Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24165A269 + (Resubmittal, Updated Final Safety Analysis Report)
- L-2020-058, Resubmittal. Re Use of Wood Flour for Unit 4 Condenser Tubes + (Resubmittal. Re Use of Wood Flour for Unit 4 Condenser Tubes)
- ML12094A409 + (Resubmittal; Beyond Nuclear Pleading to Co-Petition in the Matter of Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Fuel Pool Modifications)
- JAFP-09-0117, Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008 + (Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008)
- ML19296A043 + (Resubmitted 780718 Application for Amend to Certificate of Compliance 6698,Rev 7.Submittal Covers Local Variations in Lead Thickness of NFS-4 (NAC-1) Casks.Revised Pages & Drawings Encl)
- ML20236R230 + (Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included)
- ML20128A387 + (Resubmitted Application for Amend to License SNM-1227, Authorizing Change in Corporate Name from Siemens Nuclear Power Corp to Siemens Power Corp.Initial Application Submitted Via Withdrawn)
- ML20137B159 + (Resubmitted Application for Amend to License NPF-29, Modifying License Condition to Require Resolution of Hydrogen Control Issue Prior to Restart,Reflecting Payment of Application Fee)
- AECM-85-367, Resubmitted Application for Amend to License NPF-29, Modifying License Condition to Require Resolution of Hydrogen Control Issue Prior to Restart,Reflecting Payment of Application Fee + (Resubmitted Application for Amend to License NPF-29, Modifying License Condition to Require Resolution of Hydrogen Control Issue Prior to Restart,Reflecting Payment of Application Fee)
- ML20087N309 + (Resubmitted Application to Amend License NPF-11,revising Unit 1 Tech Specs to Reflect Changes Incorporated Into Unit 2 Tech Specs.Original Submittal of Change Request NPF-11/84-02 on 840113 Rejected by NRC)
- ML20072N841 + (Resubmitted COLR Hope Creek Generating Station Cycle 6/ Reload 5)
- ML20027B242 + (Resubmitted Contention 1 Based on Encl Us Court of Appeals, DC Circuit,820816 Opinion That NRC Original,Interim & Final Table S-3 Rule Resulted from Inadequate Consideration of Environ Impacts)
- ML20212D111 + (Resubmitted FOIA Request for Info on Loss of Ir-192 Sealed Sources Implanted in Pigs at Univ of Wisconsin)
- GO2-91-044, Resubmitted Forwarding Ltr for WNP-2 Annual Operating Rept 1990. Original Ltr Undated + (Resubmitted Forwarding Ltr for WNP-2 Annual Operating Rept 1990. Original Ltr Undated)
- NL-04-114, Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan + (Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan)
- NL-04-124, Resubmitted Indian Point, Units 1, 2 and 3 Physical Security Training and Qualification and Safeguards Contingency Plan + (Resubmitted Indian Point, Units 1, 2 and 3 Physical Security Training and Qualification and Safeguards Contingency Plan)
- 05000316/LER-1985-043, Resubmitted LER 85-043-00:on 851227,auxiliary Bldg Ventilation Grab Sample Not Obtained within Tech Spec Time Constraints.Caused by Personnel Error.Administrative Action Taken W/Individual Involved + (Resubmitted LER 85-043-00:on 851227,auxiliary Bldg Ventilation Grab Sample Not Obtained within Tech Spec Time Constraints.Caused by Personnel Error.Administrative Action Taken W/Individual Involved)
- ML20035H785 + (Resubmitted License Amend Request 93-001 to Licenses NPF-87 & NPF-89,changing TS to Replace Requirements Associated W/ Boron Dilution Mitigation Sys W/Alarms,Indicators,Procedures & Controls to Assure Proper Resolution of Potential Events)
