SONGS, Units 1 & 2, Response to Letter Dated Feb 15, 2002, Denial of Two Ncvs, Inspection Report 50-361/2001-19 & 50-362/2001-19
ML021220594
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/01/2002
From: Howell A
Plant Support Branch Region IV
To: Nunn D
Southern California Edison Co
References
EA-02-052, IR-01-019
Download: ML021220594 (6)


See also: IR 05000361/2001019

Text

SAFEGUARDS INFORMATION

May 1, 2002

EA No.02-052

Dwight E. Nunn, Vice President

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: RESPONSE TO LETTER DATED FEBRUARY 15, 2002, DENYING TWO

NONCITED VIOLATIONS IN NRC INSPECTION REPORT 50-361;-362/01-19

Dear Mr. Nunn:

This is in response to your letter dated February 15, 2002, in which you denied two violations of

NRC requirements documented as noncited violations (NCVs) in NRC Inspection Report

50-361/01-19 and 50-362/01-19, dated December 20, 2001.

The first noncited violation involved decreasing the effectiveness of your safeguards

contingency and training and qualifications plans in violation of 10 CFR 50.54(p). Specifically,

in Revision 24 to the Safeguards Contingency Plan, dated August 29, 2000, and Revision 22 to

the Training and Qualifications Plan, dated September 29, 2000, you removed the requirements

to maintain batons (and provide baton training to security officers), without substituting

equivalent equipment and training to support this functional requirement. In your February 15,

2002, response letter, following your assessment of this noncited violation, you concluded that

changes made to your Safeguards Contingency and Training and Qualifications Plans had not

reduced the effectiveness of your previously approved plans and satisfied the requirements of

10 CFR 50.54(p) and Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security

Plans Without Prior NRC Approval. For these reasons, you determined that the violation did

not occur. After careful review and consideration of your position, we reaffirmed that the

elimination of batons from your plans reduced the effectiveness of these plans in violation of

10 CFR 50.54(p). The basis for our conclusion is discussed in Enclosure 1 to this letter.

SAFEGUARDS INFORMATION

ENCLOSURES CONTAIN

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

PAGE IS DECONTROLLED

2

The second noncited violation involved providing inaccurate information to the NRC in violation

of the requirements of 10 CFR 50.9. Specifically, your October 17, 2000, white paper stated

that the local law enforcement agency (LLEA) was better equipped/trained to handle public

disturbances at your site. Based on a subsequent NRC inspection and investigation, the NRC

determined that prior to October 17, 2000 (date of the white paper), you did not have a recent

written agreement with your LLEA to this effect. After careful review and consideration of the

information previously provided, we reaffirmed that this violation occurred as previously stated.

The basis for our conclusion is documented in Enclosure 2.

The material enclosed herewith, contains Safeguards information as defined by 10 CFR 73.21

and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy

Act of 1954, as amended. Therefore, the enclosures will not be placed in the Public Document

Room.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, we will be pleased to discuss them with

you.

Sincerely,

/RA/

Arthur T. Howell III, Director

Division of Reactor Safety

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

Enclosures:

1.

Noncited Violation No. 1 - Decrease in Effectiveness of Security Plans

2.

Noncited Violation No. 2 - Inaccurate Information Provided to the NRC

3

cc WITHOUT safeguards enclosures:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

Gary L. Nolff

Power Projects/Contracts Manager

Riverside Public Utilities

2911 Adams Street

Riverside, California 92504

Eileen M. Teichert, Esq.

Supervising Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

David Spath, Chief

Division of Drinking Water and

Environmental Management

P.O. Box 942732

Sacramento, California 94234-7320

Michael R. Olson

San Onofre Liaison

San Diego Gas & Electric Company

P.O. Box 1831

San Diego, California 92112-4150

4

Ed Bailey, Radiation Program Director

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732 (MS 178)

Sacramento, California 94327-7320

Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento, California 94327-7320

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Robert A. Laurie, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, California 95814

Douglas K. Porter

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, California 91770

5

cc: WITH Safeguards Enclosures:

Vonna Ordez (NRR/DIPM)(MS O6H-02)

Alan Madison (NRR/DIPM)(MS O6H-02)

Elaine McNeil (NRR/DIPM)(MS O6H-02)

RIV Docket File - File Room Custodian

Security Inspector (Schaefer)

Electronic distribution from ADAMS by RIV without SAFEGUARDS portion of the letter

ADAMS Distribution Code (IE04)

Regional Administrator (EWM)

DRP Director (KEB)

DRS Director (ATH)

Senior Resident Inspector (CCO1)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCS)

Branch Chief, DRP/TSS (KMK)

STARFIRE Coordinator (NBH)

Scott Morris (SAM1)

NRR Event Tracking System (IPAS)

SONGS Site Secretary (SFN1)

G. F. Sanborn, D:ACES (GFS)

K.D. Smith, RC (KDS1)

F.J. Congel, OE (FJC)

OE:EA form (RidsOeMail Center)

DOCUMENT NAME: R:\\_SO23\\Denial of Two NCVs.wpd

RIV:DRS/PSB

PSB

C: PSB

C: ACES

C: DIPM/IOLB/NRR

Peer Review*

DWSchaefer *

GMGood *

GFSanborn

See E-Mail *

/RA/

/RA/

/RA/

via E-MAIL

03/ 03 /02

03/ 04 /02

03/ 12 /02

04/ 24 /02

03/ 25 /02

D: DRS

DRP/C

RC

OE:NRC

ATHowell III

CEJohnson *

KDSmith

JDixon-Herrity

/RA/

/RA/

/RA/

  • via TELCON

03 /02

03/ 19 /02

04/ /02

04/ 24/ 02

  • Previously Concurred

OFFICIAL RECORD COPY