Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22349A026 + (SDAA QAPD Topical Report Completeness Determination NRC Form 898)
- PMNS20220726, SDAA Quality Assurance Program Description (QAPD) Overview + (SDAA Quality Assurance Program Description (QAPD) Overview)
- ML23353A071 + (SDAA Quality Assurance Program Implementation Inspection Announcement Letter)
- B14005, SDC Auto-Closure Interlock Removal at Millstone Unit 2 + (SDC Auto-Closure Interlock Removal at Millstone Unit 2)
- ML20206L113 + (SDF-IP-05, Vault 1 Final, Rev. 0 - April 2008)
- ML20206L114 + (SDF-IP-07, Rev 0, Saltstone Disposal Facility Vault 4 Inputs, March 2008)
- ML12006A071 + (SDP Assessment of DC Panel D-11-2 Fault – Palisades)
- ML12006A067 + (SDP Assessment of Service Water Pump P-7C Coupling Failures Part 3)
- ML19269B737 + (SDP Charter Rev 2)
- IR 05000382/2003004 + (SDP Exercise 1: Background Memo _ NRC Inspection Report 50-382/03-04)
- ML072840198 + (SDP Notebook Transmittal Letter (Public Version))
- ML21320A093 + (SDP Overview Summary for November 4, 2021 PRA Users Group Meeting)
- ML062220561 + (SDP Phase 1 Screening Worksheet for IE, Ms, and B Cornerstones)
- ML072110430 + (SDP Phase 2 Exercise)
- ML24197A065 + (SDP Realism Public Meeting NEI Presentation)
- ML19263D136 + (SDP Timeline for September 25 2019 ROP Public Meeting)
- ML22144A257 + (SDP Timeliness Review May 2022 ROP Public Meeting)
- ML22311A546 + (SDP Timeliness Review Nov 2022 ROP Public Meeting)
- ML22269A480 + (SDP Timeliness Review Sept 2022 ROP Public Meeting)
- ML19206A044 + (SDP Updates for July 2019 ROP Monthly Meeting)
- ML24312A143 + (SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0)
- ML19144A190 + (SDP for Rope Memo from Mtm to Mxf (Rev 0))
- ML21245A182 + (SDR 16-01, Revision 3 Request for Withholding Information from Public Disclosure (EPID L-2020-LA-0004))
- ML23261A595 + (SDR Radiological Characterization Report, TR-22-011 Revision 1)
- ML20148D624 + (SDS Liner Qualification as High Integrity Container - Hanford Burial)
- ML082330306 + (SE - Order Approving Direct Transfer of the Saluda River Electric Cooperative, Incs Undivided Ownership Interest in Catawba Nuclear Station, Unit 1, to Duke Energy Carolinas, LLC, a Current Owner & Operator, & Nc Electric Membership Corpora)
- ML18064A561 + (SE Accepting 920110 Submittal Requesting Permission for Continued Operation at Plant Until Beginning of Fc 12 & Provided Jco)
- ML17292A396 + (SE Accepting 941227 & 950512 Requests for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Plant Second 10-yr ISI Program Plan Re Snubber Insps)
- ML17228A525 + (SE Accepting Current Steam Generator Overfill Protection Sys Design & Associated Plant Procedures & Operator Training,Per Util 900319 Response to GL 89-19)
- ML20141B555 + (SE Accepting First 10-yr Interval Inservice Insp Program Plan Request for Relief NR-29 for Braidwood Station,Units 1 & 2)
- ML20140J280 + (SE Accepting GE Proposed Change 4 to TS Re License DR-15)
- ML20127L422 + (SE Accepting IST Program Requests for Relief for Pumps & Valves)
- ML17354A671 + (SE Accepting Licensee 970924 Request for Relief from ASME Code,Section Xi,Requirements Requesting Removal of All Bolting from 4B Reactor Coolant Pump)
- ML18012A327 + (SE Accepting Licensee Mod to Scope of GL 89-10 Program at Plant)
- ML20217B524 + (SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii))
- ML20198S241 + (SE Accepting Licensee Request for Deviations from Recommendations in Reg Guide 1.97,Rev 2 for Temp & Flow Monitoring Instrumentation for Cooling Water to ESF Sys Components & Containment Isolation Valve Position)
- ML17180A859 + (SE Accepting Licensee Request for Relief Re Third ten-year Interval Inservice Insp Program for Facility)
- ML20217P744 + (SE Accepting Licensee Request for Second 10-yr Insp Interval to Use ASME Section IX Code Case N-416-1, Alternative Pressure Test Requirement for Replacement Items by Welding, Class 1,2 & 3,Div 1 at Plant Per 10CFR50.55a(a)(3)(i))
- ML20058M959 + (SE Accepting Licensee Response to GL 89-19, Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants)
- ML20045G886 + (SE Accepting Licensee Revised Submittal Re Unit 2 Reactor Vessel Criticality Safety Analysis)
- ML20203H833 + (SE Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds for Prairie Island Nuclear Generating Plant,Unit 2)
- ML18012A519 + (SE Accepting Proposed Changes to Bases Section of TS Re Best Estimate Chemistry Values for Beltline Matls)
- ML17229A733 + (SE Accepting Relief Request from Testing Requirements of ASME Boiler & Pressure Vessel Code,Section XI Under 10CFR50.55a(a)(3) & 10CFR50.55a(g)(5)(iii) for Unit 1)
- ML17158B837 + (SE Accepting Relief Requests RRPT-2 & RRPT-5 for ISI Pressure Test Program for Plant)
- ML16161A260 + (SE Accepting Request for Exemption from 10CFR70.24 Requirements for Units 1 & 2)
- ML20134B330 + (SE Accepting Revised QA Program for Plant)
- ML20154P749 + (SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1)
- ML20217C333 + (SE Accepting Topical Rept WCAP-14710(P), 1-D Heat Conduction Model for Annular Fuel Pellets, for Incorporation in App K LOCA Models)
- ML15239A502 + (SE Accepting Use of Code Case N-416 for Second 10-yr ISI W/Listed Provisions)
- ML18095A686 + (SE Accepting Util 830722,1107 & 14 & 860120 Responses to Generic Ltr 83-28, Post-Trip Review Data & Info Capability)