Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20055E111 + (STP 2019006 Annual Assessment Letter)
- ML20280A545 + (STP 2020 PIR Request for Information)
- ML16172A019 + (STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016)
- ML031080617 + (STP Bmi Attachment 4 Pictures with Page Numbers for Referencing)
- ML110871988 + (STP COL - Draft 6C R1 Uploaded)
- ML110871690 + (STP COL - Draft 6C R1 Uploaded)
- ML110871685 + (STP COL - Draft 6C R1 Uploaded)
- ML110871694 + (STP COL - FW: Draft 6C R1 Uploaded)
- ML11173A083 + (STP COL - OI Call 12/29/2010 Participants)
- ML11173A084 + (STP COL - Open Items Call 12/22/2010 Participants)
- ML110871684 + (STP COL - Phone Call)
- ML110871625 + (STP COL - Phone Number for Wednesday)
- ML110871992 + (STP COL - South Texas Open Items Call 12/29/10)
- ML051260283 + (STP Characterization Process)
- ML031630541 + (STP Comparison to Vogtle for Sequencer TS)
- ML081400202 + (STP EOC Public Invitational Letter)
- ML22123A327 + (STP EP Exercise Inspection July 2022 RFI)
- ML20205A378 + (STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2)
- ML20080N216 + (STP Electric Generating Station Simulator Certification 4 Yr Rept)
- ML20206A772 + (STP Electric Generating Station Unit 1 Cycle 9 Colr)
- ML20217G275 + (STP Electric Generating Station,Unit 1 Cycle 8 Colr)
- ML20155J955 + (STP Electric Generating Station,Unit 2 Cycle 7,COLR)
- ML20132C881 + (STP Engineering Self Assessment Final Rept)
- ML22087A147 + (STP Exemption Confinement Draft RAI C-1)
- ML22087A148 + (STP Exemption Materials Draft RAI M-1)
- ML13252A402 + (STP FSEIS FRN (Update))
- NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted) + (STP Fire Hazards Analysis Report, Amendment 26 (Redacted))
- NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted) + (STP Fire Hazards Analysis Report, Amendment 26 (Redacted))
- ML13025A138 + (STP GSI-191 Bypass Sensitivity Report - Water Conductivity Added)
- ML20262G487 + (STP High Line W/Selected Tower Numbers. Sheet 2 of 3.Rev Date Incomplete)
- ML20262G492 + (STP High Line W/Selected Tower Numbers. Sheet 3 of 3.Rev Date Incomplete)
- ML18304A290 + (STP ISFSI PSP Rev 23 Review)
- ML21260A022 + (STP Inspection Report 2021 FOF (IP92707))
- ML15131A219 + (STP License Renewal - RAI Set 30)
- ML15131A272 + (STP License Renewal - RAI Set 31)
- NOC-AE-03001469, STP Nuclear Operating Co Answer Consenting to NRC 02/11/03 Order, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, and Indicating Decision to Not Request a Hearing + (STP Nuclear Operating Co Answer Consenting to NRC 02/11/03 Order, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, and Indicating Decision to Not Request a Hearing)
- ML030720277 + (STP Nuclear Operating Co Answer Consenting to NRC 02/11/03 Order, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, and Indicating Decision to Not Request a Hearing)
- NOC-AE-02001395, STP Nuclear Operating Co, Changes to Emergency Plan Implementing Procedures + (STP Nuclear Operating Co, Changes to Emergency Plan Implementing Procedures)
- ML022470215 + (STP Nuclear Operating Co, Changes to Emergency Plan Implementing Procedures)
- NOC-AE-02001318, STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures + (STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures)
- ML021410037 + (STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures)
- NOC-AE-02001313, STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures + (STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures)
- ML021270635 + (STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures)
- ML18010A037 + (STP Nuclear Operating Company - South Texas Project Electric Generating Station Closure of Investigation (014-2017-015))
- ML22243A131 + (STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown Timelines)
- ML22220A045 + (STP Nuclear Operating Company Biennial Problem Identification and Resolution Inspection Report (Cover and Enclosure 1))
- ML14304A719 + (STP Nuclear Operating Company Combined Response to Proposed Contention and Petition to Suspend Related to Alleged Need for Issuance of Waste Confidence Safety Findings)
- ML16210A044 + (STP Nuclear Operating Company Handouts for July 28, 2016 Public Meeting on GSI-191)
- ML15043A467 + (STP Nuclear Operating Company Response Opposing Petition to Supplement Environmental Impact Statements)
- ML15124A783 + (STP Nuclear Operating Company Response Opposing Motion to Reopen and Placeholder Contention Regarding Continued Storage Rule)
- ML20248H532 + (STP Nuclear Operating Company September 14, 2020, Presentation - Pre-Submittal Meeting for Proposed South Texas Project Moderator Temperature Coefficient Surveillance Requirement Technical Specification Change)