_Impact_Assessment_20220428)
- ML25322A303 + (TR 251024, Revision a, Strategy for Establishing Defense in Depth for Imsr Structures, Systems and Components)
- ML18229A231 + (TR Figure 5.3 Sat 2 and Selenium Plant)
- ML11346A335 + (TR Request for List of Planned Topicals from BWROG)
- ML19275H067 + (TR Transformation Workshop Overview Presentation)
- ML20175A150 + (TR Verification Review Form MRP-221, Rev 1-A Supplemental Information)
- ML20136G354 + (TR WCAP-14857, AP600 Long-Term Core Cooling Summary Rept)
- ML18065B047 + (TR on Use of Mcbend Code for Calculation of Neutron Fluences in PVs of Lwrs)
- ML25051A200 + (TR-0516-49416, Non-Loss-of-Coolant Accident Analysis Methodology, SE with No Open Items - Non-proprietary)
- ML17004A138 + (TR-0516-49422-NP, Revision 0, Loss-of-Coolant Accident Evaluation Model)
- ML18243A428 + (TR-18-04, Entergy Nuclear Operations, Inc. V. United Government Security Officers of America, Local 29, Fmcs (Case No. 180306-02193 (Arbitrator Chiesa))
- ML22292A052 + (TR-22-0301 Tom Gurdziel, e-mail Isnt It Really the Unit 1 Control Room at Nine Mile?)
- ML21291A202 + (TR-3023626 - Test Report for the Industrial Nuclear Company Outer Package, Raw Material Shipping Container (OP-RMSC); Docket 71-9387)
- ML14101A174 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page K-111 Through End)
- RA-14-033, TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page K-111 Through End + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page K-111 Through End)
- ML14101A182 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Cover Through Page 3-34)
- RA-14-033, TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Cover Through Page 3-34 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Cover Through Page 3-34)
- ML14101A184 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 4-1 Through Page 7-34)
- RA-14-033, TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 4-1 Through Page 7-34 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 4-1 Through Page 7-34)
- RA-14-033, TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page K-51 Through Page K-110 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page K-51 Through Page K-110)
- ML14101A186 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 7-35 Through Page 10-3)
- RA-14-033, TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 7-35 Through Page 10-3 + (TR-623, Rev. 0, Three Mile Island Generating Station, Development of Evacuation Time Estimates, Final Report. Page 7-35 Through Page 10-3)