- ML17292A020 + (Resubmitted Monthly Operating Rept for Jan 1996 for VC Summer Nuclear Power Station Unit 1 Due to Day Average Daily Power Level Calculations Error)
- ML20065G784 + (Resubmitted Montly Operating Repts for Feb 1994 for Point Beach Nuclear Plant,Units 1 & 2)
- ML18096A368 + (Resubmitted NPDES Noncompliance Notification,Containing Notary Seal & Correcting Date to 911104.Certification Should Be Replaced W/Encl Certification)
- ML20087N316 + (Resubmitted Proposed Application to Amend License NPF-11 Changing Tech Specs Reflecting Unit 1 Changes Incorporated Into Unit 2 Tech Specs)
- ML17228B418 + (Resubmitted Request for Changes to Official Svc List for Plant,Effective 960205)
- ML17164A238 + (Resubmitted Request for Extension of Time to File Request for Hearing and Petition for Leave to Intervene)
- ML20096E510 + (Resubmitted Rev 13 to QA Program)
- L-2003-036, Resubmitting of Response to NRC Comment on Relief Request 30 & 31 + (Resubmitting of Response to NRC Comment on Relief Request 30 & 31)
- ML18139A326 + (Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors)
- ML18139A327 + (Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors)
- ML20151Z342 + (Result of Bethsy Test 9.1.B Using RELAP5/MOD3)
- 05000255/LER-2077-023-43, Result of Pressure Loss from Waste Gas Decay Tank T-101A + (Result of Pressure Loss from Waste Gas Decay Tank T-101A)
- ULNRC-05576, Result of Reactor Pressure Vessel Head Inspection + (Result of Reactor Pressure Vessel Head Inspection)
- DCL-05-017, Result of Steam Generator Inspections for Plant Twelfth Refueling Outage + (Result of Steam Generator Inspections for Plant Twelfth Refueling Outage)
- ML050750021 + (Result of Steam Generator Inspections for Plant Twelfth Refueling Outage)
- ML021220679 + (Result of the River Bend Station SDP Phase 2, Notebook Benchmarking Visit)
- ML19274D552 + (Results & Analysis of 781127 Secondary Containment Leak Rate Test.Shows Secondary Containment Capability to Main 1/4 Inch Water Vacuum Under Calm Wind W/Sys in Leakage Rate of Not More That 12,000 Scfm Before Refueling)
- ML20128P108 + (Results & Code Pedictions for Abcove Aerosol Code Validation - Test AB5, Summary of Hedl Rept HEDI-TMI 83-16. Supporting Documentation Encl)
- ML18044A540 + (Results & Evaluation of Tests on Phillips Red Head Self- Drilling Expansion Anchors for CPC Facility in South Haven, Mi)
- ML061710022 + (Results - Onsite and Offsite Results - Contours)
- ML20086T578 + (Results Improvement Program)
- ML20054K626 + (Results Obtained from Thermal Modeling & Ecological Studies at North Anna Power Station)
- ML12198A058 + (Results Summary for the Area 5 Radioactive Waste Management Site (Rwms) Performance Assessment Model Version 4.111)
- ML14211A389 + (Results for Periodic Review of RG 1.69)
- ML18044A379 + (Results from Charge Preamplifier Temp Test)
- ML11213A261 + (Results from Cost-Benefit Analysis of Radwaste System Enhancements)
- ML18024B297 + (Results from Metallographic Examination of Core Spray Piping Weld from Facility)
- ML20057E697 + (Results from Two Workshops: State Radiation Control Programs Developing and Amending Regulations and Funding)
- ML20236C377 + (Results from the DCH-1 Experiment)
- ML20059P021 + (Results from the Nuclear Plant Aging Research Program:Their Use in Inspection Activities)
- ML020710655 + (Results from the Samples Taken in an Attempt to Reduce Additional Monitoring Requirements)
- ML20155G453 + (Results of 1,000 H Test After SPDS Implementation for Confirmatory Review)
- ML20211D161 + (Results of 2000 Hour Test at 385 Bhp/Cyl on 38TD8-1/8 OP Engine,Rept R-5.08-0236)