Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "SONGS-12/2007-Examination Approval Letter". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML052870264  + (SONGS, Notice of Forthcoming Meeting with California Edison Co in Rockville, MD Re San Onofre Nuclear Generating Station, Unit 3)
  • ML061740037  + (SONGS, RAI on the Proposed C* Amendment for Steam Generator Tube Inspection and Repair in the Tubesheet)
  • ML042050426  + (SONGS, Request Relief from Requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Concerning Inservice Inspection (ISI) Program Updates for the Third 10-Year ISI (TAC Nos. MC0334 & MC0335))
  • ML12194A136  + (SONGS, Steam Generator Tube, Unit 2, Wear Data 7-12-12)
  • ML022140296  + (SONGS, Unit 2 -- 30-Day Post Refueling Outage Response to NRC Bulletin 2002-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, & NRC Bulletin 2002-01, Reactor Pressure Vessel Heat Degradation & Reactor Coolant)
  • ML043620341  + (SONGS, Unit 3 - Request for Relief from Requirements of the ASME Code Concerning Reactor Vessel Head Penetration Repairs)
  • ML070260069  + (SONGS, Unit 3 - Single-Sided Operating License & Technical Specification/Licensee Controlled Specification Amd 208/200, B06-005, B05-005, & L05-007)
  • ML12194A163  + (SONGS, Unit 3 Steam Generator Tube Wear Data 7-12-12)
  • ML061310169  + (SONGS, Unit 3, License Amendment, Request to Shutdown Cooling Line Vent Line)
  • ML061310295  + (SONGS, Unit 3, Technical Specifications, Request to Shutdown Cooling Line Vent Line)
  • ML021490155  + (SONGS, Units 1 & 2 - Relief Requests to Support Alternative Repair Methods for Reactor Vessel Head Penetrations)
  • ML021220594  + (SONGS, Units 1 & 2, Response to Letter Dated Feb 15, 2002, Denial of Two Ncvs, Inspection Report 50-361/2001-19 & 50-362/2001-19)
  • ML070650044  + (SONGS, Units 2 & 3 - Decontrolled Version - Admin. Change to F.O.L. in Conjunction W/Commission Order EA-06-037 & Revisions to Physical Security Plan, Training & Qualification Plan, & Safeguards Contingency Plan)
  • ML063620285  + (SONGS, Units 2 & 3 - Issuance of Amd 209/201 Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec Excl Interest in Spent Fuel/Independent Spent Fuel Storage Installation (TAC Nos. MD0345 &)
  • ML070090278  + (SONGS, Units 2 & 3 - License Pgs - Amd 209/201 Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec Excl Interest in Spent Fuel/Independent Spent Fuel Storage Installation (TAC Nos. MD0345)
  • ML041260459  + (SONGS, Units 2 & 3, Inservice Inspection Program Relief Request ISI-38, Embedded Flaw Repair Process)
  • ML023260169  + (SONGS, Units 2 & 3, Letter, 15-Day Response to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity)
  • ML070090276  + (SONGS, Units 2 & 3, Technical Specifications, Order Approving Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec Excluding Its Interest in Spent Fuel & Independent Spent Fuel Storage ins)
  • ML021420220  + (SONGS, Units 2 & 3-(MB4508/4509) Issuance of Amds 188 & 179- Reactor Protection System and Engineered Safety Features Actuation System Sensor Response Time Testing)
  • ML072770906  + (SONGS, Units 2 and 3 - NRC Receipt of Licensee Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (TAC MD1629 and MD1630) - Correction)
  • ML062690303  + (SONGS, Units 2 and 3 - Order Approving Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec Excluding Its Interest in Spent Fuel & in Independent Spent Fuel Storage Installation (TAC MD034)
  • ML041140166  + (SONGS, Units 2 and 3, Request for Relief from the Requirements of the ASME Code Concerning Updates to Inservice Testing Program)
  • ML013390273  + (SONGS, Units 2 and 3, Request for Relief Regarding Reactor Pressure Vessel Nozzle Examinations)
  • ML13329A493  + (SONGS-1 Seismic Program for Long-Term Svc,Responses to Action Items Resulting from 850212 & 27 Meetings W/Nrc)
  • ML060830217  + (SONGS-10-2005-DRAFT Exam)
  • ML073371346  + (SONGS-12/2007-Examination Approval Letter)
  • ML103210225  + (SONGS-2010-10-DRAFT Outline Comments)
  • ML103200716  + (SONGS-2010-10-DRAFT Outlines)
  • ML103210271  + (SONGS-2010-10-Draft Operating Test)
  • ML103210275  + (SONGS-2010-10-Draft Operating Test Comments)
  • ML103210263  + (SONGS-2010-10-Draft Written Examination Comments)
  • ML103210290  + (SONGS-2010-10-Final Operating Test)
  • ML103210278  + (SONGS-2010-10-Final Outlines)
  • ML103210294  + (SONGS-2010-10-Post Examination Analysis)
  • ML110040973  + (SONGS-2010-10-Public Forms)
  • ML092580093  + (SONGS-3 Cycle 15 Startup Test Activity Reduction (STAR) Program Implementation Summary Report)
  • ML19298B884  + (SONGS-Information on AP Forms to Licensees and Manufactures to Assist in Meeting the IAEA Treaty Obligations)
  • ML20318A354  + (SONGS-Information on AP Forms to Licensees and Manufactures to Assist in Meeting the IAEA Treaty Obligations)
  • ML053530300  + (SONGS-Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors (Tacs. MB9610/9611))
  • ML20153D785  + (SOP 01-88, Radiation Safety for Radiac Calibr & Repair Facilities)
  • ML20093F634  + (SOP 5, Std Procedure for Performing Preventive Maint on Reactor & Associated Equipment)
  • ML20151Y100  + (SOP 98-15, Starting Reactor After Locating Failed Fuel Element)
  • ML20151Y093  + (SOP 98-16, Removing TRI-Flute on Element 10730)
  • ML20214G058  + (SOP HP-30, Evaluation of Exhaust Gas Stack Monitor Filters in Emergency)
  • ML20261B721  + (SOP Process Instrument Rack 1H13-P843)
  • ML19208A796  + (SOP Radiation Protection Program,Vol 5, Health Physics)
  • RIS 1999-04, SOURCES OF INFORMATION PREVIOUSLY PUBLISHED IN THE AEOD ANNUAL REPORT  + (SOURCES OF INFORMATION PREVIOUSLY PUBLISHED IN THE AEOD ANNUAL REPORT)
  • ML20259B978  + (SOV 1-HV-2452-1 Turb Driven Afp Main Steam Hdr 1 Isolation Valve Switch Development & Conn Diag. Sheet 33)
  • ML070600397  + (SP-1302-52-120, Rev 3, Quality Specification for Inspection and Localized Repair of the Torus and Vent System Coating, Oyster Creek)
  • ML102920070  + (SP-178, Revision 30 - Containment Leakage TEST-TYPE a Including Liner Plate)
  • ML22004A275  + (SP-PRO-008MVF RAI Corrections Final)