ML19206A044

From kanterella
Jump to navigation Jump to search
SDP Updates for July 2019 ROP Monthly Meeting
ML19206A044
Person / Time
Issue date: 07/25/2019
From: David Aird
NRC/NRR/DIRS/IRAB
To:
Aird D, NRR/DIRS, 301-287-0725
References
Download: ML19206A044 (4)


Text

Changes to IMC 0609 Appendix A

  • Revisions based on ROP Feedback Forms.
  • Added background discussion about support system initiators.

Separated and clarified the screening questions.

  • Added background discussion about exposure time.
  • Added background discussion about PRA function, especially as it compares to operability. Separated and clarified the screening questions.

1

Changes to IMC 0609 Appendix A

  • Incorporated questions regarding FLEX equipment from IMC 0609 Appendix O. Added background discussion and 3 screening questions.
  • Moved reactivity control questions from the reactivity control cornerstone exhibit to the barrier integrity cornerstone exhibit as fuel cladding integrity questions.

2

Impact

  • Enhanced clarity.

3

Changes to IMC 0609 Attachment 4

  • In general, revisions were in response to existing ROP Feedback Forms and to align with formatting guidance in IMC 0040
  • Table 2 was modified to include support system initiators and move reactivity management issues to the barrier integrity cornerstone (align with Appendix A and IMC 0612 Appendix B)
  • Clarification question added in Table 3 to direct users to Appendix A for spent fuel pool issues during shutdown (avoid erroneously going to Appendix G)
  • Minor changes made to allow for use with new reactor designs 4