Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Slower-than-Expected Rod-drop Times". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML14162A520  + (Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting)
  • ML24096B499  + (Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program)
  • ML19140A309  + (Slides: Public Meeting Presentation - Development of Performance Indicators (PI) with Potential Revisions to NEI 99-02 to Support a 10 CFR 50.54 (T) 24 Month Emergency Preparedness Program Review Frequency Option)
  • ML030910632  + (Slides: Reactor Pressure Vessel Head Material Degradation by B. Sheron at Penn State University)
  • ML031040126  + (Slides: Root Cause Analysis of Reactor Pressure Vessel Head Degradation at Davis-Besse Nuclear Power Station by FENOC)
  • ML061390087  + (Slides: Rsrc Subcommittee Meeting Rp&Ed Department)
  • ML19284B921  + (Slides: SLR Considerations for Cables - Fall 2019 IEEE ICC Meeting Presentation 9-30-19 (002))
  • ML030850768  + (Slides: by John Hickling, EPRI, Titled Crack Growth Rate of thick-section Alloy 600 Material Exposed to PWR Primary Water)
  • ML21176A199  + (Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry)
  • ML19011A462  + (Slideshow Presentation for January 22, 2019 Public Comment Webinar on the NRC Staffs Evaluation of Training and Experience for Administering Certain Radiopharmaceuticals)
  • ML21196A087  + (Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant)
  • ENS 40157  + (Slightly Contaminated Worker Transferred to the Hospital for Heat Stress)
  • ML20049H913  + (Sling,Tagging,Records,Storage,Exam & Proofload)
  • ML20058H141  + (Slings - Safety Insp)
  • ML20154R632  + (Slip Tendency,Dilation Tendency & Anisotropic Permeability at Yucca Mountain,Nv)
  • ML14105A338  + (Sliv Notice of Violation)
  • ML23103A394  + (Slomfp Reply Re DC ISFSI)
  • ML20005B043  + (Slope Stability Analysis of Shore Barrier)
  • ML20198M180  + (Slope Stability for Saturated Embankment)
  • ML19210C805  + (Sloshing of Water in Annular Pressure-Suppression Pool of BWRs Under Earthquake Ground Motions)
  • ML19260A265  + (Sloshing of Water in Torus Pressure-Suppression Pool of BWRs Under Earthquake Ground Motions)
  • ML21293A041  + (Slovenia Nuclear Innovation Seminar, Regulatory Frameworks for Nuclear Safety- MID-FINAL)
  • Information Notice 1996-07, Slow Five Percent Scram Insertion Times Caused by Viton Diaphragms in Scram Solenoid Pilot Valves  + (Slow Five Percent Scram Insertion Times Caused by Viton Diaphragms in Scram Solenoid Pilot Valves)
  • ML19332D867  + (Slow Strain Rate Testing of a Cyclically Stabilized a 516 Gr. 70 Piping Steel in PWR Conditions)
  • TSTF-032  + (Slow/Stuck Control Rod Separation Criteria)
  • ML051520146  + (Sludge Lance and Phone Line Through Containment Hatch While Fuel Movement in Progress)
  • ML20266E916  + (Sludge Lancing System Sl. Sheet 1)
  • 05000285/FIN-2013008-08  + (Sluice Gate Leakage Not Periodically Verified)
  • ML20002C532  + (Small & Intermediate Break LOCA Analysis for Big Rock Point Reactor W/Automatic Depressurization Sys & Jersey Nuclear Co Reload G Fuel)
  • ML20039A727  + (Small & Large Break Calculations for San Onofre Unit 2, Technical Rept)
  • ML16172A204  + (Small Acts of Inclusion)
  • ML20198T492  + (Small Bobbin Probe (0.640) Qualification Test Rept)
  • ML20003E403  + (Small Break Calculations for Westinghouse PWRs with Upper Head Injection)
  • ML20207D457  + (Small Break Critical Discharge - Roles of Vapor and Liquid Entrainment in Stratified TWO-PHASE Region Upstream of the Break)
  • ML19341B405  + (Small Break Experiment (Semiscale S-07-10D) Preliminary Comparison Rept)
  • ML20155G591  + (Small Break LOCA Analysis)
  • ML20073Q829  + (Small Break LOCA Analysis Methodology)
  • ML20215H880  + (Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31)
  • ML20214W475  + (Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31)
  • ML20211A103  + (Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31)
  • ML20245A455  + (Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31)
  • ML20213D965  + (Small Break LOCA Analysis for B&W 177FA Raised Loop Plant in Response to NUREG-0737,Item II.K.3.31)
  • ML20245A460  + (Small Break LOCA Analysis for B&W 177FA Raised Loop Plant in Response to NUREG-0737,Item II.K.3.31)
  • ML20217L997  + (Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model)
  • ML022270243  + (Small Break LOCA Evaluation in Support of Proposed Technical Specifications Changes & Exemption Request Use of Framatome Anp Advanced Mark-BW Fuel)
  • ML20149F997  + (Small Break LOCA No Room Cooling Power Rerate)
  • ML18100A291  + (Small Break LOCA Notrump Analysis Engineering Rept in Support of Fuel Upgrade/Margin Recovery Program)
  • ML19224B619  + (Small Break LOCA Procedure Changes)
  • ML13074A796  + (Small Break LOCA Sensitivity Study Summary Report, ANP-3205NP, Rev 0)
  • ML20024C530  + (Small Break LOCA in B&W 205 FA PWR, Diagram When Pressure Exceeds 1,600 Psig But Less than 2,150 Psig.Natural Circulation Occuring,Sys Voiding & Sys Depressurization Continuing)