Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266C335 + (Site Plan)
- ML20266C403 + (Site Plan)
- ML20266C247 + (Site Plan)
- ML20265E621 + (Site Plan)
- ML20266C418 + (Site Plan)
- ML20259E858 + (Site Plan)
- ML20266C270 + (Site Plan)
- ML17324A011 + (Site Plan)
- ML17339B218 + (Site Plan)
- ML20266F369 + (Site Plan Box Washing Facility as Built Drawing)
- ML20261M725 + (Site Plan Cresent Oklahoma)
- ML20266A317 + (Site Plan Drainage and Chemical Plan.Sheet 3 of 6)
- ML20266A307 + (Site Plan Drainage and Chemical Storage Plan.Sheet 1 of 6)
- ML20266A312 + (Site Plan Drainage and Chemical Storage Plan.Sheet 2 of 6)
- ML20266A321 + (Site Plan Drainage and Chemical Storage Plan.Sheet 4 of 6)
- ML20266A325 + (Site Plan Drainage and Chemical Storage Plan.Sheet 5 of 6)
- ML20266A330 + (Site Plan Drainage and Chemical Storage Plan.Sheet 6 of 6)
- ML20261A197 + (Site Plan STORM Drain Locations. Sheet 1 of 8)
- ML20266D806 + (Site Plan Utilities,Sanitary Drains)
- ML20203F899 + (Site Plan and Facility Layout)
- ML20262K023 + (Site Plan, as-built)
- ML20262D073 + (Site Plan,Civil)
- ML20263T134 + (Site Plan,Unit 3)
- ML20266H585 + (Site Plan. No Rev Date)
- ML20263M078 + (Site Plan. Rev Date Illegible)
- ML20264A553 + (Site Plan. Sheet 1)
- ML20263C106 + (Site Plan. Sheet 1 of 1)
- ML20262D466 + (Site Plan. Sheet 1 of 7)
- ML20264A559 + (Site Plan. Sheet 2)
- ML20262D470 + (Site Plan. Sheet 2 of 7)
- ML17213B336 + (Site Plan:Fire Protection Appendix R Fire Areas. Sheet 1)
- ML20349K919 + (Site Plot Plan)
- ML20265D706 + (Site Plot Plan)
- ML20236M777 + (Site Preliminary Geologic Investigation)
- ML20150E891 + (Site Preliminary Geologic Investigation. W/3 Oversize Drawings)
- ML20063D463 + (Site Preparation Activities Rept)
- ML20033B870 + (Site Preparation Activities Rept)
- ML20024B261 + (Site Problem Rept 107 Re Electromatic Relief Valve Malfunction.Problem Possibly Generic to Other Plants.Caused by Corrosion of Lever Pin,Hinge & Solenoid Bracket Resulting in Restraint of Lever in Ported Position)
- ML20136C084 + (Site Problem Rept 109 Re Reactor Protection Sys & Resistance Temp Detector Re Test Data.Resistance Temp Detector Retested & Reworked W/Design Improvement Retested.Results Encl)
- ML20136C078 + (Site Problem Rept 111 Re Corrections to Computer Point Listing.Bailey 855 Startup Problem Rept 2084 Encl)
- ML19322D219 + (Site Problem Rept 111:on 751222,hydraulic Relief Valves Installed in Field Found to Differ from Specified Drawings)
- ML20136C075 + (Site Problem Rept 112 Re Safety Features Actuation Sys & Reactor Protection Sys Errors.Startup Problem Repts 2087 & 2088 Encl)
- ML20136C067 + (Site Problem Rept 113 Re Reactor Protection Sys Inputs. Startup Problem Rept 2089 & Response Encl)
- ML20136C096 + (Site Problem Rept 125,Revision 1,re Failure of Matl in Makeup Pump Stretched Studs to Meet Requirements of Certificate of Conformance.Ke Moore 790712 Memo to RP Williamson Re Necked Makeup Pump Case Stud Encl)
- ML20136C035 + (Site Problem Rept 127 Re Standpipe Gasket Interfering w/2B Reactor Coolant Pump Shaft on 770516.Pan Dropped & New Gaskets & New O-ring Installed.Motor Subsequently Successful During no-load Run.No Further Action Required)
- ML20136C057 + (Site Problem Rept 127 Re Standpipe Gasket Interference W/ Shaft in 2B Reactor Coolant Pump Motor.Pan Was Dropped,New Gaskets & New O-ring Installed.Motor Subsequently Was Successfully no-load Run.No Further Action Required)
- ML20136C092 + (Site Problem Rept 135 Re Malfunctioning of Tektro Pressure Control Valve for High Pressure Lube Oil Sys on Reactor Coolant Pump Motor 1A.Valve Disassembled & Cleaned,But Will Not Hold Pressure & Will Not Relieve)
- ML19256B825 + (Site Problem Rept 144 Re Makeup & Purification Sys Startup Problem Rept 5068 & Resolution to SPR-144-00 Encl)
- ML19256B823 + (Site Problem Rept 145 Re Leak Which Developed in Casing Gaskets During Hot Operation of 2B Reactor Coolant Pump.Vent Valve Closed Between Gaskets & Pump Operation Continued W/Periodic Checks for Increased Leakage)
- ML19256B822 + (Site Problem Rept 146 of Unusual Occurence on 770906 Re Condensate Polisher Resin Migration.Engineering Evaluation Rept to Be Submitted to Site.No Further Action Required)
- ML20136C048 + (Site Problem Rept 149 Re Difference in Actual Range Between Hot & Cold Marks in Constant Load Supports of Reactor Coolant Pumps & Specified Range.Startup Problem Repts 2299 & 2436 Re Reactor Coolant Sys Encl)