Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML032461264 + (Revised General Office Operations Manager: Emergency Plan - Position Specific Procedure)
- LIC-04-0107, Revised Generic Letter 2003-01, Control Room Habitability Commitments + (Revised Generic Letter 2003-01, Control Room Habitability Commitments)
- ML042790399 + (Revised Generic Letter 2003-01, Control Room Habitability Commitments)
- ML17309A648 + (Revised Ginna Station Emergency Operating Procedures. with)
- GNRO-2017/00055, Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016 + (Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016)
- IR 05000416/2024002 + (Revised Grand Gulf Nuclear Station - Integrated Inspection Report 05000416/2024002)
- IR 05000416/2022013 + (Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013)
- ML20205N800 + (Revised Ground Water Compliance Action Plan & Application for Alternate Concentration Limits for Canonsburg,Pa,Umtra Project Site)
- CY-07-052, Revised Groundwater Monitoring Plan to Support HNP License Termination + (Revised Groundwater Monitoring Plan to Support HNP License Termination)
- ML100960495 + (Revised Guidance Regarding Coatings Zone of Influence for Review of Final Licensee Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reacto)
- ML20198C178 + (Revised Guide for Processing License Amends)
- ML16246A210 + (Revised Guidelines for Prioritization of Generic Safety Issues)
- ML25350C318 + (Revised HI-STORM Umax Amd 6 Pre-Submittal-Public Session)
- ML070820522 + (Revised Handout from 03/20/2007 Meeting)
- HNP-02-129, Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations + (Revised Harris Nuclear Plant Emergency Plan Implementing Procedure, PEP-110, Revision 10, Emergency Classification & Protective Action Recommendations)
- ML20030A512 + (Revised Hazards Summary Rept for Facility)
- ML20236E487 + (Revised Health & Safety Sections for Renewal Application of Special Nuclear Matls License SNM-21)
- ML20237H327 + (Revised Health Physics Procedure Hpp 6-2, Lab Radwaste Collection)
- ML20126K026 + (Revised Health Physics Procedures,For Frank H Neely Nuclear Research Ctr)
- ML20141N649 + (Revised Health Physics Procedures,Including Rev 1 to RAC-001, Radiological Instruments..., Rev 1 to RAC-003, Source Accountability & Leak Testing & Rev 1 to RAC-004, Particulate Radiation/Contamination Control)
- L-PI-13-086, Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46 + (Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46)
- ML20030A569 + (Revised Heatup Analysis for Exxon Nuclear Co Mixed Oxide G Fuel in Big Rock Point Plant Using Reduced Fuel Thermal Conductivity)
- ML20205D888 + (Revised Heavy Load Analysis Rept,Phase I)
- ML040930190 + (Revised Heller Ehrman White & Mcauliffe Llps Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004, Through February 29, 2004)
- ML23317A422 + (Revised Hermes Construction Permit)
- ML20071J980 + (Revised Hope Creek Event Classification Guide)
- ML20094P115 + (Revised Hope Creek Event Classification Guide, Including Rev 44 to Table of Contents,Rev 38 to Attachments Signature Page & Rev 25 to Attachments 6,7 & 9)
- ML20069N207 + (Revised Hope Creek Generating Station Event Classification Guide,Including Rev 33 to Table of Contents,Rev 12 to Attachment 1,Page 5 & Rev 7 to Attachment 2,Page 4)
- ML20096F474 + (Revised Hope Creek Generating Station Event Classification Guide, Including Rev 45 to Table of Contents,Rev 39 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 26 to Attachment 7 & Rev 26 to Attachment 9)
- ML18018A436 + (Revised Human Factors Design Evaluation Rept for Shearon Harris Unit 1 Control Room)
- ML20199F515 + (Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2)
- ML19319C504 + (Revised Hydrologic Engineering Summary Input for SER)
- IR 05000003/1982001 + (Revised IE Insp Repts 50-003/82-01 & 50-247/82-02 on 820208- 11.No Noncompliance Noted.Major Areas Inspected:Followup of Emergency Preparedness Items from 810511-20 Appraisal.Rept Includes Revised Page 22)
- ML21106A282 + (Revised IMC 1245 App C15, Construction Inspector Technical Proficiency Training and Qualification Journal)
- ML13247A349 + (Revised ISFSI Bases, Includes Revised Record of Revision, Revised Current Page List, and Revision 9 to Page B 3.1.5-1)
- ML17263A523 + (Revised ISI Program for 1990-1999 Interval)
- ML12223A091 + (Revised IST Relief Request PR-06)
- ML25062A170 + (Revised IST Valve Relief Request, VRR-003 Rev. 1, for the Fourth 10-Year IST Interval)
- ML15254A509 + (Revised ITS Conversion Change Tables)
- ML060040303 + (Revised Implementation Date for Amendment No. 248 Concerning the Number of Emergency Core Cooling Systems)
- GO2-09-072, Revised Implementation Date for License Amendment Request for Proposed Changes to Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 + (Revised Implementation Date for License Amendment Request for Proposed Changes to Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1)
- ML052710468 + (Revised Implementation Date for License Amendments & Technical Specification Changes Re Revision in the Number of Emergency Core Cooling Systems Required in Response to LOCA)
- W3F1-2015-0078, Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) + (Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR))
- ML020280361 + (Revised Implementation Period for License Amendment Nos. 246 and 124)
- L-2018-196, Revised Implementation Schedule for Open Phase Condition + (Revised Implementation Schedule for Open Phase Condition)
- ST-HL-AE-4764, Revised Implementation of Proposed Licensing Amend Re Tech Specs Based Upon Fuel Upgrade,Plant Safety & Revised Thermal Design Procedures + (Revised Implementation of Proposed Licensing Amend Re Tech Specs Based Upon Fuel Upgrade,Plant Safety & Revised Thermal Design Procedures)
- ML031700463 + (Revised Implementing Procedures)
- ML20069J264 + (Revised Implementing Procedures)
- ML20214U376 + (Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1)
- ML20106B677 + (Revised Implementing Reference Including,Rev 15 to AR-501, ICS I Annunciator Response, Rev 5 to AR-951, Wda Annunciator Response & Rev 2 to AR-953, Wdc Annunciator Response)
- ML030840596 + (Revised Improved TS Bases Manuals Unit 2)